VANCOUVER, BC, June 26,
2024 /CNW/ - Orla Mining Ltd. (TSX: OLA)
(NYSE: ORLA) ("Orla" or the "Company") is pleased to provide an
update on its exploration activities at Camino Rojo Sulphide
Extension from the first half of 2024.
Highlight results:
- 4.57 g/t Au, 19.4 g/t Ag, 2.56% Zn, (6.16 g/t AuEq)
over 15m, incl. 51.1 g/t Au, 8.08% Zn
over 0.8m
- 6.72 g/t Au, 7.7 g/t Ag, 0.79% Zn (7.24 g/t AuEq) over
6.6m, incl. 78.6 g/t Au, 8.24% Zn
over 0.5m
- 3.49 g/t Au, 7.60 g/t Ag, 1.06% Zn (4.12 AuEq) over
9.8m, incl. 16.6 g/t Au, 5.63% Zn
over 1.5m
- 86% gold recovery rate via bottle roll tests
2024 Camino Rojo Extension Exploration Results (Mexico):
This press release provides results from 19 drill holes and
13,500 metres drilled as part of the 30,000-metre Camino Rojo
Extension drill program planned for 2024. To date, 13 significant
mineralized drill intersections outside the current resource have
been identified, with a grade-by-thickness factor exceeding 30 g/t
AuEq per metre (g/t*m). The estimated true width of these
intersections ranges from 5.7 to 21.4 metres. Narrower intervals,
ranging from 0.4 to 1.6 metres, returned higher gold grades of 10.0
g/t to 78.6 g/t, and zinc values from 1.0% to 18.8%, often as part
of wider zones of polymetallic mineralization ranging from a few
metres to several tens of metres in core length.
Metallurgical Testing:
Cyanide bottle roll test work on the recent Extension drill
holes showed an 86% gold recovery rate, rougher flotation yielded
84% gold recovery, and open-circuit zinc cleaner tests produced a
concentrate grading 51.3% zinc and a 94% zinc recovery rate. These
positive metallurgical results are consistent with the results of
last year's gold recoveries of 81%-96% for bottle roll and 85%-88%
for rougher flotation, highlighting the potential compatibility of
this new mineralization style with both standard cyanide processing
and flotation methods.
Future Exploration Plans:
The drill results indicate potential expansion of the Camino
Rojo Sulphide resource at depth, extending beyond the current
mineral resource down plunge by 500 metres and down dip by 300
metres. This high-grade polymetallic (Au-Ag-Zn) semi-massive to
massive replacement style mineralization remains open at depth. The
remainder of the current exploration program will focus on
extending mineralization from 0.5 to 1 kilometre down-plunge of the
current limit of mineral resources along the dike structures. This
drilling is expected to test open mineralized trends and historical
high-grade intersections to assess the broader potential of the
growing Camino Rojo deposit.
"The 2024 Camino Rojo Extension drill program has yielded
exciting results, including multiple significant mineralized
intersections outside the current resource and excellent
metallurgical testing outcomes. Our team is thrilled about
continuing to expand mineralization along the dike structure and
unlocking the Camino Rojo deposit's full growth potential. Stay
tuned for more updates as we continue to push the boundaries of
exploration and discovery!"
-
Sylvain Guerard, Orla's Senior Vice
President, Exploration
Drill hole detailed highlights:
HOLE-ID
|
From
(m)
|
Core
Length (m)
|
Au
g/t
|
Ag
g/t
|
Zn
%
|
Pb
%
|
Cu
%
|
AuEq
g/t
|
CRSX24-25E
|
744.0
|
15.0
|
2.40
|
9.23
|
0.44
|
0.04
|
0.02
|
2.77
|
incl.
|
750.0
|
3.00
|
6.19
|
16.7
|
0.11
|
0.07
|
0.03
|
6.50
|
incl.
And
incl.
And
incl.
|
757.5
769.5
769.5
924.0
925.0
|
1.50
9.75
1.50
13.5
1.00
|
5.14
3.49
16.6
2.38
13.1
|
27.7
7.63
31.5
11.9
10.9
|
1.25
1.06
5.63
0.76
0.17
|
0.07
0.02
0.04
0.01
<0.005
|
0.06
0.02
0.07
0.09
0.11
|
6.18
4.12
19.8
3.01
13.4
|
CRSX24-25F
incl.
And
incl.
And
|
1005.2
1008.2
1133.7
1135.0
1151.7
|
23.4
7.50
7.25
1.35
0.85
|
1.86
3.78
3.67
8.24
45.4
|
15.2
37.1
4.23
11.7
54.9
|
0.02
0.04
6.93
10.8
0.89
|
<0.005
<0.005
0.01
0.02
0.90
|
0.28
0.70
0.05
0.10
0.08
|
2.42
5.16
7.19
13.8
46.9
|
CRSX24-25G
incl.
|
1015.2
1027.3
|
17.2
0.50
|
3.25
13.3
|
8.55
57.2
|
0.09
0.20
|
<0.005
<0.005
|
0.16
1.24
|
3.61
15.7
|
CRSX24-31B
|
925.8
|
15.0
|
4.57
|
19.4
|
2.56
|
0.04
|
0.08
|
6.16
|
incl.
|
934.1
|
0.75
|
51.1
|
44.3
|
8.08
|
0.04
|
0.16
|
55.8
|
incl.
|
940.0
|
0.70
|
10.6
|
35.5
|
8.28
|
0.12
|
0.10
|
15.3
|
CRSX24-34A
|
775.6
|
12.4
|
3.15
|
5.04
|
0.19
|
0.01
|
0.02
|
3.34
|
incl.
|
785.9
|
0.60
|
50.0
|
3.10
|
0.06
|
0.01
|
0.01
|
50.1
|
CRSX24-37A
|
845.9
|
6.60
|
6.72
|
7.71
|
0.79
|
<0.005
|
0.03
|
7.24
|
incl.
|
850.6
|
0.45
|
78.6
|
51.0
|
8.24
|
0.03
|
0.10
|
83.4
|
Metal prices used in
gold equivalent calculation: Au = $1,750/oz, Ag = $21 / oz, Zn =
$1.20/lb, Pb = $0.90/lb, Cu = $3.50/lb. See "Gold Equivalent
Calculation" below for additional information. All prices in
USD. All composites are in the Camino Rojo
Extension.
|
Significance of Au, Ag, Zn and now Cu results
These first results from the 2024 exploration program
demonstrate significant potential for additional gold, silver, and
zinc mineralization associated with polymetallic replacement style
mineralization beneath the Caracol-hosted sulphide deposit, the
main host rock of the current mineral resources. Recent
intersections highlight an increase in copper mineralization,
extending from approximately 250 to 500 metres down-plunge from the
existing resource limit, and remaining open down plunge, adding a
new component to the emerging down-plunge extension potential.
Notable copper intersections include 0.7% Cu over 7.5 metres (hole
CRSX24-25F), 1.24% Cu over 0.5 metres (hole CRSX24-25G), and 2.74%
Cu over 1.1 metres (hole CRSX24-36B).
The increased copper grades are associated with skarn-type
mineralization and alteration, as well as sulphide replacement
mineralization. The occurrence of elevated copper values further
supports the interpreted main feeder structures of the mineralized
system and provides a down-plunge vector for further drilling
during the remainder of the ongoing program.
The geometry of polymetallic replacement style mineralization
consists of shallow-dipping, bedding-parallel, and steep-dipping,
dike-parallel domains. This mineralization extends at least 500
metres down-plunge from the existing resource and 50 to 250 metres
laterally from the dike structures and other secondary interpreted
feeder structures.
All mineralized interval lengths reported are down-hole
intervals, with true width estimates ranging from 60-98% of the
reported interval for all composites >5 grade-by-thickness
factor (Au g/t*m). See Table 1 in the Appendix of this news release
for estimated true widths of individual composites. A standard
sampling length of 1.5 metre is used with a minimum of 0.5 metre
when required based on geologic contacts. Drill core is mainly HQ
diameter, with reduction to NQ where necessary due to drilling
depth. The reported composites were not subject high to "capping".
Orla believes that applying a top cut would have a negligible
effect on overall grades. Composites for the sulphide drilling were
calculated using 1.0 g/t Au cut-off grade and maximum 6 metres
consecutive waste.
Metal prices used in
gold equivalent calculation: Au = $1,750/oz, Ag = $21 / oz, Zn =
$1.20/lb, Pb = $0.90/lb, Cu = $3.50/lb. See "Gold Equivalent
Calculation" below for additional information. All prices in
USD. All composites are in the Camino Rojo
Extension.
|
Qualified Persons Statement
The scientific and technical information in this news release
has been reviewed and approved by Mr. Sylvain Guerard, P Geo., SVP Exploration of the
Company, who is the Qualified Person as defined under the
definitions of National Instrument 43-101 ("NI 43-101").
To verify the information related to the 2024 drilling programs
at the Camino Rojo property, Mr. Guerard has visited the property
in the past year; discussed logging, sampling, and sample shipping
processes with responsible site staff; discussed and reviewed assay
and QA/QC results with responsible personnel; and reviewed
supporting documentation, including drill hole location and
orientation and significant assay interval calculations.
Quality Assurance / Quality Control –2024 Drill
Program
All gold results at Camino Rojo were obtained by ALS Minerals
(Au-AA23) using fire assay fusion and an atomic absorption
spectroscopy finish. All samples are also analyzed for
multi-elements, including silver, copper, lead and zinc using a
four-acid digestion with ICP-AES finish (ME-ICP61) method at ALS
Laboratories in Canada. If samples
were returned with gold values in excess of 10 ppm or base metal
values in excess of 1% by ICP analysis, samples are re-run with
gold (Au-GRA21) by fire assay and gravimetric finish or base metal
by (OG62) four acid overlimit methods. Drill program design,
Quality Assurance/Quality Control and interpretation of results
were performed by qualified persons employing a Quality
Assurance/Quality Control program consistent with NI 43-101 and
industry best practices. Standards were inserted at a frequency of
one in every 50 samples, and blanks were inserted at a frequency of
one in every 50 samples for Quality Assurance/Quality Control
purposes by the Company as well as the lab. ALS Minerals and ALS
Laboratories are independent of Orla. There are no known drilling,
sampling, recovery, or other factors that could materially affect
the accuracy or reliability of the drilling data at Camino
Rojo.
For additional information on the Company's previously reported
drill results, see the Company's press releases dated February 4, 2021 (Orla Mining Provides
Exploration Update), September 12,
2022 (Orla Mining Advances Exploration & Growth
Pipeline), January 31, 2023
(Orla Mining Continues to Intersect Wide, Higher-Grade Sulphide
Zones and Expose Deeper Potential at Camino Rojo, Mexico) and February 7, 2024 (Orla Mining Concludes 2023
Camino Rojo Sulphides Infill Program with Strong Results).
Historical drill results at Camino Rojo were completed by Goldcorp.
Inc. ("Goldcorp"), a prior owner of the project. The Company's
independent qualified person, Independent Mining Consultants, Inc.
was of the opinion that the drilling and sampling procedures for
Camino Rojo drill samples by Goldcorp (and prior to its acquisition
by Goldcorp, Canplats Resources Corporation) were reasonable and
adequate for the purposes of the Camino Rojo Report, and that the
Goldcorp QA/QC program met or exceeded industry standards. See the
Camino Rojo Report for additional information.
