Gold-Ore Resources Ltd. (the "Company") (TSX VENTURE:GOZ) is pleased to report
drill results from the on-going underground diamond drill program at the
100%-owned Bjorkdal Gold Mine in Sweden. The drilling has been very successful
at expanding the size of the orebody and the deposit remains open to expansion
in all directions. Management is confident that drilling at the mine is
extending mine life by more than adequately replacing mined ounces with new
ounces.


Gold-Ore President, Bob Wasylyshyn, commented, "Recent drilling continues to
expand the orebody and has a significant and positive impact on mine life,
thereby increasing the Net Asset Value of the mine and the Company. This coupled
with more stable gold production through an improved mine plan provides an
exceptional opportunity for growth in the Company."


Reserve, Resource Expansion

The Company recently released a reserve/resource statement (see NR dated
October, 28, 2009) that was based on historic drilling and all drilling
conducted during 2006 to 2008, but excluded all 2009 drilling. During 2009 a
total of 36 core holes (4,700 metres) were drilled from the underground workings
and 91% of the holes have intersected quartz veins with mineable gold grades and
widths. These results have successfully expanded the known reserve/resource at
Bjorkdal.


Exploration Drift

During July an exploration tunnel was started and driven to explore the
extension of the orebody towards the north. This area has been tested by only a
few surface holes with very encouraging results. The tunnel is now 90% complete
and the diamond drill was positioned in it 10 days ago. Two holes have been
completed and both intersected numerous quartz veins, many mineralized with
visible gold.


The current mine plan at Bjorkdal involves mining over 40 gold-bearing quartz
veins across a footprint width of 1,200 metres. Drilling from the exploration
drift is successfully extending that footprint along strike and the tonnage
potential is significant when multiplied across the 40 known veins. The drill
will complete six to ten holes in the tunnel and will then be moved so that the
tunnel can be extended providing further drill access.




Significant Drill Intersections
--------------------------------------------------------------------------
                                            Core
                         From      To   Interval   True Width   Gold Grade
Drill Hole  Section        (m)     (m)        (m)          (m)        (g/t)
--------------------------------------------------------------------------
 2009-016   0 East        8.7    12.6        3.9          3.9         3.86
--------------------------------------------------------------------------
 2009-017   40 West       0.0     2.3        2.3          2.0        14.26
--------------------------------------------------------------------------
                          8.0    10.8        2.8          2.5         3.50
--------------------------------------------------------------------------
                         91.0    94.0        3.0          2.6         4.19
--------------------------------------------------------------------------
                        225.3   227.4        2.1          1.9         4.24
--------------------------------------------------------------------------
 2009-018   80 West      37.8    40.1        2.3          2.0         7.52
--------------------------------------------------------------------------
                        118.0   121.0        3.0          2.7         2.69
--------------------------------------------------------------------------
                        139.0   141.9        2.9          2.6         3.89
--------------------------------------------------------------------------
 2009-019   220 West     28.1    31.1        3.0          2.8         2.86
--------------------------------------------------------------------------
 2009-020   220 West     59.0    62.8        3.8          3.3         3.80
--------------------------------------------------------------------------
            including    59.9    60.8        0.9          0.8        75.50
--------------------------------------------------------------------------
 2009-021   220 West     30.0    34.9        4.9          4.9        12.19
--------------------------------------------------------------------------
 2009-022   180 West     29.6    32.5        2.9          2.6         6.42
--------------------------------------------------------------------------
 2009-023   160 West      3.0     5.0        2.0          2.0         8.31
--------------------------------------------------------------------------
                         13.3    16.0        2.7          2.7         5.80
--------------------------------------------------------------------------
 2009-024   140 West      8.0    11.0        3.0          2.7         3.23
--------------------------------------------------------------------------
 2009-025   140 West     36.0    42.0        6.0          5.8         8.59
--------------------------------------------------------------------------
                         54.9    58.1        3.2          3.1         3.30
--------------------------------------------------------------------------
                         90.0    93.0        3.0          2.9         6.44
--------------------------------------------------------------------------
 2009-026   60 West      90.0    92.1        2.1          2.1         8.46
--------------------------------------------------------------------------
 2009-027   20 West      22.5    24.5        2.0          2.0         9.22
--------------------------------------------------------------------------
                         64.0    66.0        2.0          2.0         9.92
--------------------------------------------------------------------------
 2009-028   20 West                  Hole lost and not sampled
--------------------------------------------------------------------------
 2009-029   20 East                    No significant values
--------------------------------------------------------------------------
 2009-030   40 East                    No significant values
--------------------------------------------------------------------------
 2009-031   45 East       8.2    10.2        2.0          2.0        10.79
--------------------------------------------------------------------------
                         35.4    37.8        2.4          2.4         2.48
--------------------------------------------------------------------------
 2009-032   60 East      37.1    39.8        2.7          2.7         9.52
--------------------------------------------------------------------------



The Company only releases drill intersections deemed to be significant. If a
drill hole cuts mineralization with gold values greater than 2.5 g/t across a
true width of approximately 2.0 metres or more, it is released. This criterion
is based on the mining methods employed at Bjorkdal where mining widths vary
from 2.5 meters to 5.0 metres. The multiple intersections in many of the holes
reflect different veins within the vein swarm.


Sample Protocol and Chain of Custody

In order to minimize the effects of the coarse nugget gold at Bjorkdal, the
Company has elected to submit 100% of the core for analysis, rather than
retaining half of the core for archive. This provides a much larger sample for
gold analysis and theoretically a more representative result. The core is logged
and photographed, and for the zones sampled, the entire core is shipped to ALS
Chemex for gold analysis. A rigorous QA/QC program is employed that involves the
insertion of blanks and certified standards.


About Gold-Ore

Gold-Ore Resources is a gold mining and exploration company focused in Sweden.
The Company is generating positive cash flow, is debt-free and unhedged, and
remains focused on increasing gold production from the 100%-owned Bjorkdal Gold
Mine. In addition to Bjorkdal, the Company also has other assets in the country;
the Ronnberget Gold Property (adjacent to Bjorkdal) and the Norrliden
Polymetallic Deposit. 


Gold-Ore's project information is posted on the Company's web site at
www.goldoreresources.com.


ON BEHALF OF THE BOARD

Robert S. Wasylyshyn, President

This news release may contain forward-looking statements including but not
limited to comments regarding the timing and content of upcoming work programs,
geological interpretations, receipt of property titles, potential mineral
recovery processes, etc. Forward-looking statements address future events and
conditions and therefore, involve inherent risks and uncertainties. Actual
results may differ materially from those currently anticipated in such
statements.


News Release 09-16

Gold-Ore Resources Ltd (TSXV:GOZ)
Historical Stock Chart
Von Jun 2024 bis Jul 2024 Click Here for more Gold-Ore Resources Ltd Charts.
Gold-Ore Resources Ltd (TSXV:GOZ)
Historical Stock Chart
Von Jul 2023 bis Jul 2024 Click Here for more Gold-Ore Resources Ltd Charts.