29 August 2024
2024 Half Year Financial
Results
·
Total Recordable Injury Frequency Rate (TRIFR) of
2.11 at the end of H1 2024 with nine recordable injuries during the
period of which 5 were medical treatment cases
·
Gold production of 167,140 ounces (oz) (H1 2023:
176,631 oz) in line with expectations reflecting lower production
in Q1 due to the scheduled 14-day maintenance shutdown at the Syama
Sulphide Plant and final portion of waste stripping at
Mako
·
Revenue of $341.5 million, an increase of 4% from
the same period last year (H1 2023: $329.5 million), from gold
sales of 157,321 oz at an average realised price of $2,170/oz (H1
2023: 173,058oz at $1,906/oz)
·
Earnings before interest, tax, depreciation, and
amortisation (EBITDA) of $116.4 million, an increase of 14% from
same period last year (H1 2023: $101.4 million) with a 14% increase in gold price and 2% decrease in operating
costs offsetting a 9% reduction in gold sold
·
Net income after tax of $33.4 million (H1 2023:
$87.7 million) due to $16.7 million of extra tax expense as the tax
exoneration in Senegal ended in July 2023, as well as $37.5 million
of non-cash unrealised foreign exchange differences
·
Improved All-In Sustaining Cost (AISC) of
$1,442/oz, 2% lower than H1 2023 ($1,469/oz). AISC is expected to
continue to track lower in H2
·
Capital expenditure (excluding exploration) of
$44.3 million (H1 2023: $36.7 million), with spend expected to be
H2-weighted and in line with full-year guidance of $115 - 145
million
·
Net cash increasing to $96.6 million (H1 2023 net
debt of $17.2 million) with cash and bullion at 30 June 2024 of
$143.4 million
·
Final $25.0 million of Group loan facility repaid;
Company borrowings of $47.5 million consisting of in-country
overdraft facilities in Mali and Senegal
·
Syama Sulphide Conversion Project (SSCP)
progressing on plan with most of the earth and civil works
engineering and design works nearing completion
·
Full year 2024 production and cost guidance
maintained at 345,000 - 365,000 oz at an AISC of $1,300
-1,400/oz
Note: Unless otherwise
stated, all dollar figures are United States dollars
(US$).
Resolute Mining Limited (Resolute,
Group or the Company) (ASX/LSE: RSG) is pleased to announce the
Company's half year financial results for the half year ended 30
June 2024 (H1 2024).
Resolute's Chief Executive Officer,
Mr Terry Holohan, commented:
"It has been an exciting first half
of 2024 for Resolute. With a net cash position of $96.6 million and
remaining fully unhedged the Company is in its strongest position
for several years and on track to meet its full year guidance and
longer-term growth plans, including the SSCP and mine-life
extension at Mako.
The SSCP is progressing on schedule
with most of the earthworks and foundations complete. This project
will add flexibility to the Syama operation from mid-2025 allowing
up to 4Mtpa of the higher-grade sulphide ores to be processed
whilst retaining the ability to process oxide material.
In Q1 this year we took the Sulphide
plant off-line for a 14- day extended maintenance to perform
repairs but also to fully inspect the condition of the plant
following the major rebuild that took place in Q1 2022. I am
pleased to report that the plant remains in a great condition. It
is now clear to me that over the last two years we have
demonstrated our ability to operate and maintain the plant and
produce gold from sulphide ore both efficiently and economically.
This now gives us all the full confidence to systematically
increase our treatment rates of our higher grade sulphide mineral
resources over the next 5 to 10 years.
In parallel, the Company remains
focused on extending the life of the Mako operation and is pleased
with the results of drilling at both the nearby Tomboronkoto and
Bantaco exploration projects. An updated Mineral Resource
Estimate for Tomboronkoto is expected in Q3 2024, along with an
initial Mineral Resource Estimate for the Mansala Prospect in
Guinea.
The Company's TRIFR increased in H1
to 2.11 from 1.20. While these reflect minor incidents, and not
Lost-Time Injuries (LTIs), safety remains our number one priority
and we are working hard to continue improving our safety culture
and reduce all incidents.