Gold Equivalent Calculations
The following metal prices in USD were used for the gold metal
equivalent calculations: $1,750/oz
gold, $21/oz silver, $0.90/lb lead, $1.20/lb zinc, and $3.50/lb copper. Metal recoveries on the Sulphide
Extension, based on the total recovery for the sulphide portion of
the existing resource estimate, were 86% for gold, 76% for silver,
60% for lead, and 64% for zinc, and based on a preliminary study of
similar carbonate replacement deposits were assumed to be 85% for
copper. Metal recoveries on the Camino Rojo Extension, based on a
preliminary metallurgical study, were 88% for gold and 92% for
zinc, and based on a preliminary study of similar carbonate
replacement deposits were assumed to be 85% for silver, 85% for
lead and 85% for copper.
The following equations were used to calculate gold
equivalence:
- Camino Rojo Sulphide AuEq = Au (g/t) + [ Ag (g/t) * 0.0106] + [
Pb (%) * 0.2460 ] + [ Zn (%) * 0.3499 ] + [ Cu (%) * 1.3555 ]
- Camino Rojo Extension AuEq = Au (g/t) + [ Ag (g/t) * 0.0116] +
[ Pb (%) * 0.3406 ] + [ Zn (%) * 0.4916 ] + [ Cu (%) * 1.3247
]
Analyzed metal equivalent calculations are reported for
illustrative purposes only. The metal chosen for reporting on an
equivalent basis is the one that contributes the most dollar value
after accounting for the recoveries used above.
About Orla Mining Ltd.
Orla's corporate strategy is to acquire, develop, and operate
mineral properties where the Company's expertise can substantially
increase stakeholder value. The Company has two material gold
projects: (1) Camino Rojo, located in Zacatecas State, Mexico and (2) South Railroad, located in
Nevada, United States. Orla is operating the Camino
Rojo Oxide Gold Mine, a gold and silver open-pit and heap leach
mine. The property is 100% owned by Orla and covers over 139,000
hectares which contains a large oxide and sulphide mineral
resource. Orla is also developing the South Railroad Project,
a feasibility-stage, open pit, heap leach gold project located on
the Carlin trend in Nevada. The technical reports for the
Company's material projects are available on Orla's website at
www.orlamining.com, and on SEDAR+ and EDGAR under the Company's
profile at www.sedarplus.ca and www.sec.gov, respectively.
Forward-looking Statements
This news release contains certain "forward-looking
information" and "forward-looking statements" within the meaning of
Canadian securities legislation and within the meaning of Section
27A of the United States Securities Act of 1933, as amended,
Section 21E of the United States Exchange Act of 1934, as amended,
the United States Private Securities Litigation Reform Act of 1995,
or in releases made by the United States Securities and Exchange
Commission, all as may be amended from time to time, including,
without limitation, statements regarding: the potential
mineralization at Camino Rojo based on the 2024 drill program,
including the potential for additional gold, silver and zinc
mineralization, and other statements regarding the remainder of the
Company's 2024 drill program, including the expected benefits and
results thereof. Forward-looking statements are statements that are
not historical facts which address events, results, outcomes or
developments that the Company expects to occur. Forward-looking
statements are based on the beliefs, estimates and opinions of the
Company's management on the date the statements are made and they
involve a number of risks and uncertainties. Certain material
assumptions regarding such forward-looking statements were made,
including without limitation, assumptions regarding: the future
price of gold and silver; anticipated costs and the Company's
ability to fund its programs; the Company's ability to carry on
exploration, development, and mining activities; tonnage of ore to
be mined and processed; ore grades and recoveries; decommissioning
and reclamation estimates; currency exchange rates remaining as
estimated; prices for energy inputs, labour, materials, supplies
and services remaining as estimated; the Company's ability to
secure and to meet obligations under property agreements, including
the layback agreement with Fresnillo plc; that all conditions of the
Company's credit facility will be met; the timing and results of
drilling programs; mineral reserve and mineral resource estimates
and the assumptions on which they are based; the discovery of
mineral resources and mineral reserves on the Company's mineral
properties; the obtaining of a subsequent agreement with
Fresnillo to access the sulphide
mineral resource at the Camino Rojo Project and develop the entire
Camino Rojo Project mineral resources estimate; that political and
legal developments will be consistent with current expectations;
the timely receipt of required approvals and permits, including
those approvals and permits required for successful project
permitting, construction, and operation of projects; the timing of
cash flows; the costs of operating and exploration expenditures;
the Company's ability to operate in a safe, efficient, and
effective manner; the Company's ability to obtain financing as and
when required and on reasonable terms; the impact of coronavirus
("COVID-19") on the Company's operations; that the Company's
activities will be in accordance with the Company's public
statements and stated goals; and that there will be no material
adverse change or disruptions affecting the Company or its
properties. Consequently, there can be no assurances that such
statements will prove to be accurate and actual results and future
events could differ materially from those anticipated in such
statements. Forward-looking statements involve significant known
and unknown risks and uncertainties, which could cause actual
results to differ materially from those anticipated. These risks
include, but are not limited to: uncertainty and variations in the
estimation of mineral resources and mineral reserves; the Company's
dependence on the Camino Rojo oxide mine; risks related to the
Company's indebtedness; risks related to exploration, development,
and operation activities; foreign country and political risks,
including risks relating to foreign operations; risks related to
the Cerro Quema Project; delays in obtaining or failure to obtain
governmental permits, or non-compliance with permits; environmental
and other regulatory requirements; delays in or failures to enter
into a subsequent agreement with Fresnillo with respect to accessing certain
additional portions of the mineral resource at the Camino Rojo
Project and to obtain the necessary regulatory approvals related
thereto; the mineral resource estimations for the Camino Rojo
Project being only estimates and relying on certain assumptions;
loss of, delays in, or failure to get access from surface rights
owners; uncertainties related to title to mineral properties; water
rights; risks related to natural disasters, terrorist acts, health
crises, and other disruptions and dislocations, including the
COVID-19 pandemic; financing risks and access to additional
capital; risks related to guidance estimates and uncertainties
inherent in the preparation of feasibility studies; uncertainty in
estimates of production, capital, and operating costs and potential
production and cost overruns; the fluctuating price of gold and
silver; unknown labilities in connection with acquisitions; global
financial conditions; uninsured risks; climate change risks;
competition from other companies and individuals; conflicts of
interest; risks related to compliance with anti-corruption laws;
volatility in the market price of the Company's securities;
assessments by taxation authorities in multiple jurisdictions;
foreign currency fluctuations; the Company's limited operating
history; litigation risks; the Company's ability to identify,
complete, and successfully integrate acquisitions; intervention by
non-governmental organizations; outside contractor risks; risks
related to historical data; the Company not having paid a dividend;
risks related to the Company's foreign subsidiaries; risks related
to the Company's accounting policies and internal controls; the
Company's ability to satisfy the requirements of Sarbanes-Oxley Act
of 2002; enforcement of civil liabilities; the Company's status as
a passive foreign investment company for U.S. federal income tax
purposes; information and cyber security; the Company's significant
shareholders; gold industry concentration; shareholder activism;
other risks associated with executing the Company's objectives and
strategies; as well as those risk factors discussed in the
Company's most recently filed management's discussion and analysis,
as well as its annual information form dated March 19, 2024, which are available on
www.sedarplus.ca and www.sec.gov. Except as required by the
securities disclosure laws and regulations applicable to the
Company, the Company undertakes no obligation to update these
forward-looking statements if management's beliefs, estimates or
opinions, or other factors, should change.
Cautionary Note to U.S. Readers
This news release has been prepared in accordance with
Canadian standards for the reporting of mineral resource and
mineral reserve estimates, which differ from the previous and
current standards of the United
States securities laws. In particular, and without limiting
the generality of the foregoing, the terms "mineral reserve",
"proven mineral reserve", "probable mineral reserve", "inferred
mineral resources,", "indicated mineral resources," "measured
mineral resources" and "mineral resources" used or referenced
herein and the documents incorporated by reference herein, as
applicable, are Canadian mineral disclosure terms as defined in
accordance with Canadian National Instrument 43-101 — Standards of
Disclosure for Mineral Projects ("NI 43-101") and the Canadian
Institute of Mining, Metallurgy and Petroleum (the "CIM") — CIM
Definition Standards on Mineral Resources and Mineral Reserves,
adopted by the CIM Council, as amended (the "CIM Definition
Standards"). For United States
reporting purposes, the United States Securities and Exchange
Commission (the "SEC") has adopted amendments to its disclosure
rules (the "SEC Modernization Rules") to modernize the mining
property disclosure requirements for issuers whose securities are
registered with the SEC under the Exchange Act, which became
effective February 25, 2019. The SEC
Modernization Rules more closely align the SEC's disclosure
requirements and policies for mining properties with current
industry and global regulatory practices and standards, including
NI 43-101, and replace the historical property disclosure
requirements for mining registrants that were included in SEC
Industry Guide 7. Issuers were required to comply with the SEC
Modernization Rules in their first fiscal year beginning on or
after January 1, 2021. As a foreign
private issuer that is eligible to file reports with the SEC
pursuant to the multi-jurisdictional disclosure system, the
Corporation is not required to provide disclosure on its mineral
properties under the SEC Modernization Rules and will continue to
provide disclosure under NI 43-101 and the CIM Definition
Standards. Accordingly, mineral reserve and mineral resource
information contained or incorporated by reference herein may not
be comparable to similar information disclosed by United States companies subject to
the United States federal
securities laws and the rules and regulations
thereunder. As a result of the adoption of the SEC
Modernization Rules, the SEC now recognizes estimates of "measured
mineral resources", "indicated mineral resources" and "inferred
mineral resources." In addition, the SEC has amended its
definitions of "proven mineral reserves" and "probable mineral
reserves" to be "substantially similar" to the corresponding CIM
Definition Standards that are required under NI 43-101. While the
SEC will now recognize "measured mineral resources", "indicated
mineral resources" and "inferred mineral resources", U.S. investors
should not assume that all or any part of the mineralization in
these categories will be converted into a higher category of
mineral resources or into mineral reserves without further work and
analysis. Mineralization described using these terms has a greater
amount of uncertainty as to its existence and feasibility than
mineralization that has been characterized as reserves.
Accordingly, U.S. investors are cautioned not to assume that all or
any measured mineral resources, indicated mineral resources, or
inferred mineral resources that the Company reports are or will be
economically or legally mineable without further work and analysis.
Further, "inferred mineral resources" have a greater amount of
uncertainty and as to whether they can be mined legally or
economically. Therefore, U.S. investors are also cautioned not to
assume that all or any part of inferred mineral resources will be
upgraded to a higher category without further work and analysis.
Under Canadian securities laws, estimates of "inferred mineral
resources" may not form the basis of feasibility or pre-feasibility
studies, except in rare cases. While the above terms are
"substantially similar" to CIM Definitions, there are differences
in the definitions under the SEC Modernization Rules and the CIM
Definition Standards. Accordingly, there is no assurance any
mineral reserves or mineral resources that the Company may report
as "proven mineral reserves", "probable mineral reserves",
"measured mineral resources", "indicated mineral resources" and
"inferred mineral resources" under NI 43-101 would be the same had
the Company prepared the reserve or resource estimates under the
standards adopted under the SEC Modernization Rules or under the
prior standards of SEC Industry Guide 7.
Appendix: Drill Results
Table 1: Camino Rojo Sulphide Extension Composite Drill
Results (Composites 1g/t Au cog)
HOLE-ID
|
From
(m)
|
To
(m)
|
Core
Length
(m)
|
Est.
