VANCOUVER, Jan. 19, 2017 /CNW/ - Transatlantic Mining
Corp. (the "Company") (TCO:TSX.V) announces surface drill
results from the Alder Gulch Property-US Grant Mine & Mill
Complex located in the Virginia City Mining District of
Madison County, Montana
(USA). This report contains initial results from the phase 1
drill program which successfully intersected gold and silver
mineralization, including wide high-grade gold intercepts.
The intent of the program was to target a new area of the US Grant
Deposit with drilling to increase confidence in the future mining
plan should completion of a mining study support the technical
feasibility and economic viability of the project. The resulting
assays indicate that holes were correctly targeted with some
measure of success.
Highlights Include:
- SURDH #6: 8.9 ft. (2.8 m) true width at 0.564 troy
ounces per ton ("opt") (19.3 g/t) gold equivalent ("Au
Eq.")
(Includes 2.8 ft. (0.85 m) at 1.07 opt (36.8
g/t) Au Eq.
- SURDH #1: 5.9 ft. (1.8 m) true width at 0.357 opt
(12.2 g/t) Au Eq.
Findings from the Maiden Mineral Resource report(1)
support the potential for the discovery of additional mineral
resources within the US Grant property. Figure 1 and Figure 2 show
the location of the existing mineral resources and the position of
the intersections from the Phase 1 Diamond Drilling
Program.
Drill Results
The surface drill program comprised 14
holes for a total of 1,457 metres. Recent assay results are
derived from diamond drilling conducted in October and November in
a section of the deposit that had limited historical drilling. The
drill holes successfully intersected gold and silver
mineralization, including selective areas of high-grade gold and
silver material. These include two wide, high-grade gold and silver
intercepts in SURDH#1 and SURDH#6. These results are shown in Table
1 along with assay results from 6 other holes in the Phase 1
program. Additional assays are pending and will be released as they
become available.
Table 1 Assay Results from the Phase 1 Diamond
Drilling Program Conducted in October and November 2016
Hole
#
|
from
(ft.)
|
to
(ft.)
|
true width
(ft.)
|
Au
opt
|
Ag
opt
|
Au Eq.
opt
|
Au
g/t
|
Ag
g/t
|
Au Eq.
g/t
|
SURDH#1
|
159
|
167.7
|
5.9
|
0.286
|
5.3
|
0.357
|
9.8
|
181.52
|
12.24
|
Includes
|
|
|
4.4
|
|
|
|
|
|
14.2
|
SURDH#3
|
122
|
128
|
3.5
|
0.093
|
1.8
|
0.116
|
3.19
|
60
|
3.99
|
|
|
|
|
|
|
|
|
|
|
SURDH#4
|
198
|
205
|
6.7
|
0.083
|
3.1
|
0.124
|
2.86
|
104.96
|
4.24
|
|
|
|
|
|
|
|
|
|
|
SURDH#5
|
201
|
207.6
|
6.4
|
0.172
|
2.3
|
0.203
|
5.9
|
78.88
|
7.33
|
Includes
|
|
|
2.1
|
|
|
|
|
|
16.9
|
SURDH#6
|
177.4
|
186.7
|
8.9
|
0.522
|
3.1
|
0.564
|
17.91
|
106.44
|
19.35
|
Includes
|
|
|
2.8
|
|
|
|
|
|
36.8
|
SURDH#8
|
191.5
|
195
|
3.3
|
0.195
|
3.1
|
0.237
|
6.68
|
107.26
|
8.09
|
|
|
|
|
|
|
|
|
|
|
SURDH#9
|
178.5
|
187.5
|
6.8
|
0.068
|
2.2
|
0.097
|
2.33
|
75.97
|
3.33
|
|
|
|
|
|
|
|
|
|
|
SURDH#10
|
268
|
276.5
|
6.1
|
0.133
|
1.4
|
0.152
|
4.55
|
48.75
|
5.19
|
Includes
|
|
|
2.0
|
|
|
|
|
|
10.2
|
Au Equivalent Grade based on USD
1200 Au and USD 15.80 Ag per
respective ounce.
The from to is the downhole length
followed by the estimate of true width
Mill Upgrade Status
A second ball mill was commissioned at the US Grant onsite
Processing plant in December. This will enable a throughput
increase from 40 to 150 tons per day, which will accommodate an
increase in future mining rates at US Grant and will provide the
capacity to treat higher tonnage from the US Grant as trial mining
and exploration development continues until a future mine
production decision.
Executive Chairman Bernie
Sostak commented,
"Key elements of exploration & infill drilling at US
Grant, assays received to date, and our Mill upgrade to 150 gross
tpd are progressing well. The exploration drill results have
increased our confidence in our plans for future mine development
activities."
Chris Pfahl is the Qualified
Person pursuant to National Instrument 43-101 responsible for
having reviewed and approved, the technical information contained
in this news release. Chris is the Principal and Owner of Silver
Valley Engineering
About Transatlantic Mining Corp.
Transatlantic Mining (TSX-V: TCO) is an emerging
precious and base metal explorer, developer and producer. The
Company has a focus on high-grade mining, in safe and prolific
mining jurisdictions. The Company is engaged in controlling and
owning mineral properties interests, such as an 80% earn-in option
on the Monitor Copper-Gold project in Idaho (USA).
In January 2016, the Company
entered a lease/purchase option agreement on 100% of the US
Grant Gold-Silver Mine &
Mill complex in Montana
(USA). A proven management team, led by Executive Chairman
Bernie Sostak seek to enhance shareholder value
through expert exploration/development and expansion of existing
assets, together with selective acquisitions.
Neither the TSX Venture Exchange nor its
Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for
the adequacy or accuracy of this release
(1) "The Mineral Resource and Preliminary
Economic Assessment at the US Grant Mine Property, Virginia City, Madison County, USA"
SOURCE Transatlantic Mining Corp.