As evidenced by the steady decrease
in AISC from Q1 to Q2, the Company has also demonstrably continued
its efforts to lower costs. We anticipate a continuation of this
trend in the second half of 2024. This core focus, in addition to
prioritising the stability of gold production, is key to further
strengthening Resolute's position as well as underpin the Company's
promising growth initiatives."
Corporate
Director Appointments
On 20 March 2024, the Company
announced the appointment of Ms Adrienne Parker as a Non-Executive
Director of the Company. Ms Parker joins as
a member of both the Audit & Risk as well as the Remuneration
Committees.
Ms Parker is a lawyer with over 25
years' experience in the resources, energy, and infrastructure
sectors, with an additional emphasis on major projects as well as
running complex disputes. Adrienne was most recently Partner and
Head of the Perth office at global law firm Pinsent Masons, where
she advised in connection with the procurement and delivery of
infrastructure in the mining, oil and gas and renewables sectors,
including rail, roads, ports and airports.
Her experience in the resources and
energy sector includes major projects in Australia, Papua New
Guinea and Africa. This has included advice on risk assessment and
management, procurement models and strategy, the preparation and
negotiation of mining services and supply agreements, as well as
EPC and EPCM contracts. Ms Parker has also acted in large-scale
disputes in many jurisdictions.
Chair Transition
On 28 May 2024, the Company
announced the appointment of Mr Andrew Wray as a Non-Executive
Director of the Company and advised that Mr Martin Botha will
retire as Chair and Non-Executive Director on 31 August 2024. Mr
Wray has been appointed as a member of the Audit & Risk,
Remuneration and Nomination Committees and will succeed Mr Botha as
Chair of the Board of Directors of Resolute.
Mr Wray is a seasoned mining
executive with extensive executive and board-level experience in
Africa. Mr Wray has held positions at both CEO and CFO level, as
well as having substantial banking and finance experience advising
companies in the mining and other sectors. He has led successful
business turnarounds with responsible project development, built
leadership teams, and executed corporate acquisitions as well as
asset sales.
Mr Wray, the former CFO of Acacia
Mining, was most recently CEO of West African focused gold miner
Golden Star Resources. Prior to this Mr Wray was CEO of the
specialist mining investment company La Mancha.
SSCP Update
The SSCP, that will increase
sulphide processing capacity from the current level of 2.4Mtpa to
4Mtpa, is progressing well with no LTI's after approximately 76,500
person-hours worked until the end of June 2024.
Most of the earth and civil works
engineering and design works are complete, with minor items
outstanding. Structural engineering and design are in progress and
most of the mechanical engineering design is complete with a few
minor packages outstanding. The manufacture of the long lead items
is progressing and on schedule.
Commissioning remains on track for
mid-2025, and the project remains on budget.
Ravenswood Update
During the first half of 2024,
Resolute and Ravenswood Gold Pty Ltd, the owner for the Ravenswood
Gold Mine, worked to restructure the Gold Price Contingent
Promissory Note and Vendor Financing Promissory Note to support the
Ravenswood Mine in its financing.
Resolute and Ravenswood agreed to
amend the Gold Price Contingent Promissory Note, including that the
requirements of the clause regarding Payment of Gold Price
Contingent Amount of the Original Gold Price Contingent Promissory
Note were deemed to have been met. The Gold Price Contingent Amount
payable to Resolute is A$50 million (the highest payable amount)
and is payable in two tranches as follows:
· A$30
million paid to Resolute and received on 19 June 2024;
and
· A$20
million to be paid to Resolute no later than 30 September
2024.
Additionally, Resolute amended the
A$50 million Vendor Financing Promissory Note that was originally
due in March 2027. The new structure is as follows:
· Reset
the principal to the increased amount of A$64 million to account
for capitalised accrued interest;
· Maintain the annual coupon at 6% until 30 June 2025 after
which the annual coupon increases to 12%. Interest will be
capitalised and is to be paid to Resolute upon maturity;
and
· Promissory note maturity extended to 31 December 2027 but may
be repaid early on future Ravenswood financings, liquidity
event(s), or excess cash from Ravenswood.
The Upside Sharing Promissory Note
(up to A$150 million) linked to the investment outcomes of
Ravenswood for EMR Capital - one of the owners of Ravenswood -
remained unchanged.