True
Width
(m)
|
Au
g/t
|
Ag
g/t
|
Cu
ppm
|
As
ppm
|
Pb
ppm
|
Zn
ppm
|
Mo
ppm
|
AuEq*
|
Au
GXM
|
AuEq
GXM
|
Including
10g/t Au HG
|
Litho
|
Met
Code
|
Resources
Pit
|
Recovery
Fm
|
CRSX23-28
|
524.95
|
526.50
|
1.5
|
1.4
|
1.62
|
5.5
|
45
|
1970
|
150
|
804
|
0.5
|
1.71
|
2.50
|
2.65
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX23-28
|
572.50
|
574.00
|
1.5
|
1.3
|
2.73
|
16.1
|
64
|
5440
|
1635
|
2600
|
1.0
|
3.04
|
4.10
|
4.56
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX23-28
|
581.50
|
587.90
|
6.4
|
5.6
|
2.86
|
15.2
|
92
|
5791
|
941
|
2962
|
1.2
|
3.16
|
18.30
|
20.23
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX23-28
|
594.00
|
595.50
|
1.5
|
1.3
|
1.29
|
2.8
|
38
|
3130
|
168
|
202
|
1.0
|
1.34
|
1.94
|
2.00
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX23-28
|
597.00
|
616.75
|
19.8
|
17.2
|
1.06
|
9.0
|
105
|
1294
|
678
|
2441
|
1.3
|
1.27
|
20.98
|
25.17
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX23-28
|
624.50
|
630.50
|
6.0
|
5.2
|
2.02
|
6.3
|
112
|
1901
|
264
|
955
|
1.5
|
2.14
|
12.12
|
12.86
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX23-28
|
638.00
|
641.70
|
3.7
|
3.2
|
1.22
|
11.7
|
72
|
1933
|
1381
|
1403
|
1.0
|
1.44
|
4.52
|
5.32
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX23-28
|
643.50
|
648.00
|
4.5
|
3.9
|
1.17
|
3.3
|
57
|
890
|
285
|
1420
|
1.0
|
1.27
|
5.25
|
5.70
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX23-28
|
657.00
|
658.50
|
1.5
|
1.3
|
2.40
|
2.9
|
26
|
1220
|
35
|
41
|
1.0
|
2.44
|
3.60
|
3.65
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX23-28
|
666.00
|
670.50
|
4.5
|
3.9
|
3.98
|
4.2
|
40
|
1563
|
115
|
295
|
1.0
|
4.04
|
17.91
|
18.19
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX23-28
|
681.00
|
685.50
|
4.5
|
3.9
|
5.40
|
4.7
|
28
|
3080
|
65
|
109
|
1.0
|
5.46
|
24.29
|
24.56
|
1.5m @
11.03g/t
AuEq
( 10.95g/t Au,
6.3g/t Ag, 0% Cu,
0.01% Pb, 0.02%
Zn)
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX23-28
|
693.00
|
696.00
|
3.0
|
2.6
|
1.18
|
4.9
|
74
|
779
|
315
|
79
|
1.0
|
1.25
|
3.53
|
3.74
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX23-28
|
703.00
|
704.50
|
1.5
|
1.3
|
3.47
|
3.3
|
35
|
3200
|
105
|
155
|
4.0
|
3.52
|
5.21
|
5.28
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX23-28
|
713.50
|
742.90
|
29.4
|
22.6
|
2.30
|
4.3
|
65
|
1043
|
275
|
478
|
1.8
|
2.37
|
67.49
|
69.77
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX23-28
|
749.00
|
750.50
|
1.5
|
1.3
|
3.05
|
41.1
|
192
|
732
|
7830
|
3310
|
1.0
|
3.82
|
4.58
|
5.73
|
|
Caracol
|
SX
|
|
Sulphide
|
CRSX23-28
|
764.00
|
775.00
|
11.0
|
9.5
|
2.15
|
8.5
|
79
|
1740
|
1197
|
2128
|
1.0
|
2.36
|
23.68
|
25.93
|
|
Caracol
|
SX
|
|
Sulphide
|
CRSX23-28
|
787.00
|
805.05
|
18.1
|
14.0
|
1.19
|
3.0
|
45
|
1134
|
208
|
1171
|
1.0
|
1.27
|
21.45
|
22.97
|
|
Caracol
|
SX
|
|
Sulphide
|
CRSX23-28
|
979.40
|
982.70
|
3.3
|
2.8
|
1.99
|
1.9
|
485
|
125
|
17
|
1168
|
11.4
|
2.14
|
6.58
|
7.05
|
|
979.4 - 982.6
Indidura
982.6 - 982.7
Porph Intrusives -
hdb-bi-pl
|
SX
|
|
Extension
|
CRSX23-28
|
1009.15
|
1012.10
|
3.0
|
2.4
|
2.68
|
8.7
|
1261
|
164
|
217
|
1857
|
14.8
|
3.05
|
7.91
|
8.99
|
|
1009.15 -
1010.2
Breccia
1010.2 - 1012.1
Cuesta de Cura
|
SX
|
|
Extension
|
CRSX24-25E
|
594.90
|
600.45
|
5.6
|
4.7
|
1.51
|
6.2
|
63
|
1019
|
722
|
2578
|
1.0
|
1.69
|
8.38
|
9.39
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-25E
|
621.05
|
622.55
|
1.5
|
1.3
|
1.03
|
2.4
|
61
|
1395
|
45
|
1715
|
1.0
|
1.12
|
1.54
|
1.68
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-25E
|
637.55
|
639.05
|
1.5
|
1.3
|
6.74
|
13.4
|
295
|
10400
|
190
|
1400
|
2.0
|
6.98
|
10.11
|
10.46
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-25E
|
663.05
|
669.05
|
6.0
|
5.1
|
1.08
|
0.9
|
51
|
94
|
24
|
53
|
1.0
|
1.10
|
6.49
|
6.60
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-25E
|
678.05
|
679.55
|
1.5
|
1.3
|
4.69
|
6.9
|
68
|
2070
|
124
|
25800
|
1.0
|
5.68
|
7.04
|
8.52
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-25E
|
711.05
|
724.50
|
13.5
|
11.5
|
2.05
|
14.3
|
116
|
1975
|
1861
|
5020
|
1.3
|
2.44
|
27.54
|
32.77
|
|
Caracol
|
SX
|
|
Sulphide
|
CRSX24-25E
|
735.00
|
736.50
|
1.5
|
1.3
|
1.23
|
6.3
|
107
|
1270
|
52
|
53
|
1.0
|
1.31
|
1.84
|
1.96
|
|
Caracol
|
SX
|
|
Sulphide
|
CRSX24-25E
|
744.00
|
759.00
|
15.0
|
12.9
|
2.40
|
9.2
|
190
|
815
|
378
|
4410
|
3.9
|
2.77
|
36.05
|
41.48
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-25E
|
769.50
|
779.25
|
9.8
|
8.3
|
3.49
|
7.6
|
157
|
997
|
160
|
10591
|
8.2
|
4.12
|
33.98
|
40.17
|
1.5m @
19.84g/t
AuEq
( 16.6g/t Au,
31.5g/t Ag, 0.07%
Cu, 0.04% Pb,
5.63% Zn)
|
Indidura
|
SX
|
|
Extension
|
CRSX24-25E
|
809.50
|
815.00
|
5.5
|
4.7
|
1.17
|
7.7
|
278
|
632
|
163
|
2986
|
6.3
|
1.45
|
6.43
|
7.96
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-25E
|
871.00
|
872.50
|
1.5
|
1.3
|
1.59
|
3.5
|
527
|
1375
|
28
|
2160
|
5.0
|
1.80
|
2.38
|
2.70
|
|
FG Intrusives -
hdb-bi-pl
|
SX
|
|
Extension
|
CRSX24-25E
|
881.80
|
883.20
|
1.4
|
1.2
|
1.25
|
7.7
|
227
|
2880
|
219
|
2550
|
11.0
|
1.50
|
1.74
|
2.10
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-25E
|
887.50
|
889.00
|
1.5
|
1.3
|
1.13
|
4.4
|
83
|
403
|
39
|
1655
|
1.0
|
1.27
|
1.70
|
1.91
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-25E
|
890.50
|
892.00
|
1.5
|
1.3
|
1.22
|
6.3
|
202
|
1330
|
50
|
1770
|
1.0
|
1.40
|
1.82
|
2.11
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-25E
|
924.00
|
937.50
|
13.5
|
11.5
|
2.38
|
11.9
|
897
|
1671
|
67
|
7585
|
6.0
|
3.01
|
32.11
|
40.64
|
1m @ 13.41g/t
AuEq
( 13.05g/t Au,
10.9g/t Ag, 0.11%
Cu, <0.005% Pb,
0.17% Zn)
|
924 - 925 FG
Intrusives - hdb-bi-
pl
925 - 937.5
Cuesta de Cura
|
SX
|
|
Extension
|
CRSX24-25E
|
957.55
|
962.00
|
4.5
|
3.8
|
4.01
|
2.0
|
386
|
44
|
17
|
4648
|
7.2
|
4.31
|
17.85
|
19.20
|
0.6m @
17.59g/t
AuEq
( 16.65g/t Au,
3.5g/t Ag, 0.11%
Cu, <0.005% Pb,
1.54% Zn)
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-25E
|
970.60
|
981.00
|
10.4
|
8.8
|
1.27
|
1.6
|
74
|
1403
|
43
|
9881
|
5.0
|
1.78
|
13.16
|
18.53
|
0.6m @
12.88g/t
AuEq
( 10.1g/t Au,
14.4g/t Ag, 0.06%
Cu, 0.01% Pb,
5.16% Zn)
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-25E
|
1006.20
|
1007.70
|
1.5
|
1.3
|
1.84
|
3.8
|
136
|
169
|
44
|
19650
|
2.0
|
2.87
|
2.76
|
4.30
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-25E
|
1042.90
|
1043.40
|
0.5
|
0.4
|
9.49
|
13.1
|
293
|
1195
|
46
|
6700
|
4.0
|
10.01
|
4.75
|
5.01
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-25E
|
1072.15
|
1074.00
|
1.8
|
1.6
|
4.40
|
16.7
|
152
|
1080
|
329
|
10914
|
0.8
|
5.16
|
8.14
|
9.55
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-25E
|
1113.40
|
1115.55
|
2.1
|
1.6
|
12.43
|
8.1
|
371
|
1450
|
72
|
52237
|
0.6
|
15.14
|
26.71
|
32.55
|
0.5m @
25.67g/t
AuEq
( 21.1g/t Au,
18.6g/t Ag, 0.09%
Cu, 0.01% Pb,
8.62% Zn)
0.5m @ 26.26g/t
AuEq
( 21.4g/t Au,
13.1g/t Ag, 0.04%
Cu, 0.02% Pb, 9.46% Zn)
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-25E
|
1142.85
|
1143.85
|
1.0
|
0.8
|
3.03
|
4.3
|
491
|
585
|
60
|
58700
|
0.5
|
6.03
|
3.03
|
6.03
|
|
La Peña
|
SX
|
|
Extension
|
CRSX24-25F
|
649.55
|
651.05
|
1.5
|
1.2
