Solitario Intersects 125 Feet Grading 2.16 Grams Per Tonne Gold Equivalent on Its Mt. Hamilton Gold Project, Nevada
10 Dezember 2012 - 2:30PM
Business Wire
Solitario Exploration & Royalty Corp. (“Solitario;” NYSE
MKT: XPL; TSX: SLR) and Ely Gold & Minerals (“Ely
Gold;” TSX.V: ELY) are pleased to announce assay results for
25 new drill holes on its recently completed 2012 Mt. Hamilton
drilling program. Eight of the holes were drilled within the
vicinity of the Centennial ore body and 17 holes were drilled in
the Seligman deposit area.
Highlights of this round of drilling results are presented in
the Table below. Results from the last 25 drill holes are appended
to this release. Drill hole location maps for both the Centennial
and Seligman deposits can be accessed at:
www.solitarioxr.com/art/MtHamilton_Seligman_6Dec2012.pdf
Drill Hole (Deposit)
From
To
Interval*
Gold
Silver
Gold Eq.***
(C)=Centennial;
(S)=Seligman
(feet)
(feet)
(feet)/(m)
(gpt)
(gpt)
(g/tn)
MH-12-07 (C) 340
460 120 /
36.6 1.46
11.44 1.67
MH-12-10 (C) 425
550 125 /
38.1 1.82
18.54 2.16
MH-12-18 (C) 575
635 60 /
18.3 1.00
24.25 1.44
MH-12-30 (S)** 4.2
34.4 30.2 /
9.2 1.64
1.35 1.66 MH-12-35
(S)** 259.0
372.2 113.2 / 34.5
0.74
3.2 0.80 MH-12-43 (C)**
589.30
615.0 25.7 / 7.8
0.83
135.03 3.29 MH-12-47
(C)** 574.5
601.0 26.5 / 8.1
3.61
15.54 3.89 MH-12-48 (S)
305
380 75 / 22.9
0.63
19.56 0.99 MH-12-49 (S)
320
385 65 / 19.8
1.12 7.21
1.25 MH-12-51 (S)
265 355
90 / 27.4
0.95 10.77
1.15
* True width is estimated to be approximately 80% of true width
for most intervals** Core hole; all other reported holes in this
chart are reverse circulation drill hole*** Gold Equivalent = gold
grade + (silver grade ÷ 55)
In total, 42 reverse circulation drill holes and 11 core holes
were recently completed totaling 16,615 feet and 3,969 feet of
drilling, respectively. Assay results for the last two Seligman
core holes are expected before year’s end. On September 10, 2012,
Solitario announced its initial NI-43-101 resource estimate for the
Seligman deposit. The 53-hole 2012 drilling campaign was designed
to achieve several objectives. The main focus was to convert
Seligman inferred resources in specific areas to measured and
indicated categories. Other objectives included obtaining sample
material to carry-out metallurgical and geochemical testing and to
measure geotechnical characteristics for mine planning at Seligman.
Several holes were also drilled at the Centennial gold deposit to
convert inferred resources to measured and indicated categories as
well as to test potential extensions of mineralization to the
south. The Centennial deposit was the subject of a Feasibility
Study issued earlier this year
(http://www.solitarioresources.com/news/022712.pdf).
Chris Herald, President and CEO of Solitario commented, “With
the successful completion of our 2012 drilling program, together
with the filing of our Mt. Hamilton Plan of Operations last week,
we will now focus our attention on managing the permitting process,
as well as completing the technical studies required to fully
evaluate Seligman economics.” Trey Wasser, Ely Gold’s President
& CEO, commented, “Solitario continues to complete the
necessary milestones to move the Mt. Hamilton project through
permitting towards construction of this new low-cost gold producer
in Nevada.”
Qualified Person
The drill hole information contained within this release is
reported under a quality control program supervised by Mr. Walt
Hunt, Chief Operating Officer for Solitario, who is a qualified
person as defined by National Instrument 43-101. He has verified
the drill results and other data disclosed in this new release,
including sampling, analytical and test data. Samples are derived
from 50% splits of HQ and NQ (2.5 and 1.9 inch) diameter core.
Samples are then shipped via secured third-party land
transportation and analyzed by American Assay Laboratories, Reno,
Nevada, an ISO9001:2000 registered company. In addition to the
laboratory's quality control program, a check assay program is
ongoing.
Terms of the Mt. Hamilton LLC Joint Venture
Solitario and Ely Gold formed the Mt. Hamilton LLC (“MH-LLC”), a
limited liability company which holds 100% of the Mt. Hamilton
project assets under an Operating Agreement (“MH-Agreement”). Per
the terms of the MH-Agreement, DHI-US, Ely Gold’s wholly owned US
subsidiary, has a 20% interest in the MH-LLC and Solitario has an
80% interest.
About Solitario
Solitario is a gold, silver, platinum-palladium, and base metal
exploration and royalty company actively exploring in Brazil,
Mexico, Peru and Nevada. Solitario has significant business
relationships with Votorantim Metais and Anglo Platinum. Solitario
is traded on the NYSE MKT ("XPL") and on the Toronto Stock Exchange
("SLR"). Additional information about Solitario is available online
at www.solitarioxr.com.
About Ely Gold
Ely Gold is focused on the acquisition and development of gold
resources in North America. Ely Gold is traded on the TSX Venture
Exchange ("ELY"). Additional information about Ely Gold is
available online at www.elygoldandminerals.com.