Mali Mining Code Update
The State of Mali adopted the
implementation decree of the 2023 Mining Code on the 9th July 2024.
As noted previously, Resolute does not expect any impact on its
operation in Mali and has a Mining convention for its Syama and
Tabakoroni licences until 2029. Resolute continues to work with the
government in a clear, constructive and responsible
manner.
Environment and Social Governance
Resolute's TRIFR as at 30 June 2024
was 2.11 and recorded no LTIs, significant environmental incidents,
regulatory non-compliances, or grievances in H1 2024. Resolute
successfully completed its annual audits against the LBMA's
Responsible Gold Guidance at both sites. The Company will be
undergoing audit against the World Gold Council's Responsible Gold
Mining Principles and the Conflict Free Gold Standard in Q3
2024.
In H1, Resolute improved its ESG
ratings on the Sustainalytics, Bloomberg and MSCI platforms across
all Environmental, Social & Governmental pillars. The Company's
MSCI ESG rating improved to AA and is now considered a Leader by
Bloomberg and MSCI in its peer group.
In July, the UNESCO World
Heritage Committee removed the Niokolo-Koba National Park, located
close to Resolute's Mako Mine, from the list of World Heritage
Sites in Danger. This decision was taken following the positive
steps taken by the Senegalese Government, which have contributed to
improving the natural site's state of conservation. Over the past
five years, Resolute has provided funds to the National Park via
its biodiversity offset commitment as well as supporting the
efforts of the Government to improve the Park's state of
conservation.
Exploration & Resources
Total exploration expenditure in H1
2024 was $9.9 million, with drilling programs continuing in Senegal
($4.4 million), Mali ($4.1 million) and Guinea ($1.4 million)
throughout the first half of 2024.
In January an initial Mineral
Resource Estimate was announced at Tomboronkoto of 403koz grading
1.2g/t (at a cut off grade of 0.5g/t). Throughout H1 drilling at
Tomboronkoto concentrated on extending the mineralisation down dip
of the existing Resource and along strike to the west. During Q2
drilling commenced at Bantaco with a planned program of wide spaced
drilling to traverse the outcropping gold mineralisation and
coincident geochemical anomalies.
In Mali, diamond drilling continued
at Syama North focusing on expanding the high-grade gold
mineralisation which lies below the currently planned open pit
design. These high-grade shoots have higher grade than the open pit
resource. An updated Mineral Resource Estimate for Syama North is
expected to be published during the second half of 2024.
In Guinea, a series of diamond
drillholes were completed in Q2 to increase the knowledge on the
deposit to underpin a structural and geological model. A 3D
geological model has been built and the initial Mineral Resource
Estimate is underway. The initial Mineral Resource for Mansala is
expected in Q3 2024.
Syama Gold Mine, Mali
Syama has performed in line with
expectations for the first half of 2024. Sulphide ore mined in H1
2024 was 11% higher than the prior year as a result of productivity
improvements. Underground sulphide grades were 9% lower than H1
2023 but were in line with expectations.
Sulphide ore processed increased by
4% and the head grade decreased by 8% from the same period last
year leading to a 4% decrease in gold poured in the sulphide
circuit (76,637 oz vs 79,731 oz in H1 2023). The higher throughput
achieved, despite the scheduled 14-day shutdown of the plant in Q1
for maintenance, was the result of improved plant availability and
increased milling rates due to enhancements made to the crusher
circuit over the past nine months. In Q3 2024 sulphide gold
production is expected to decrease slightly from lower tonnes
milled due to constraints during the rainy season. Milled grades
and tonnages are then expected to increase in the latter part of
the year.
In H1 2024 at the oxide operations
ore tonnes mined decreased by 54% (447kt) at a 4% lower grade (1.62
g/t versus 1.69g/t in H1 2023) due to the reduction in available
oxide ore. Throughput and head grade were 7% and 15% lower
respectively due to the larger contribution of lower grade
stockpiles. This led to 17% less gold production in H1 2024 (27,422
oz) than the same period in 2023. During the second half of Q2
oxide ore stockpiles were blended with higher grade ore from the
Samogo and Paysans pits. In H2 2024 head grades and processed
tonnages are expected to be similar to H1 2024 with continued
blending of stockpiles and run of mine ore. In Q3 2024, due to the
rainy season, processed tonnage is expected to be 10% lower than Q2
2024 followed by an increase in Q4 2024.