|
1.91
|
2.5
|
95
|
2430
|
48
|
1175
|
1.0
|
1.99
|
2.87
|
2.99
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-25F
|
687.00
|
688.06
|
1.1
|
0.8
|
1.44
|
2.0
|
67
|
4890
|
59
|
65
|
1.0
|
1.47
|
1.53
|
1.56
|
|
Caracol
|
SX
|
|
Sulphide
|
CRSX24-25F
|
703.00
|
713.50
|
10.5
|
8.3
|
1.75
|
8.9
|
73
|
1656
|
1277
|
1537
|
1.9
|
1.94
|
18.35
|
20.34
|
|
Caracol
|
SX
|
|
Sulphide
|
CRSX24-25F
|
747.50
|
749.00
|
1.5
|
1.2
|
9.33
|
18.8
|
331
|
3810
|
205
|
8100
|
1.0
|
10.00
|
14.00
|
15.00
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-25F
|
807.50
|
809.00
|
1.5
|
1.2
|
1.73
|
23.2
|
451
|
3160
|
651
|
13950
|
8.0
|
2.76
|
2.59
|
4.14
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-25F
|
824.50
|
825.45
|
1.0
|
0.8
|
3.56
|
7.5
|
208
|
2440
|
210
|
9140
|
5.0
|
4.13
|
3.38
|
3.92
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-25F
|
875.85
|
876.35
|
0.5
|
0.4
|
8.85
|
41.1
|
215
|
1780
|
3140
|
26100
|
11.0
|
10.74
|
4.43
|
5.37
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-25F
|
925.50
|
928.50
|
3.0
|
2.4
|
3.05
|
1.4
|
56
|
30
|
30
|
554
|
13.5
|
3.10
|
9.15
|
9.30
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-25F
|
1005.15
|
1028.55
|
23.4
|
19.7
|
1.86
|
15.2
|
2821
|
170
|
25
|
242
|
5.6
|
2.42
|
43.41
|
56.57
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-25F
|
1060.05
|
1061.15
|
1.1
|
0.9
|
2.51
|
122.0
|
6010
|
3460
|
272
|
14600
|
3.0
|
5.45
|
2.76
|
5.99
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-25F
|
1107.35
|
1108.50
|
1.2
|
1.0
|
2.53
|
13.1
|
1380
|
5970
|
55
|
15950
|
1.0
|
3.65
|
2.91
|
4.20
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-25F
|
1119.00
|
1120.50
|
1.5
|
1.3
|
1.67
|
0.7
|
27
|
3
|
9
|
11
|
1.0
|
1.68
|
2.50
|
2.52
|
|
La Peña
|
SX
|
|
Extension
|
CRSX24-25F
|
1133.70
|
1140.95
|
7.3
|
5.7
|
3.67
|
4.2
|
489
|
16710
|
54
|
69328
|
0.8
|
7.19
|
26.61
|
52.16
|
|
La Peña
|
SX
|
|
Extension
|
CRSX24-25F
|
1151.65
|
1152.50
|
0.8
|
0.7
|
45.40
|
54.9
|
759
|
444
|
8970
|
8890
|
1.0
|
46.88
|
38.59
|
39.85
|
0.8m @
46.88g/t
AuEq
( 45.4g/t Au,
54.9g/t Ag, 0.08%
Cu, 0.9% Pb,
0.89% Zn)
|
La Peña
|
SX
|
|
Extension
|
CRSX24-25F
|
1180.00
|
1181.50
|
1.5
|
1.2
|
7.86
|
1.8
|
89
|
1140
|
42
|
28100
|
1.0
|
9.28
|
11.79
|
13.91
|
|
La Peña
|
SX
|
|
Extension
|
CRSX24-25G
|
748.50
|
750.00
|
1.5
|
1.2
|
4.40
|
5.8
|
107
|
7070
|
99
|
1095
|
2.0
|
4.54
|
6.60
|
6.81
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-25G
|
784.50
|
786.00
|
1.5
|
1.3
|
2.08
|
27.2
|
100
|
1365
|
4520
|
4730
|
1.0
|
2.80
|
3.12
|
4.19
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-25G
|
808.65
|
810.15
|
1.5
|
1.3
|
2.21
|
12.3
|
164
|
3740
|
728
|
2150
|
7.0
|
2.50
|
3.32
|
3.76
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-25G
|
941.00
|
942.50
|
1.5
|
1.2
|
1.25
|
0.3
|
37
|
8
|
6
|
209
|
10.0
|
1.26
|
1.87
|
1.89
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-25G
|
982.50
|
984.00
|
1.5
|
1.2
|
1.31
|
0.7
|
117
|
5
|
6
|
168
|
1.0
|
1.34
|
1.97
|
2.01
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-25G
|
1015.20
|
1032.40
|
17.2
|
13.3
|
3.25
|
8.6
|
1562
|
263
|
21
|
905
|
5.4
|
3.61
|
55.98
|
62.02
|
0.5m @
15.65g/t
AuEq
( 13.25g/t Au,
57.2g/t Ag, 1.24%
Cu, <0.005% Pb,
0.2% Zn)
|
1015.2 -
1023.35
Cuesta de Cura
1023.35 - 1024.15
FG Intrusives -
hdb-bi-pl
1024.15 - 1032.4
Cuesta de Cura
|
SX
|
|
Extension
|
CRSX24-25G
|
1066.50
|
1068.20
|
1.7
|
1.5
|
1.40
|
39.8
|
9480
|
117
|
19
|
581
|
3.0
|
3.15
|
2.38
|
5.35
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-25G
|
1071.40
|
1090.50
|
19.1
|
14.7
|
1.05
|
34.8
|
7372
|
145
|
16
|
333
|
2.1
|
2.45
|
20.13
|
46.81
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-25G
|
1124.30
|
1127.00
|
2.7
|
2.3
|
5.13
|
7.2
|
535
|
12139
|
43
|
30634
|
1.3
|
6.79
|
13.86
|
18.34
|
0.8m @
21.95g/t
AuEq
( 16.8g/t Au,
12.4g/t Ag, 0.07%
Cu, 0.01% Pb,
9.98% Zn)
|
La Peña
|
SX
|
|
Extension
|
CRSX24-25G
|
1163.00
|
1164.50
|
1.5
|
1.2
|
1.49
|
0.7
|
175
|
186
|
17
|
447
|
23.0
|
1.54
|
2.24
|
2.32
|
|
La Peña
|
SX
|
|
Extension
|
CRSX24-25G
|
1216.85
|
1218.20
|
1.4
|
1.0
|
1.43
|
0.5
|
237
|
92
|
4
|
66
|
7.0
|
1.47
|
1.92
|
1.98
|
|
La Peña
|
SX
|
|
Extension
|
CRSX24-30
|
529.00
|
530.50
|
1.5
|
1.3
|
3.93
|
165.0
|
278
|
10450
|
19250
|
18250
|
1.0
|
6.83
|
5.90
|
10.24
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-30
|
544.00
|
554.50
|
10.5
|
9.2
|
1.01
|
15.3
|
90
|
1011
|
1795
|
3082
|
1.4
|
1.33
|
10.56
|
13.99
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-30
|
557.50
|
559.00
|
1.5
|
1.3
|
1.34
|
11.1
|
61
|
3520
|
702
|
2440
|
1.0
|
1.57
|
2.01
|
2.35
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-30
|
565.00
|
566.50
|
1.5
|
1.3
|
1.19
|
23.4
|
73
|
1850
|
2890
|
1985
|
2.0
|
1.59
|
1.79
|
2.38
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-30
|
575.50
|
578.50
|
3.0
|
2.6
|
1.83
|
25.5
|
76
|
2975
|
2147
|
2710
|
3.0
|
2.26
|
5.49
|
6.77
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-30
|
588.00
|
594.00
|
6.0
|
5.3
|
1.25
|
5.9
|
54
|
1526
|
402
|
1522
|
1.0
|
1.38
|
7.49
|
8.28
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-30
|
602.75
|
606.50
|
3.8
|
3.3
|
3.83
|
12.8
|
68
|
6229
|
983
|
1827
|
0.8
|
4.06
|
14.36
|
15.24
|
0.5m @
15.2g/t
AuEq
( 13.85g/t Au,
72.3g/t Ag, 0.03%
Cu, 0.67% Pb,
1.08% Zn)
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-30
|
617.15
|
618.50
|
1.4
|
1.2
|
2.11
|
35.8
|
161
|
4020
|
3190
|
11500
|
1.0
|
2.99
|
2.85
|
4.04
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-30
|
624.55
|
640.40
|
15.9
|
14.0
|
2.35
|
5.0
|
105
|
1504
|
178
|
940
|
1.0
|
2.46
|
37.27
|
38.92
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-30
|
646.50
|
656.52
|
10.0
|
8.9
|
2.28
|
3.7
|
96
|
749
|
95
|
780
|
1.3
|
2.36
|
22.87
|
23.68
|
1m @ 15.16g/t
AuEq
( 14.95g/t Au,
13.7g/t Ag, 0.03%
Cu, 0.01% Pb,
0.06% Zn)
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-30
|
664.50
|
708.50
|
44.0
|
39.0
|
3.00
|
6.2
|
111
|
1084
|
244
|
558
|
1.8
|
3.11
|
132.19
|
136.88
|
1.3m @
12.65g/t
AuEq
( 12.45g/t Au,
15.2g/t Ag, 0.03%
Cu, 0.01% Pb,
0.01% Zn)
1.5m @ 32.92g/t
AuEq
( 32.4g/t Au,
46g/t Ag, 0.01%Cu,
0.03% Pb, 0.01%
Zn)
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-30
|
722.00
|
728.00
|
6.0
|
4.3
|
3.79
|
5.2
|
72
|
1770
|
153
|
150
|
2.3
|
3.86
|
22.74
|
23.18
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-30
|
738.60
|
804.50
|
65.9
|
47.4
|
2.60
|
8.6
|
114
|
2119
|
628
|
1649
|
1.2
|
2.78
|
171.04
|
182.88
|
0.5m @
14.98g/t
AuEq
( 11.5g/t Au, 163g/t
Ag, 0.15% Cu,
3.06% Pb, 2.25%
Zn)
0.8m @ 15.51g/t
AuEq
( 13.9g/t Au,
77.5g/t Ag, 0.04%
Cu, 1.38% Pb,
1.13% Zn)
|
738.6 -
798.64
Caracol
798.64 - 804.5
Indidura
|
SX
|
Y
|
Sulphide
|
CRSX24-30
|
831.50
|
833.00
|
1.5
|
1.1
|
1.01
|
2.4
|
34
|
631
|
71
|
196
|
3.0
|
1.05
|
1.52
|
1.58
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-30
|
846.50
|
848.00
|
1.5
|
1.3
|
2.04
|
6.8
|
171
|
1700
|
91
|
4160
|
6.0
|
2.35
|
3.06
|
3.52
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-30
|
852.50
|
854.00
|
1.5
|
1.3
|
1.78
|
0.8
|
38
|
268
|
15
|
108
|
1.0
|
1.80
|
2.67
|
2.70
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-30
