Pure Energy Minerals Announces Completion of Acquisition of Clayton NE Claims
06 Dezember 2017 - 1:30PM
Pure Energy Minerals Limited (TSX VENTURE:PE) (OTCQB:PEMIF) (the
“Company” or “Pure Energy”) is pleased to announce the completion
of its previously announced acquisition of 1,450 acres (587
hectares) of unpatented claims in Esmeralda County, Nevada (the
“Clayton NE Claims”). The Clayton NE Claims are contiguous with the
northern portion of the Company’s Clayton Valley Project (“CV
Project”) and to Albemarle Corporation’s Silver Peak Operations,
the only producing lithium brine mine in North America. The
Company’s CV Project now covers approximately 26,050 acres (10,542
hectares). For further details regarding the Clayton NE Claims and
the terms of the acquisition, please refer to the Company’s news
release dated November 8, 2017.
Patrick Highsmith, President and CEO of the
Company, commented, “We are pleased to complete the purchase of
100% interest in the Clayton NE claims. With this acquisition, Pure
Energy now controls all the mineral rights in Clayton Valley
outside of the Silver Peak Mine that are known to host lithium
brine. We look forward to incorporating these new lithium brine
bearing claims into our 2018 work program.”
The Company acquired the Clayton NE Claims from
Advantage Lithium Corp. and Nevada Sunrise Gold Corporation
(together the “Vendors”) in consideration for the issuance of
7,000,000 common shares (the “Consideration Shares”). In addition
to the statutory four-month hold period, the Consideration Shares
are subject to voluntary restrictions on trading for a period of 27
months, with partial quarterly releases commencing after 18 months.
The Vendors have further agreed that for a period of 24 months
following closing, they will vote their respective shares at
meetings of shareholders of Pure Energy in favour of all matters
proposed by Pure Energy’s management.
The Company and each of the Vendors are at arm’s
length. No finder’s fees were paid in connection with the
transaction.
Quality Assurance
Patrick Highsmith, Certified Professional
Geologist (AIPG CPG # 11702), is a qualified person as defined by
NI 43-101, and has supervised the preparation of the scientific and
technical information in this news release. Mr. Highsmith is not
independent of the Company as he is an officer and director.
About Pure Energy Minerals
Limited
Pure Energy Minerals is a lithium resource
developer that is driven to become a low-cost supplier for the
growing lithium battery industry. The Company is developing
the CV Project in Clayton Valley, Nevada. The Company is also
exploring a major new lithium brine project in the Lithium Triangle
of South America, the Terra Cotta Project (“TCP”). The TCP is
located on Pocitos Salar in Salta, Argentina, where it enjoys some
of the best infrastructure and access of any lithium brine
exploration project in Argentina.
Pure Energy has developed core strengths in
innovative development and processing technologies for lithium
brines and lithium mineral deposits. Key attributes and
activities include:
- A large, strategic land position with excellent infrastructure
in a first-class mining jurisdiction: approximately 10,542 hectares
(26,050 acres) in Clayton Valley, Esmeralda County, Nevada, located
a 3-hour drive from the Gigafactory;
- An inferred mineral resource of approximately 247,000 tonnes of
lithium hydroxide (218,000 tonnes of LCE) at the Clayton Valley
Project with an average grade of 123 mg/L lithium;
- The only lithium brine resource in North America to yield a
positive Preliminary Economic Assessment including an estimated
after-tax NPV (8% discount) of US $264 million and an estimated IRR
of 21%;
- Advanced metallurgical testwork demonstrating the improved
efficacy of a new, environmentally responsible lithium processing
technology that produces low-cost battery grade lithium
hydroxide;
- An early stage exploration program on the 13,000-hectare
(32,000 acre) Terra Cotta Project (TCP), located on Pocitos Salar
in Salta Province; and
- An active business development program, applying Company
expertise to the evaluation of new lithium targets around the
world.
On behalf of the Board of Directors, “Patrick Highsmith” Chief
Executive Officer CONTACT:
Pure Energy Minerals Limited (www.pureenergyminerals.com)Email:
info@pureenergyminerals.comTelephone – 604 608 6611, ext 5
Forward-Looking Information
The information in this news release contains
forward looking statements that are subject to a number of known
and unknown risks, uncertainties and other factors that may cause
actual results to differ materially from those anticipated in our
forward looking statements. Factors that could cause such
differences include: changes in world commodity markets, equity
markets, costs and supply of materials relevant to the mining
industry, change in government and changes to regulations affecting
the mining industry. Forward-looking statements in this release may
include, successful development of a new lithium process, and
future exploration on the CV Project. Although we believe the
expectations reflected in our forward looking statements are
reasonable, results may vary, and we cannot guarantee future
results, levels of activity, performance or achievements.
Neither TSX Venture Exchange nor its Regulation
Services Provider (as that term is defined in the policies of TSX
Venture Exchange) accepts responsibility for the adequacy or
accuracy of this release.
Pure Energy Minerals (TSXV:PE)
Historical Stock Chart
Von Nov 2024 bis Dez 2024
Pure Energy Minerals (TSXV:PE)
Historical Stock Chart
Von Dez 2023 bis Dez 2024