Table 1: Syama Production and Cost
Summary
Summary
|
Units
|
Q2
2024
|
Q1
2024
|
H1
2024
|
H1
2023
|
Mining
|
Sulphide
|
|
|
|
|
|
Ore Mined
|
t
|
636,539
|
646,959
|
1,283,498
|
1,153,690
|
Mined Grade
|
g/t
|
2.68
|
2.57
|
2.62
|
2.87
|
Oxide
|
|
|
|
|
|
Ore Mined
|
t
|
266,513
|
180,343
|
446,856
|
972,309
|
Mined Grade
|
g/t
|
1.56
|
1.71
|
1.62
|
1.69
|
Processing
|
Sulphide
|
|
|
|
|
|
Ore Processed
|
t
|
609,714
|
511,290
|
1,121,004
|
1,074,980
|
Processed Grade
|
g/t
|
2.75
|
2.65
|
2.71
|
2.94
|
Recovery
|
%
|
79
|
79
|
79
|
79
|
Gold Poured
|
oz
|
41,930
|
34,707
|
76,637
|
79,731
|
Gold Sold
|
oz
|
42,661
|
29,348
|
72,008
|
77,821
|
Oxide
|
|
|
|
|
|
Ore Processed
|
t
|
374,949
|
377,326
|
752,275
|
809,849
|
Processed Grade
|
g/t
|
1.32
|
1.31
|
1.32
|
1.55
|
Recovery
|
%
|
87
|
85
|
85
|
83
|
Gold Poured
|
oz
|
13,669
|
13,752
|
27,422
|
33,057
|
Gold Sold
|
oz
|
13,669
|
13,752
|
27,422
|
32,071
|
Cost
|
Syama combined
|
|
|
|
|
|
Total Capital Expenditure
|
$m
|
17.0
|
19.0
|
36.0
|
36.8
|
AISC
|
$/oz
|
1,502
|
1,418
|
1,463
|
1,494
|
Mako Gold Mine, Senegal
H1 2024 mining tonnage was 19%
higher than the prior year as the last portion of the scheduled
Stage 7 stripping was completed in Q1 and the mining plan was
accelerated to ensure mining completion prior to the rainy season
in 2025. As expected, the mined grade in H1 2024 was similar to the
previous year period. Ore tonnes processed increased 5% (to 1.1
million tonnes) from H1 2023 due to a softer mill feed blend caused
by reduced basalt content. The head grade decreased 8% (from
2.08g/t in H1 2023 to 1.91g/t in H1 2024) as expected.
H1 2024 production from Mako was
63,081 oz at an AISC of $1,256/oz. Mako production was very similar
to the prior year period (H1 2023: 63,843 oz), at a 4% lower AISC
as a result of lower unit processing costs, lower stripping ratio
and lower sustaining capital expenditure.
Production is expected to be
weighted towards H2. We expect AISC to fall further and meet full
year guidance of $1,100-1,200/oz as capital expenditures continue
to decrease throughout the remainder of the year.
Table 2: Mako Production and
Cost Summary
Summary
|
Units
|
Q2
2024
|
Q1
2024
|
H1
2024
|
H1
2023
|
Mining
|
|
|
|
|
|
Ore Mined
|
t
|
1,064,722
|
527,772
|
1,592,494
|
1,334,922
|
Mined Grade
|
g/t
|
1.90
|
1.80
|
1.87
|
1.91
|
Processing
|
|
|
|
|
|
Ore Processed
|
t
|
537,787
|
565,370
|
1,103,157
|
1,047,790
|
Processed Grade
|
g/t
|
2.15
|
1.73
|
1.91
|
2.08
|
Recovery
|
%
|
93
|
93
|
93
|
92
|
Gold Poured
|
oz
|
35,188
|
27,892
|
63,081
|
63,843
|
Gold Sold
|
oz
|
31,991
|
25,900
|
57,891
|
63,166
|
Financials
|
|
|
|
|
|
Total Capital Expenditure
|
$m
|
2.6
|
5.8
|
8.4
|
12.5
|
AISC
|
$/oz
|
1,100
|
1,451
|
1,256
|
1,308
|
Financial Performance
The H1 2024 net income after tax was $33.4
million with a Group EBITDA of $116.4 million which was 15% higher
than the comparative period in 2023 reflecting:
· Higher
revenue of $341.5 million from gold sales of 157,321 oz at an
average realised price of $2,170/oz, up 14%, compared to H1
2023
· Stable
costs, H1 2024 AISC of $1,442/oz (versus $1,469/oz in H1 2023),
despite inflationary pressures seen in fuel and
consumables
· $16.7
million of extra tax expense as the exoneration in Senegal ended in
July 2023 as well as $37.5 million of non-cash unrealised foreign
exchange differences on assets
H1 2024 has seen cost reductions coming through
with Group AISC reducing from $1,487/oz in Q1 to $1,402/oz in Q2.