|
942.00
|
943.50
|
1.5
|
1.3
|
2.60
|
4.3
|
96
|
1085
|
199
|
99
|
1.0
|
2.67
|
3.90
|
4.01
|
|
FG Intrusives -
hdb-bi-pl
|
SX
|
|
Extension
|
CRSX24-30
|
952.50
|
955.50
|
3.0
|
2.7
|
4.84
|
2.3
|
410
|
153
|
33
|
1181
|
20.0
|
4.98
|
14.52
|
14.94
|
|
952.5 - 952.93
FG
Intrusives - hdb-bi-
pl
952.93 - 955.5
Indidura
|
SX
|
|
Extension
|
CRSX24-30B
|
528.00
|
529.50
|
1.5
|
1.4
|
1.05
|
64.7
|
222
|
2650
|
5520
|
1805
|
1.0
|
1.97
|
1.58
|
2.95
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-30B
|
538.50
|
540.00
|
1.5
|
1.4
|
1.23
|
14.4
|
86
|
1845
|
1915
|
3320
|
1.0
|
1.56
|
1.85
|
2.34
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-30B
|
559.50
|
607.50
|
48.0
|
43.3
|
1.37
|
7.1
|
132
|
1458
|
495
|
1165
|
1.6
|
1.52
|
65.73
|
72.73
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-30B
|
616.90
|
618.50
|
1.6
|
1.4
|
3.33
|
13.7
|
172
|
4180
|
1260
|
1560
|
2.0
|
3.58
|
5.33
|
5.73
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-30B
|
627.50
|
681.00
|
53.5
|
37.5
|
2.43
|
7.5
|
157
|
1556
|
344
|
693
|
1.2
|
2.57
|
130.08
|
137.23
|
1.7m @
14.17g/t
AuEq
( 13.95g/t Au,
13.1g/t Ag, 0.06%
Cu, 0.02% Pb,
0.02% Zn)
|
Caracol
|
627.5 - 647.4
SX
647.4 - 655.85
655.85 - 681 SX
|
Y
|
Sulphide
|
CRSX24-30B
|
688.00
|
710.50
|
22.5
|
15.8
|
1.04
|
10.2
|
90
|
1105
|
1701
|
2437
|
1.7
|
1.29
|
23.42
|
28.99
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-30B
|
724.00
|
825.50
|
101.5
|
72.0
|
3.05
|
7.2
|
116
|
2459
|
341
|
1713
|
2.5
|
3.21
|
309.54
|
325.80
|
1.3m @
19.48g/t
AuEq
( 19.35g/t Au,
10g/t Ag, 0.01% Cu,
0.01% Pb, 0.01%
Zn)
0.9m @ 12.26g/t
AuEq
( 11.2g/t Au,
85.8g/t Ag, 0.03%
Cu, 0.21% Pb,
0.16% Zn)
1.4m @ 31.55g/t
AuEq
( 30.8g/t Au,
56.3g/t Ag, 0.08%
Cu, 0.09% Pb,
0.07% Zn)
1.5m @ 11.69g/t
AuEq
( 11.45g/t Au,
19.3g/t Ag, 0.01%
Cu, 0.02% Pb,
0.04% Zn)
|
724 - 780.45
Caracol
780.45 - 783.15
Breccia
783.15 - 808.4
Caracol
808.4 - 825.5
Indidura
|
SX
|
Y
|
724 - 818.5
Sulphide
818.5 - 825.5 Extension
|
CRSX24-30B
|
835.50
|
862.00
|
26.5
|
19.0
|
1.65
|
4.5
|
94
|
1611
|
76
|
2150
|
2.9
|
1.82
|
43.72
|
48.30
|
1.1m @
11.53g/t
AuEq
( 11.35g/t Au,
4.2g/t Ag, 0.01%
Cu, <0.005% Pb,
0.24% Zn)
|
Indidura
|
SX
|
Y
|
Extension
|
CRSX24-30B
|
916.02
|
919.65
|
3.6
|
3.2
|
3.54
|
88.1
|
644
|
7162
|
1011
|
43106
|
7.1
|
6.80
|
12.83
|
24.67
|
|
916.02 -
919.2
Breccia
919.2 - 919.65 FG
Intrusives -
hdb-bi-pl
|
SX
|
|
Extension
|
CRSX24-30B
|
928.75
|
935.75
|
7.0
|
6.2
|
1.98
|
4.0
|
199
|
416
|
46
|
3592
|
3.2
|
2.23
|
13.86
|
15.61
|
|
928.75 -
931.82
FG Intrusives -
hdb-bi-pl
931.82 - 932.74
Indidura
932.74 - 934.7 FG
Intrusives - hdb-bi-
pl
934.7 - 935.75
Indidura
|
SX
|
|
Extension
|
CRSX24-31A
|
568.85
|
573.70
|
4.9
|
3.8
|
2.42
|
6.0
|
127
|
1643
|
598
|
2706
|
1.0
|
2.61
|
11.73
|
12.66
|
|
Caracol
|
568.85 - 573
SX
573 - 573.7 NR
|
Y
|
Sulphide
|
CRSX24-31A
|
598.70
|
607.00
|
8.3
|
6.2
|
2.53
|
7.6
|
130
|
3745
|
556
|
3303
|
7.7
|
2.76
|
21.04
|
22.93
|
1.1m @
13.94g/t
AuEq
( 13.05g/t Au, 32g/t
Ag, 0.04% Cu,
0.05% Pb, 1.4%
Zn)
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-31A
|
627.00
|
632.50
|
5.5
|
4.1
|
1.12
|
2.1
|
79
|
2348
|
86
|
223
|
1.3
|
1.16
|
6.16
|
6.39
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-31A
|
648.50
|
650.00
|
1.5
|
1.3
|
1.93
|
2.2
|
68
|
1495
|
98
|
463
|
3.0
|
1.98
|
2.90
|
2.97
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-31A
|
655.50
|
657.00
|
1.5
|
1.1
|
2.56
|
1.6
|
77
|
2090
|
61
|
207
|
4.0
|
2.60
|
3.84
|
3.89
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-31A
|
661.10
|
662.80
|
1.7
|
1.3
|
1.31
|
6.6
|
216
|
205
|
283
|
4090
|
2.0
|
1.56
|
2.23
|
2.65
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-31A
|
700.70
|
702.60
|
1.9
|
1.7
|
4.62
|
20.6
|
520
|
4617
|
566
|
24226
|
2.4
|
5.77
|
8.79
|
10.97
|
|
Indidura
|
SX
|
Y
|
Sulphide
|
CRSX24-31A
|
714.50
|
716.00
|
1.5
|
1.3
|
12.55
|
19.1
|
209
|
15550
|
502
|
10850
|
1.0
|
13.35
|
18.83
|
20.02
|
1.5m @
13.35g/t
AuEq
( 12.55g/t Au,
19.1g/t Ag, 0.02%
Cu, 0.05% Pb,
1.08% Zn)
|
Indidura
|
SX
|
Y
|
Extension
|
CRSX24-31A
|
729.90
|
730.45
|
0.6
|
0.5
|
7.29
|
38.7
|
830
|
152
|
2350
|
87100
|
3.0
|
12.21
|
4.01
|
6.72
|
|
Indidura
|
SX
|
Y
|
Extension
|
CRSX24-31A
|
746.00
|
747.50
|
1.5
|
1.3
|
4.27
|
32.1
|
587
|
2885
|
250
|
4819
|
0.8
|
4.97
|
6.41
|
7.45
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-31A
|
754.50
|
764.50
|
10.0
|
8.7
|
1.53
|
7.5
|
176
|
1490
|
101
|
3450
|
5.5
|
1.81
|
15.29
|
18.12
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-31A
|
814.10
|
819.40
|
5.3
|
4.0
|
1.88
|
6.2
|
231
|
607
|
70
|
8547
|
11.2
|
2.40
|
9.96
|
12.74
|
0.5m @ 19.26g/t
AuEq
( 15.1g/t Au,
45.2g/t Ag, 0.1%
Cu, 0.05% Pb,
7.08% Zn)
|
Indidura
|
SX
|
|
Extension
|
CRSX24-31A
|
832.63
|
835.10
|
2.5
|
1.9
|
1.43
|
7.6
|
529
|
114
|
110
|
28132
|
27.9
|
2.98
|
3.54
|
7.36
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-31A
|
847.70
|
853.20
|
5.5
|
4.2
|
1.15
|
6.7
|
494
|
813
|
65
|
4540
|
20.1
|
1.52
|
6.33
|
8.36
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-31A
|
877.80
|
878.65
|
0.9
|
0.6
|
22.70
|
60.3
|
811
|
1900
|
785
|
1370
|
7.0
|
23.60
|
19.30
|
20.06
|
0.9m @
23.6g/t
AuEq
( 22.7g/t Au,
60.3g/t Ag, 0.08%
Cu, 0.08% Pb,
0.14% Zn)
|
Porph Intrusives -
hdb-bi-pl
|
SX
|
|
Extension
|
CRSX24-31A
|
887.50
|
889.00
|
1.5
|
1.3
|
3.56
|
2.8
|
206
|
263
|
37
|
525
|
3.0
|
3.65
|
5.34
|
5.47
|
|
Porph Intrusives -
hdb-bi-pl
|
SX
|
|
Extension
|
CRSX24-31A
|
899.00
|
908.60
|
9.6
|
7.3
|
1.57
|
3.9
|
236
|
822
|
48
|
2282
|
3.1
|
1.76
|
15.12
|
16.94
|
|
899 - 899.6
Breccia
899.6 - 908.6
Cuesta de Cura
|
SX
|
|
Extension
|
CRSX24-31A
|
920.80
|
921.50
|
0.7
|
0.5
|
3.14
|
23.4
|
506
|
6740
|
530
|
28900
|
6.0
|
4.92
|
2.20
|
3.44
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-31A
|
927.70
|
928.20
|
0.5
|
0.4
|
7.82
|
7.1
|
203
|
12150
|
148
|
18250
|
10.0
|
8.83
|
3.91
|
4.42
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-31A
|
953.40
|
962.50
|
9.1
|
7.0
|
1.82
|
2.4
|
146
|
67
|
14
|
548
|
2.6
|
1.89
|
16.53
|
17.21
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-31A
|
1059.40
|
1063.35
|
3.9
|
3.4
|
1.02
|
6.3
|
456
|
2346
|
71
|
47424
|
3.2
|
3.49
|
4.03
|
13.78
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-31B
|
546.50
|
551.00
|
4.5
|
3.4
|
3.23
|
11.7
|
96
|
3870
|
523
|
1261
|
1.4
|
3.42
|
14.51
|
15.39
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-31B
|
602.00
|
612.50
|
10.5
|
8.6
|
8.41
|
15.6
|
172
|
8932
|
1527
|
3136
|
1.7
|
8.75
|
88.31
|
91.84
|
0.6m @
106.16g/t
AuEq
( 105g/t Au, 103g/t
Ag, 0.02%
Cu, 0.11% Pb, 0.05%
Zn)
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-31B
|
632.00
|
642.50
|
10.5
|
8.4
|
1.03
|
1.9
|
64
|
1545
|
60
|
410
|
2.7
|
1.08
|
10.85
|
11.31
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-31B
|
644.00
|
645.50
|
1.5
|
1.2
|
1.14
|
0.9
|
72
|
367
|
21
|
492
|
1.0
|
1.17
|
1.70
|
1.76
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-31B
|
657.50
|
659.00
|
1.5
|
1.2
|
3.12
|
4.5
|
110
|
780
|
78
|
1945
|
2.0
|
3.25
|
4.68
|
4.88
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-31B
|
668.00
|
669.50
|
1.5
|
1.2
|
1.14
|
3.7
|
140
|