This press release includes certain "Forward-Looking Statements"
within the meaning of section 21E of the United States Securities
Exchange Act of 1934, as amended. All statements, other than
statements of historical fact, included herein, including without
limitation, statements regarding potential mineralization and
reserves, exploration results and future plans and objectives of
Solitario, are forward-looking statements that involve various
risks and uncertainties. There can be no assurance that such
statements will prove to be accurate and actual results and future
events could differ materially from those anticipated in such
statements. Development of Solitario’s properties are subject to
the success of exploration, completion and implementation of an
economically viable mining plan, obtaining the necessary permits
and approvals from various regulatory authorities, compliance with
operating parameters established by such authorities and political
risks such as higher tax and royalty rates, foreign ownership
controls and our ability to finance in countries that may become
politically unstable. Important factors that could cause actual
results to differ materially from Solitario’s expectations are
disclosed under the heading "Risk Factors" and elsewhere in
Solitario’s documents filed from time to time with Canadian
Securities Commissions and the United States Securities and
Exchange Commission.
Neither TSX Venture Exchange nor its Regulation Services
Provider (as that term is defined in the policies of the TSX
Venture Exchange) accepts responsibility for the adequacy or
accuracy of this release.
2012 Seligman Drilling Results: Phase 2 (latest 25 drill
holes)
Drill Hole (Deposit)
Mineralized Drill
Thickness* Gold Grade
Silver Grade
Gold Equiv.
(C)=Centennial; Interval - feet feet / meters
gr./tonne gr./tonne gr./tonne***
(S)=Seligman
MH-12-01
(C) 510-585
75 / 22.9 0.24
12.32
0.46 MH-12-05 (C)
510-585 75 / 22.9
0.17
10.29 0.36
MH-12-07 (C) 340-460
120 / 36.6
1.46 11.44
1.67
505-590 85 / 25.9
0.34
1.85 0.37
MH-12-10 (C) 425-550
125 / 38.1
1.82 18.54
2.16 MH-12-17 (C)**
20.2-37.1
16.9 / 5.2 0.44
11.69
0.65
77.6-140.9 63.3 / 19.3
0.29
8.84 0.45
159.3-217.4
58.1 / 17.7 0.86
11.30
1.07
254.2-317.2 63.0 / 19.2
0.22
9.77 0.40
MH-12-18 (C) 575-635
60 / 18.3
1.00 24.25
1.44 MH-12-24 (S)**
66.0-85.1
19.1 / 5.8 0.76
1.97
0.80 MH-12-30 (S)**
4.2-34.4 30.2 / 9.2
1.64
1.35 1.66
67.2-83.5
16.3 / 5.0
0.22 15.59
0.50 MH-12-34 (S)**
206.0-246.6
40.6 / 12.4 0.59
3.79 0.66
205-245
40 / 12.2
0.47 12.53
0.70
265-315 50
/ 15.2 0.45
7.50 0.59
MH-12-35 (S)** 259-372.2
113.2 / 34.4
0.74 3.20
0.80
285.4-298.0
12.6 / 3.8 1.38
5.13
1.47
318.5-348.8 30.3 / 9.2
1.40
8.28 1.55 MH-12-36
(S) 370-380
10 / 3.0 0.98
33.45
1.59 MH-12-38 (S)
315-335 20 / 6.1
0.52
0.78 0.53
380-460
80 / 24.4
0.34 2.48
0.39
520-540 20 / 6.1
1.58
11.13 1.78
MH-12-39 (S) 370-390
20 / 6.1
0.26 2.70
0.31 MH-12-41 (S)
340-360 20
/ 6.1 0.48
2.33 0.52
MH-12-42 (S) 355-380
25 / 7.6
1.42 27.2
1.91 MH-12-43 (C)**
589.3-615.0
25.7 / 7.8 0.83
135.0
3.29
713.0-723.0 10.0 / 3.0
0.61
19.6 0.97
MH-12-44 (S) 400-440
40 / 12.2
0.73 10.71
0.92 MH-12-45 (S)
175-195 20
/ 6.1 0.31
5.08 0.40
265-300
35 / 10.7
0.46 4.39
0.54
420-440 20 / 6.1
3.03
1.78 3.06
MH-12-46 (S) 145-165
20 / 6.1
0.38 0.38
0.39
195-220 25 / 7.6
0.25
1.74 0.28
305-335
30 / 9.1
0.66 6.33
0.78 MH-12-47 (C)**
478.3-502.0
23.7 / 7.2 0.19
94.80 1.91
574.5-601.0
26.5 / 8.1
3.61 15.54
3.89
651.0-670.4
19.4 / 5.9 0.09
46.42 0.93
MH-12-48 (S)
305-380 75 / 22.9
0.63 19.56
0.99 MH-12-49 (S)
165-190
25 / 7.6 0.49
3.46
0.55
320-385 65 / 19.8
1.12 7.21
1.25 MH-12-51 (S)
265-355
90 / 27.4 0.95
10.77
1.15 MH-12-52 (S)
285-330 45 / 13.7
1.20
5.82 1.31
395-420
25 / 7.6
0.45 12.48
0.68 MH-12-53 (S)
45-150 105 / 32.0
0.20
5.15 0.29
* True width is estimated to be approximately 80% of drill
thickness for most intervals** Core holes; all other
reported holes in this chart are reverse circulation drill
holes*** Gold Equivalent = gold grade + (silver grade ÷
55)
Solitario Resources (TSX:SLR)
Historical Stock Chart
Von Dez 2024 bis Jan 2025
Solitario Resources (TSX:SLR)
Historical Stock Chart
Von Jan 2024 bis Jan 2025