We expect further reduction in AISC across both operation during
the second half of 2024 to reach full year cost guidance of $1,300
- 1,400/oz for the Group. The financial performance of Resolute for
H1 2024 is summarised below.
Table 3: Half
year Profit and Loss
Profit and Loss Analysis ($'000s)
|
H1 2024
|
H1 2023
|
Revenue
|
341,503
|
329,499
|
Cost of sales excluding depreciation
and amortisation
|
(193,509)
|
(193,413)
|
Royalties
|
(19,639)
|
(18,916)
|
Administration and other corporate
expenses
|
(6,627)
|
(9,081)
|
Exploration expense
|
(5,340)
|
(6,368)
|
EBITDA
|
116,388
|
101,721
|
Depreciation and
amortisation
|
(53,162)
|
(47,459)
|
Net interest and finance
costs
|
(3,766)
|
(7,120)
|
Inventories net realisable value
movements and obsolete consumables
|
14,724
|
8,543
|
Fair value movements and unrealised
treasury transactions
|
(5,292)
|
29,837
|
Other
|
(15,514)
|
(5,271)
|
Net
profit before tax
|
53,377
|
79,801
|
Income tax
benefit/(expense)
|
(19,976)
|
7,878
|
Net
profit after tax
|
33,401
|
87,679
|
Cashflow
Movements in the cash and bullion
balances are summarised in the cashflow waterfall below:
Figure 1: Half year cash flow
Balance Sheet
Net cash increased by $82.6 million
to $96.6 million as at 30 June 2024 (31 December 2023:
$14.0 million) including cash and bullion of $143.4 million. Total
borrowings as at 30 June 2024 were $47.5 million consisting of
in-country overdraft facilities in Mali and Senegal.
During Q2 Resolute received a
payment of A$30 million from the sale of Ravenswood (in Q1
2020).
Resolute continued to invest across
its operations in H1 2024 with spending on development, property,
plant, and equipment totalling $44.4 million (H1 2023: $36.1
million) including expenditure on the Syama Sulphide Conversion
Project, as well as capitalised stripping costs at both
mines.
Resolute is in the process of
finalising documentation for a new working capital facility with
more details to be provided in due course. This facility will be
used for opportunistic organic and inorganic growth.
CY2024 Guidance
Resolute maintains its full year
2024 production guidance of 345,000 - 365,000 oz, noting the stable
performance at the Syama Complex and Mako.
Resolute maintains its Group cost
guidance at an AISC of $1,300 - 1,400/oz and its capital
expenditure guidance of $115 - 145 million.
Key
H2 2024 Deliverables
· Update
Tomboronkoto Mineral Resource Estimate
· Initial
Mansala Mineral Resource Estimate
· Continued construction of the SSCP
· Initiate studies on Syama Phase II Expansion
Contact
Resolute
Matthias O'Toole-Howes,
Corporate Development and Investor Relations
Manager
matthias.otoolehowes@resolutemining.com
+44 203 3017 620
|
Public Relations
Jos Simson, Tavistock
resolute@tavistock.co.uk
+44 207 920 3150
Corporate Brokers
Jennifer Lee, Berenberg
+44 20 3753 3040
Tom Rider, BMO Capital Markets
+44 20 7236 1010
|
Authorised by Mr Terry
Holohan, Managing Director and Chief Executive
Officer