2470
|
132
|
1710
|
1.0
|
1.26
|
1.71
|
1.89
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-31B
|
735.50
|
737.00
|
1.5
|
1.2
|
1.78
|
8.6
|
230
|
238
|
169
|
8960
|
1.0
|
2.36
|
2.67
|
3.53
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-31B
|
746.00
|
747.50
|
1.5
|
1.2
|
1.74
|
3.8
|
221
|
956
|
58
|
1525
|
1.0
|
1.89
|
2.60
|
2.83
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-31B
|
759.70
|
760.20
|
0.5
|
0.4
|
3.17
|
40.8
|
823
|
16400
|
6130
|
37400
|
1.0
|
5.80
|
1.59
|
2.90
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-31B
|
774.45
|
775.50
|
1.0
|
0.9
|
5.24
|
32.7
|
1500
|
4230
|
394
|
30700
|
7.0
|
7.34
|
5.50
|
7.71
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-31B
|
818.95
|
824.00
|
5.0
|
4.1
|
1.87
|
9.9
|
773
|
1381
|
42
|
4977
|
5.4
|
2.33
|
9.45
|
11.79
|
0.5m @
16.64g/t
AuEq
( 13.7g/t Au,
70.6g/t Ag, 0.57% Cu,
0.01% Pb,
2.77% Zn)
|
Indidura
|
TRSX
|
|
Extension
|
CRSX24-31B
|
881.50
|
885.20
|
3.7
|
3.0
|
1.11
|
2.5
|
122
|
1197
|
26
|
990
|
5.5
|
1.20
|
4.10
|
4.45
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-31B
|
901.40
|
903.00
|
1.6
|
1.3
|
1.10
|
1.2
|
136
|
61
|
7
|
205
|
4.0
|
1.14
|
1.76
|
1.83
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-31B
|
925.75
|
940.70
|
15.0
|
12.2
|
4.57
|
19.4
|
761
|
3863
|
402
|
25604
|
6.1
|
6.16
|
68.25
|
92.14
|
0.8m @
55.8g/t
AuEq
( 51.1g/t Au,
44.3g/t Ag, 0.16%
Cu, 0.04% Pb,
8.08% Zn)
0.7m @ 15.26g/t
AuEq
( 10.6g/t Au,
35.5g/t Ag, 0.1%
Cu, 0.12% Pb,
8.28% Zn)
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-31B
|
960.75
|
961.30
|
0.5
|
0.4
|
2.92
|
17.3
|
755
|
4170
|
255
|
8160
|
1.0
|
3.63
|
1.61
|
2.00
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-31B
|
1043.00
|
1044.50
|
1.5
|
1.2
|
8.62
|
61.1
|
267
|
290
|
9
|
28200
|
3.0
|
10.75
|
12.93
|
16.13
|
|
Cuesta de
Cura
|
|
|
Extension
|
CRSX24-31B
|
1092.05
|
1097.50
|
5.5
|
4.3
|
3.10
|
2.8
|
174
|
614
|
27
|
15019
|
0.5
|
3.89
|
16.88
|
21.21
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-31C
|
552.50
|
557.95
|
5.5
|
4.1
|
3.90
|
16.1
|
95
|
3652
|
1420
|
1386
|
2.2
|
4.17
|
21.28
|
22.74
|
|
Caracol
|
TRSX
|
Y
|
Sulphide
|
CRSX24-31C
|
607.80
|
626.00
|
18.2
|
14.3
|
2.16
|
7.0
|
95
|
3761
|
430
|
1290
|
1.4
|
2.31
|
39.38
|
41.97
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-31C
|
641.00
|
642.50
|
1.5
|
1.2
|
1.18
|
1.0
|
66
|
634
|
30
|
604
|
1.0
|
1.22
|
1.76
|
1.82
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-31C
|
650.00
|
663.50
|
13.5
|
11.5
|
2.09
|
3.6
|
74
|
974
|
532
|
1122
|
1.9
|
2.19
|
28.23
|
29.58
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-31C
|
672.50
|
674.00
|
1.5
|
1.2
|
1.10
|
3.4
|
71
|
5020
|
314
|
1505
|
1.0
|
1.20
|
1.64
|
1.80
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-31C
|
694.50
|
696.00
|
1.5
|
1.2
|
7.26
|
8.0
|
249
|
3800
|
103
|
1905
|
1.0
|
7.48
|
10.89
|
11.22
|
|
Indidura
|
SX
|
Y
|
Extension
|
CRSX24-31C
|
710.00
|
711.50
|
1.5
|
1.2
|
2.51
|
59.2
|
384
|
1615
|
12650
|
26400
|
4.0
|
4.98
|
3.77
|
7.46
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-31C
|
742.00
|
748.00
|
6.0
|
4.7
|
1.99
|
2.8
|
145
|
887
|
64
|
1251
|
2.3
|
2.11
|
11.96
|
12.65
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-31C
|
793.70
|
797.50
|
3.8
|
2.9
|
1.71
|
2.6
|
120
|
887
|
117
|
1964
|
9.9
|
1.85
|
6.49
|
7.04
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-31C
|
834.00
|
839.10
|
5.1
|
4.4
|
2.72
|
7.9
|
431
|
1272
|
100
|
29494
|
14.1
|
4.32
|
13.88
|
22.05
|
|
834 - 836.1
Indidura
836.1 - 839.1
Cuesta de Cura
|
834 - 836.1
TRSX
836.1 - 839.1
SX
|
|
Extension
|
CRSX24-31C
|
868.50
|
876.25
|
7.8
|
5.8
|
2.34
|
3.1
|
138
|
1325
|
31
|
2166
|
5.9
|
2.50
|
18.10
|
19.35
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-31C
|
926.00
|
927.50
|
1.5
|
1.2
|
1.10
|
0.6
|
71
|
11
|
3
|
1620
|
2.0
|
1.20
|
1.65
|
1.79
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-31C
|
964.50
|
966.00
|
1.5
|
1.2
|
1.14
|
3.7
|
847
|
70
|
11
|
869
|
7.0
|
1.34
|
1.71
|
2.01
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-31C
|
979.50
|
981.00
|
1.5
|
1.1
|
1.59
|
3.3
|
201
|
3010
|
34
|
20400
|
1.0
|
2.66
|
2.39
|
3.99
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-31C
|
984.00
|
985.50
|
1.5
|
1.1
|
1.26
|
1.1
|
81
|
269
|
13
|
11200
|
1.0
|
1.83
|
1.88
|
2.74
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-31C
|
1074.55
|
1076.00
|
1.5
|
1.1
|
7.29
|
19.0
|
936
|
23663
|
432
|
132466
|
1.0
|
14.16
|
10.56
|
20.53
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-32
|
390.00
|
391.50
|
1.5
|
1.0
|
1.61
|
10.2
|
85
|
1445
|
2640
|
1075
|
2.0
|
1.83
|
2.42
|
2.75
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-32
|
401.00
|
444.00
|
43.0
|
27.3
|
2.14
|
8.7
|
106
|
2368
|
1308
|
3968
|
1.3
|
2.42
|
92.12
|
104.06
|
1.5m @
16.97g/t
AuEq
( 15.65g/t Au,
49.4g/t Ag, 0.03%
Cu, 1.12% Pb,
1.38% Zn)
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-32A
|
538.30
|
542.50
|
4.2
|
3.2
|
1.62
|
13.5
|
126
|
1494
|
168
|
6749
|
3.3
|
2.02
|
6.79
|
8.47
|
|
Caracol
|
538.3 - 539.1
TRSX
539.1 - 542.5
SX
|
Y
|
Sulphide
|
CRSX24-32A
|
742.00
|
743.50
|
1.5
|
1.0
|
8.30
|
0.8
|
45
|
83
|
40
|
1310
|
1.0
|
8.38
|
12.45
|
12.57
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-32B
|
444.00
|
481.00
|
37.0
|
23.9
|
1.06
|
6.6
|
81
|
1241
|
872
|
3502
|
2.2
|
1.28
|
39.21
|
47.53
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-32B
|
517.30
|
519.00
|
1.7
|
1.3
|
1.77
|
20.3
|
142
|
895
|
271
|
1460
|
1.0
|
2.06
|
3.01
|
3.51
|
|
Caracol
|
TRSX
|
Y
|
Sulphide
|
CRSX24-32B
|
540.15
|
544.50
|
4.4
|
3.5
|
3.18
|
14.1
|
175
|
2130
|
452
|
11521
|
3.0
|
3.77
|
13.85
|
16.41
|
|
540.15 - 542
Breccia
542 - 544.5
Caracol
|
540.15 - 542
TROH
542 - 544.5
TRSX
|
Y
|
Sulphide
|
CRSX24-32B
|
648.05
|
649.50
|
1.5
|
1.2
|
1.23
|
1.8
|
64
|
173
|
59
|
911
|
1.0
|
1.29
|
1.78
|
1.87
|
|
Caracol
|
SX
|
|
Sulphide
|
CRSX24-32B
|
729.35
|
734.80
|
5.4
|
4.4
|
1.10
|
13.8
|
178
|
859
|
199
|
3350
|
2.2
|
1.46
|
6.01
|
7.94
|
|
729.35 - 730.6
FG
Intrusives - hdb-bi-
pl
730.6 - 734.8
Indidura
|
729.35 -
729.4
SX
729.4 - 734.8
TRSX
|
|
Extension
|
CRSX24-32D
|
504.60
|
509.40
|
4.8
|
3.4
|
1.09
|
8.8
|
98
|
527
|
669
|
2687
|
2.5
|
1.31
|
5.24
|
6.28
|
|
Caracol
|
TROH
|
Y
|
Sulphide
|
CRSX24-32D
|
511.00
|
518.50
|
7.5
|
5.3
|
1.01
|
6.6
|
110
|
378
|
171
|
1237
|
1.3
|
1.14
|
7.56
|
8.55
|
|
Caracol
|
TRSX
|
Y
|
Sulphide
|
CRSX24-32D
|
549.20
|
549.80
|
0.6
|
0.4
|
14.45
|
125.0
|
385
|
1605
|
2130
|
8180
|
8.0
|
16.17
|
8.67
|
9.70
|
0.6m @
16.17g/t
AuEq
( 14.45g/t Au,
125g/t Ag, 0.04%
Cu, 0.21% Pb,
0.82% Zn)
|
Caracol
|
TRSX
|
Y
|
Sulphide
|
CRSX24-32D
|
569.00
|
570.30
|
1.3
|
0.9
|
1.26
|
2.3
|
139
|
108
|
36
|
1305
|
2.0
|
1.35
|
1.64
|
1.75
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-32D
|
763.30
|
768.50
|
5.2
|
3.1
|
1.31
|
12.0
|
475
|
1108
|
541
|
9009
|
18.7
|
1.97
|
6.82
|
10.26
|
|
Indidura
|
763.3 - 767.3
SX
767.3 - 768.5
TRSX
|
|
Extension
|
CRSX24-32D
|
861.60
|
862.95
|
1.4
|
0.8
|
1.29
|
9.3
|
705
|
250
|
85
|
2830
|
7.0
|
1.63
|
1.73
|
2.20
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-32D
|
986.70
|
987.20
|
0.5
|
0.3
|
6.03
|
10.6
|
466
|
6940
|
101
|
54100
|
7.0
|
8.88
|
3.02
|
4.44
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-34
|
457.20
|
459.30
|
2.1
|
1.7
|
1.21
|
14.8
|
83
|
1799
|
1855
|
4939
|
1.1
|
1.60
|
2.54
|
3.36
|
|
Caracol
|
457.22 - 459.3
OX
|
Y
|
Sulphide
|
CRSX24-34A
|
539.30
|
552.00
|
12.7
|
10.8
|
2.73
|
20.1
|
296
|
719
|
798
|
5098
|
3.4
|
3.18
|
34.70
|
40.42
|
1.2m @
12.62g/t
AuEq
( 11.85g/t Au,
36.9g/t Ag, 0.03%
Cu, 0.09% Pb,
0.9% Zn)
|
Caracol
|
539.3 - 545.5
TROH
545.5 - 552 TROL
|
Y
|
Sulphide
|
CRSX24-34A
|
562.50
|
573.50
|
11.0
|
8.4
|
1.26
|
4.4
|
118
|
601
|
98
|
3618
|
1.3
|
1.45
|
13.88
|
15.99
|
|
Caracol
|
TRSX
|
Y
|
Sulphide
|
CRSX24-34A
|
581.00
|
591.50
|
10.5
|
9.0
|
2.46
|
6.9
|
110
|
848
|
75
|
1909
|
1.3
|
2.62
|
25.86
|
27.50
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-34A
|
600.00
|
619.00
|
19.0
|
16.1
|
1.15
|
4.9
|
150
|
754
|
103
|
1520
|
2.6
|
1.28
|
21.82
|
24.25
|
|
600 - 601.1
Caracol
601.1 - 619
Breccia
|
600 - 601.1
SX
601.1 - 619 OX
|
Y
|
Sulphide
|
CRSX24-34A
|
643.00
|
646.00
|
3.0
|
2.6
|
1.14
|
6.7
|
245
|
378
|
71
|
897
|
1.5
|
1.27
|
3.41
|
3.82
|
|
Caracol
|
TROL
|
Y
|
Sulphide
|
CRSX24-34A
|
669.03
|
670.23
|
1.2
|
1.0
|
1.75
|
9.0
|
203
|
380
|
101
|
3170
|
2.0
|
1.98
|
2.09
|
2.38
|
|
Caracol
|
TROL
|
Y
|
Sulphide
|
CRSX24-34A
|
698.68
|
701.38
|
2.7
|
2.1
|
6.40
|
47.5
|
1572
|
767
|
438
|
29285
|
2.3
|
8.23
|
17.29
|
22.21
|
1.2m @
14.02g/t
AuEq
( 12.9g/t Au,
40.4g/t Ag, 0.14%
Cu, 0.03% Pb,
0.92% Zn)
|
698.68 - 699
Caracol
699 - 701.38
Indidura
|
698.68 -
698.9
TRSX
698.9 - 701.38
TROH
|
Y
|
698.68 - 700.22
Sulphide
700.22 - 701.38 Extension
|
CRSX24-34A
|
720.25
|
723.50
|
3.3
|
2.8
|
2.70
|
3.5
|
243
|
184
|
28
|
910
|
3.5
|
2.81
|
8.76
|
9.15
|
|
Indidura
|
TROH
|
Y
|
Extension
|
CRSX24-34A
|
775.60
|
788.02
|
12.4
|
10.6
|
3.15
|
5.0
|
234
|
924
|
141
|
1950
|
1.3
|
3.34
|
39.07
|
41.43
|
0.6m @
50.08g/t
AuEq
( 50g/t Au, 3.1g/t
Ag, 0.01% Cu,
0.01% Pb, 0.06%
Zn)
|
775.6 -
776.25
Indidura
776.25 - 788.02 FG
Intrusives - hdb-bi-pl
|
775.6 -
776.25
TROH
776.25 -
787.84 SX
787.84 -
788.02 TRSX
|
Y
|
Extension
|
CRSX24-34A
|
794.20
|
797.00
|
2.8
|
2.4
|
2.07
|
41.8
|
432
|
585
|
2290
|
4221
|
7.3
|
2.89
|
5.79
|
8.11
|
|
FG Intrusives -
hdb-bi-pl
|
SX
|
|
Extension
|
CRSX24-34A
|
854.90
|
856.50
|
1.6
|
1.4
|
1.09
|
5.4
|
260
|
1070
|
136
|
13400
|
16.0
|
1.85
|
1.74
|
2.96
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-34A
|
865.70
|
868.30
|
2.6
|
1.9
|
1.25
|
36.1
|
1006
|
6230
|
401
|
39246
|
21.5
|
3.75
|
3.25
|
9.74
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-34B
|
483.50
|
485.00
|
1.5
|
1.2
|
2.09
|
2.6
|
82
|
2580
|
319
|
1515
|
2.0
|
2.19
|
3.14
|
3.28
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-34B
|
496.90
|
498.50
|
1.6
|
1.3
|
1.76
|
18.9
|
177
|
493
|
2160
|
2310
|
1.0
|
2.12
|
2.82
|
3.39
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-34B
|
516.00
|
518.00
|
2.0
|
1.6
|
1.09
|
2.0
|
49
|
851
|
310
|
917
|
2.0
|
1.16
|
2.18
|
2.31
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-34B
|
527.50
|
532.00
|
4.5
|
3.7
|
1.25
|
4.6
|
99
|
2221
|
693
|
1449
|
0.8
|
1.38
|
5.63
|
6.21
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-34B
|
543.80
|
552.50
|
8.7
|
7.0
|
4.99
|
21.3
|
338
|
1077
|
411
|
3840
|
5.0
|
5.41
|
43.41
|
47.03
|
1.4m @
23.65g/t
AuEq
( 22.6g/t Au,
70.2g/t Ag, 0.05%
Cu, 0.12% Pb,
0.6% Zn)
|
Caracol
|
543.8 - 544.3
SX
544.3 - 552.5
TROH
|
Y
|
Sulphide
|
CRSX24-34B
|
559.00
|
560.85
|
1.9
|
1.5
|
6.52
|
12.1
|
205
|
518
|
399
|
2680
|
4.0
|
6.78
|
12.06
|
12.54
|
|
Caracol
|
TROH
|
Y
|
Sulphide
|
CRSX24-34B
|
567.75
|
569.50
|
1.8
|
1.4
|
1.14
|
2.9
|
136
|
1280
|
60
|
1350
|
1.0
|
1.23
|
1.99
|
2.16
|
|
Caracol
|
TROL
|
Y
|
Sulphide
|
CRSX24-34B
|
577.00
|
593.10
|
16.1
|
13.1
|
1.35
|
4.4
|
193
|
294
|
67
|
3284
|
4.3
|
1.54
|
21.70
|
24.75
|
|
Caracol
|
TROL
|
Y
|
Sulphide
|
CRSX24-34B
|
604.50
|
606.00
|
1.5
|
1.2
|
1.60
|
1.1
|
57
|
134
|
32
|
331
|
1.0
|
1.63
|
2.40
|
2.45
|
|
Caracol
|
TROL
|
Y
|
Sulphide
|
CRSX24-34B
|
614.50
|
619.00
|
4.5
|
3.6
|
1.80
|
6.7
|
177
|
545
|
82
|
2090
|
2.3
|
1.97
|
8.10
|
8.87
|
|
Caracol
|
TRSX
|
Y
|
Sulphide
|
CRSX24-34B
|
630.50
|
640.50
|
10.0
|
8.1
|
1.01
|
2.6
|
128
|
194
|
40
|
870
|
1.6
|
1.09
|
10.14
|
10.91
|
|
Caracol
|
TRSX
|
Y
|
Sulphide
|
CRSX24-34B
|
664.00
|
665.65
|
1.6
|
1.3
|
2.11
|
11.9
|
302
|
223
|
82
|
2720
|
3.0
|
2.37
|
3.48
|
3.92
|
|
Caracol
|
664 - 665.6
TRSX
665.6 - 665.65
TROH
|
Y
|
Sulphide
|
CRSX24-34B
|
691.30
|
691.80
|
0.5
|
0.4
|
4.33
|
84.7
|
2550
|
886
|
470
|
20900
|
1.0
|
6.69
|
2.17
|
3.35
|
|
Indidura
|
TRSX
|
Y
|
Extension
|
CRSX24-34B
|
705.60
|
706.60
|
1.0
|
0.8
|
2.64
|
43.6
|
1845
|
394
|
554
|
53000
|
1.0
|
6.01
|
2.64
|
6.01
|
|
Indidura
|
TROL
|
Y
|
Extension
|
CRSX24-34B
|
716.25
|
722.00
|
5.8
|
4.7
|
1.91
|
7.8
|
211
|
146
|
83
|
2001
|
2.8
|
2.13
|
10.99
|
12.24
|
0.5m @
12.63g/t
AuEq
( 12.05g/t Au,
34.8g/t Ag, 0.05%
Cu, 0.04% Pb,
0.19% Zn)
|
Indidura
|
SX
|
Y
|
Extension
|
CRSX24-34B
|
733.80
|
737.00
|
3.2
|
2.6
|
1.10
|
7.0
|
166
|
138
|
157
|
1794
|
5.2
|
1.29
|
3.51
|
4.13
|
|
Indidura
|
TRSX
|
Y
|
Extension
|
CRSX24-34B
|
748.20
|
773.00
|
24.8
|
20.3
|
1.66
|
10.4
|
460
|
600
|
247
|
12724
|
3.6
|
2.47
|
41.09
|
61.33
|
|
Indidura
|
748.2 - 751.3
TROL
751.3 - 757.3
SX
757.3 - 771.9
TRSX
771.9 - 773
SX
|
Y
|
Extension
|
CRSX24-34B
|
791.00
|
793.00
|
2.0
|
1.9
|
2.40
|
2.8
|
122
|
81
|
40
|
1407
|
7.5
|
2.52
|
4.80
|
5.04
|
|
Indidura
|
SX
|
Y
|
Extension
|
CRSX24-34B
|
802.50
|
809.80
|
7.3
|
5.9
|
1.30
|
6.7
|
329
|
159
|
52
|
3925
|
4.2
|
1.62
|
9.49
|
11.80
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-34B
|
815.00
|
816.50
|
1.5
|
1.2
|
1.09
|
3.0
|
266
|
17
|
15
|
952
|
13.0
|
1.21
|
1.64
|
1.81
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-34B
|
819.60
|
821.00
|
1.4
|
1.1
|
1.82
|
2.4
|
85
|
373
|
27
|
2560
|
9.0
|
1.99
|
2.55
|
2.78
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-34B
|
843.00
|
847.95
|
5.0
|
4.1
|
2.20
|
31.9
|
996
|
2620
|
1670
|
24800
|
25.0
|
3.98
|
10.89
|
19.69
|
|
843 - 846
No Recovery
846 - 847.95
Indidura
|
843 - 846 NR
846 - 847.95 SX
|
|
Extension
|
CRSX24-34B
|
881.20
|
882.50
|
1.3
|
1.1
|
10.80
|
8.3
|
159
|
2450
|
206
|
12300
|
15.0
|
11.53
|
14.04
|
14.99
|
1.3m @
11.53g/t
AuEq
( 10.8g/t Au,
8.3g/t Ag, 0.02%
Cu, 0.02% Pb, 1.23%
Zn)
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-34B
|
900.50
|
901.55
|
1.0
|
0.9
|
2.60
|
1.6
|
189
|
240
|
16
|
87
|
15.0
|
2.65
|
2.73
|
2.78
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-34B
|
960.30
|
960.80
|
0.5
|
0.4
|
3.32
|
18.4
|
495
|
2940
|
158
|
20200
|
7.0
|
4.60
|
1.66
|
2.30
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-34B
|
1022.45
|
1022.95
|
0.5
|
0.4
|
3.58
|
16.0
|
556
|
3590
|
98
|
78700
|
5.0
|
7.71
|
1.79
|
3.86
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-36B
|
1092.70
|
1093.25
|
0.5
|
0.5
|
3.29
|
47.8
|
596
|
11250
|
4390
|
86400
|
9.0
|
8.32
|
1.81
|
4.58
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-36B
|
1130.48
|
1131.90
|
1.4
|
1.3
|
1.10
|
11.4
|
2350
|
58
|
14
|
16100
|
0.5
|
2.34
|
1.56
|
3.32
|
|
Cuesta de
Cura
|
|
|
Extension
|
CRSX24-36B
|
1160.00
|
1183.50
|
23.5
|
21.4
|
1.12
|
34.2
|
5874
|
160
|
189
|
1541
|
5.5
|
2.37
|
26.24
|
55.77
|
|
1160 - 1176.4
Cuesta de Cura
1176.4 - 1176.95
FG Intrusives -
hdb-bi-pl
1176.95 - 1183.5
Cuesta de Cura
|
1160 - 1180.1
SX
1180.5 - 1183.5 SX
|
|
Extension
|
CRSX24-36B
|
1245.10
|
1245.80
|
0.7
|
0.6
|
3.17
|
13.0
|
462
|
5110
|
176
|
28100
|
1.0
|
4.77
|
2.22
|
3.34
|
|
La Peña
|
SX
|
|
Extension
|
CRSX24-37A
|
627.50
|
684.00
|
56.5
|
48.6
|
2.90
|
6.7
|
147
|
2511
|
342
|
3962
|
1.5
|
3.14
|
163.79
|
177.24
|
2m @ 16.55g/t
AuEq
( 15.18g/t Au,
36.1g/t Ag, 0.05%
Cu, 0.26% Pb,
2.47% Zn)
1.5m @ 29.52g/t
AuEq
( 28.9g/t Au,
40.7g/t Ag, 0.02%
Cu, 0.04%Pb,
0.45% Zn)
|
627.5 - 661.8
Caracol
661.8 - 665
Breccia
665 - 667.4
Caracol
667.4 - 681.05
Breccia
681.05 - 684
Indidura
|
627.5 - 668.1
SX
668.1 - 681.05
TROH
681.05 - 684
SX
|
Y
|
Sulphide
|
CRSX24-37A
|
698.50
|
700.00
|
1.5
|
1.3
|
1.02
|
17.3
|
129
|
1145
|
3630
|
3780
|
1.0
|
1.54
|
1.52
|
2.31
|
|
Indidura
|
SX
|
Y
|
Extension
|
CRSX24-37A
|
733.00
|
734.50
|
1.5
|
1.3
|
1.02
|
6.1
|
170
|
758
|
694
|
4520
|
9.0
|
1.35
|
1.52
|
2.03
|
|
Indidura
|
SX
|
Y
|
Extension
|
CRSX24-37A
|
758.50
|
759.70
|
1.2
|
1.0
|
1.88
|
2.9
|
40
|
441
|
49
|
934
|
2.0
|
1.97
|
2.26
|
2.36
|
|
Indidura
|
|
|
Extension
|
CRSX24-37A
|
774.50
|
776.00
|
1.5
|
1.3
|
1.63
|
5.5
|
258
|
2270
|
90
|
12000
|
3.0
|
2.32
|
2.45
|
3.48
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-37A
|
837.00
|
838.50
|
1.5
|
1.1
|
1.42
|
1.8
|
256
|
413
|
20
|
8500
|
21.0
|
1.89
|
2.13
|
2.84
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-37A
|
845.90
|
852.50
|
6.6
|
5.0
|
6.72
|
7.7
|
291
|
3379
|
45
|
7881
|
23.5
|
7.24
|
44.36
|
47.77
|
0.5m @
83.39g/t
AuEq
( 78.6g/t Au, 51g/t
Ag, 0.1% Cu,
0.03% Pb, 8.24%
Zn)
|
Indidura
|
SX
|
|
Extension
|
CRSX24-37A
|
873.95
|
876.25
|
2.3
|
1.7
|
1.11
|
14.5
|
568
|
2429
|
97
|
8598
|
9.7
|
1.78
|
2.56
|
4.10
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-37A
|
935.20
|
937.50
|
2.3
|
2.0
|
2.41
|
30.3
|
651
|
999
|
621
|
21118
|
5.7
|
3.91
|
5.54
|
8.98
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-37A
|
958.70
|
960.00
|
1.3
|
1.1
|
1.18
|
31.5
|
181
|
2430
|
404
|
944
|
10.0
|
1.62
|
1.53
|
2.11
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-37A
|
997.55
|
999.05
|
1.5
|
1.1
|
2.95
|
6.6
|
736
|
628
|
46
|
40600
|
1.0
|
5.12
|
4.43
|
7.68
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-37A
|
1053.05
|
1053.57
|
0.5
|
0.4
|
3.10
|
7.0
|
818
|
2760
|
30
|
60300
|
0.5
|
6.25
|
1.61
|
3.25
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-37B
|
602.50
|
650.30
|
47.8
|
40.2
|
3.55
|
10.8
|
159
|
2584
|
839
|
5214
|
3.1
|
3.89
|
169.76
|
186.00
|
1.5m @
21.44g/t
AuEq
( 21.2g/t Au,
10.4g/t Ag, 0.01%
Cu, 0.05% Pb,
0.3% Zn)
1.1m @ 15.6g/t
AuEq
( 15.1g/t Au,
22.6g/t Ag, 0.03%
Cu, 0.1% Pb,
0.55% Zn)
1.8m @ 11.03g/t
AuEq
( 10.3g/t Au,
19.6g/t Ag, 0.05%
Cu, 0.05% Pb,
1.27% Zn)
|
602.5 -
607.65
Caracol
607.65 - 611.35
Breccia
611.35 - 650.3
Caracol
|
602.5 -
607.65
TRSX
607.65 - 611.35
OX
611.35 - 619.3
TRSX
619.3 - 650.3
SX
|
Y
|
Sulphide
|
CRSX24-37B
|
661.00
|
670.20
|
9.2
|
7.7
|
1.58
|
4.1
|
91
|
1690
|
95
|
1125
|
1.3
|
1.68
|
14.54
|
15.45
|
|
Caracol
|
SX
|
Y
|
Sulphide
|
CRSX24-37B
|
679.35
|
684.50
|
5.1
|
4.3
|
2.16
|
6.0
|
197
|
401
|
280
|
5561
|
1.1
|
2.54
|
11.14
|
13.09
|
|
Caracol
|
TRSX
|
Y
|
Extension
|
CRSX24-37B
|
694.60
|
698.50
|
3.9
|
3.3
|
5.42
|
23.8
|
448
|
6900
|
926
|
15475
|
4.3
|
6.55
|
21.13
|
25.53
|
1.3m @
17.26g/t
AuEq
( 14.05g/t Au, 67g/t
Ag, 0.12% Cu,
0.25% Pb, 4.46%
Zn)
|
Caracol
|
TRSX
|
Y
|
Extension
|
CRSX24-37B
|
752.50
|
754.00
|
1.5
|
1.3
|
2.07
|
6.8
|
104
|
3870
|
135
|
1595
|
2.0
|
2.25
|
3.11
|
3.37
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-37B
|
840.00
|
841.50
|
1.5
|
1.1
|
2.13
|
3.0
|
190
|
232
|
54
|
5850
|
33.0
|
2.48
|
3.20
|
3.72
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-37B
|
852.40
|
854.00
|
1.6
|
1.2
|
1.13
|
3.0
|
95
|
246
|
44
|
2110
|
17.0
|
1.28
|
1.80
|
2.04
|
|
Indidura
|
SX
|
|
Extension
|
CRSX24-37B
|
876.36
|
876.86
|
0.5
|
0.4
|
4.64
|
9.0
|
1485
|
131
|
31
|
1055
|
8.0
|
4.99
|
2.32
|
2.50
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-37B
|
898.70
|
899.40
|
0.7
|
0.6
|
14.25
|
73.0
|
1370
|
14050
|
1165
|
25200
|
5.0
|
16.56
|
9.97
|
11.59
|
0.7m @
16.56g/t
AuEq
( 14.25g/t Au, 73g/t
Ag, 0.14% Cu,
0.12% Pb, 2.52%
Zn)
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-37B
|
958.00
|
959.50
|
1.5
|
1.3
|
1.99
|
6.5
|
233
|
877
|
42
|
2410
|
30.0
|
2.22
|
2.99
|
3.32
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-37B
|
1118.70
|
1119.25
|
0.5
|
0.5
|
8.55
|
3.0
|
911
|
80
|
25
|
188000
|
0.5
|
17.95
|
4.70
|
9.87
|
|
Cuesta de
Cura
|
SX
|
|
Extension
|
CRSX24-37B
|
1153.60
|
1154.10
|
0.5
|
0.4
|
7.13
|
11.2
|
971
|
19800
|
89
|
177000
|
0.5
|
16.09
|
3.57
|
8.05
|
|
La Peña
|
SX
|
|
Extension
|
Criteria: Cut off
grade 1g/t Au, minimum length 1.5m, maximum consecutive internal
waste 6m, if Au grade x length > 1.5 the composite will be
added
|
Price Assumptions:
Au = 1750usd oz, Ag = 21usd oz, Cu = 3.5usd lb, Pb = 0.9usd lb, Zn
= 1.2usd lb. See "Gold Equivalent Calculations" for additional
information.
|
FR= Fresh Rock, OX=
Oxide, TROL= Transition Oxide Low, TROH= Transition Oxide High, MX=
Mixed, TRSX= Transition Sulphide, SX= Sulphide
|
Table 2: Camino Rojo Sulphide Extension Drill Hole
Collars
HOLE-ID
|
Easting
|
Northing
|
Elevation
|
Azimuth
|
Dip
|
Depth
(m)
|
CRSX23-28
|
243384.3
|
2676158.3
|
1956.5
|
153.8
|
-61.89
|
1050.0
|
CRSX24-25E
|
243501.5
|
2676087.5
|
1954.6
|
127.5
|
-60.00
|
1200.4
|
CRSX24-25F
|
243501.5
|
2676087.5
|
1954.6
|
140.0
|
-72.00
|
1250.1
|
CRSX24-25G
|
243501.5
|
2676087.5
|
1954.6
|
140.0
|
-72.00
|
1224.1
|
CRSX24-30
|
243402.7
|
2676157.9
|
1956.4
|
146.5
|
-63.60
|
1030.7
|
CRSX24-30B
|
243402.7
|
2676157.9
|
1956.4
|
149.6
|
-56.75
|
1000.3
|
CRSX24-31A
|
243665.5
|
2676153.9
|
1953.4
|
148.4
|
-63.04
|
1080.0
|
CRSX24-31B
|
243665.5
|
2676153.9
|
1953.4
|
134.4
|
-65.10
|
1100.7
|
CRSX24-31C
|
243665.5
|
2676153.9
|
1953.4
|
147.6
|
-71.54
|
1181.5
|
CRSX24-32
|
244056.7
|
2676258.6
|
1948.2
|
110.0
|
-79.20
|
444.0
|
CRSX24-32A
|
244056.7
|
2676258.6
|
1948.2
|
102.3
|
-61.80
|
986.3
|
CRSX24-32B
|
244056.7
|
2676258.6
|
1948.2
|
125.2
|
-66.55
|
999.5
|
CRSX24-32D
|
244056.7
|
2676258.6
|
1948.2
|
87.0
|
-56.79
|
1003.0
|
CRSX24-33
|
243550.1
|
2676266.6
|
1955.5
|
180.0
|
-88.60
|
410.5
|
CRSX24-33A
|
243550.1
|
2676266.6
|
1955.5
|
173.1
|
-67.92
|
920.0
|
CRSX24-33C
|
243550.1
|
2676266.6
|
1955.5
|
137.0
|
-63.89
|
895.6
|
CRSX24-33C-1
|
243550.1
|
2676266.6
|
1955.5
|
137.0
|
-63.89
|
661.0
|
CRSX24-34
|
243889.3
|
2676286.6
|
1949.7
|
155.0
|
-72.78
|
459.3
|
CRSX24-34A
|
243889.3
|
2676286.6
|
1949.6
|
139.0
|
-62.00
|
1002.7
|
CRSX24-34B
|
243889.3
|
2676286.6
|
1949.6
|
179.5
|
-67.83
|
1029.5
|
CRSX24-36B
|
243305.3
|
2676111.1
|
1957.9
|
151.7
|
-61.10
|
1306.2
|
CRSX24-37A
|
243682.3
|
2676269.9
|
1953.9
|
145.6
|
-64.12
|
1125.0
|
CRSX24-37B
|
243682.3
|
2676269.9
|
1953.9
|
130.0
|
-63.60
|
1172.0
|
SOURCE Orla Mining Ltd.