TORONTO, Jan. 5, 2024
/CNW/ - Laurion Mineral Exploration Inc. (TSXV: LME) (OTC
PINK: LMEFF) ("LAURION" or the "Corporation") is
pleased to announce the assay results of the first five diamond
drill holes from its Fall 2023 diamond drill program, which was
completed on the Corporation's Ishkoday Project, located in
Ontario, 220 km northeast of
Thunder Bay and 28 km northeast of
the town of Beardmore.
LAURION recently announced the completion of its Fall drill
program of 3,636 metres in nine diamond drill holes. The primary
objective of the first five diamond drill holes was to target the
northeast extension of the Sturgeon River Mine structure. The
Sturgeon River Mine mineralization system comprises the Number 1, 2
and 3 (main) quartz veins, as well as other quartz veins and shear
structures encountered in the historic mining of the Sturgeon River
Mine. The Number 3 quartz vein was mined between 1936 and 1942.
The Number 3 quartz vein (historically mined) consists of
anastomosing quartz veins oriented north-northeast and steeply
dipping to the southeast. The mineralized system also comprises
other mineralized structures, such as the Numbers 1 and 2 quartz
veins, Coniagas and Numbers 1 8-11 quartz veins (the "3 Vein Quartz
Vein System or 3QVS") along with additional secondary (for now)
quartz veins and shears of different sizes and trends. The original
system was historically defined over a strike length of
450 m.
The drill program targeted the extension of the system to the
northeast with the intention of doubling the strike length of the
mineralized structures. The results received to date demonstrate
that the system extends on significant strike length and is still
open at depth and along strike. Confirming the extensions of this
known structure will assist with updating the 2-D and 3-D
geological mineralization model LAURION, which should provide a
solid technical base to initiate further diamond drilling programs
in this area.
Drilling Highlights
The results for the five aforementioned diamond drill holes,
LBX22-032 to LBX22-036, include the following intersection
highlights:
Assay Results: Highlights of the Northeastern Sturgeon Rive
Mine Drill Holes
Holes
ID
|
From
(m)
|
To
(m)
|
Core
Length
(m)
|
Au
(g/t)
|
LME23-032
|
172.50
|
176.00
|
3.50
|
29.5
|
including
|
172.50
|
173.05
|
0.55
|
186.00
|
LME23-032
|
233.75
|
234.28
|
0.53
|
7.78
|
LME23-032
|
240.4
|
240.96
|
0.56
|
1.05
|
LME23-032
|
243.1
|
244.76
|
1.66
|
3.11
|
including
|
243.1
|
243.72
|
0.62
|
8.11
|
LME23-033
|
80.5
|
81.0
|
0.5
|
1.64
|
LME23-033
|
210
|
212.55
|
2.55
|
1.23
|
including
|
210
|
210.6
|
0.6
|
4.35
|
including
|
210.6
|
212.55
|
1.95
|
0.27
|
LME23-033
|
338.0
|
338.7
|
0.7
|
4.49
|
LME23-034
|
70.8
|
71.4
|
0.6
|
1.36
|
LME23-034
|
127.8
|
128.3
|
0.5
|
3.26
|
LME23-034
|
175.75
|
177.75
|
2.0
|
12.89
|
LME23-034
|
176.35
|
177.75
|
1.4
|
17.63
|
LME23-034
|
176.35
|
177
|
0.65
|
18.25
|
LME23-034
|
227.2
|
228.2
|
1.0
|
0.54
|
LME23-034
|
245.5
|
247
|
1.5
|
5.10
|
LME23-034
|
245.5
|
246.4
|
0.9
|
7.87
|
LME23-034
|
458.3
|
459.1
|
0.8
|
2.71
|
LME23-035
|
25.5
|
26.0
|
0.5
|
3.58
|
LME23-035
|
289.9
|
290.4
|
0.5
|
1.05
|
LME23-035
|
314.25
|
315.05
|
0.8
|
1.38
|
LME23-035
|
343.4
|
344
|
0.6
|
1.38
|
LME23-036
|
123.75
|
124.25
|
0.5
|
1.79
|
LME23-036
|
171.1
|
172.0
|
0.9
|
1.44
|
LME23-036
|
214.35
|
214.9
|
0.55
|
1.68
|
LME23-036
|
219.05
|
220.25
|
1.2
|
7.38
|
including
|
219.75
|
220.25
|
0.5
|
17.5
|
LME23-036
|
400.8
|
401.35
|
0.55
|
4.19
|
Coordinates for Drill Holes LME23-032 to LME23-036
Drill
Hole
Number
|
Azimuth
|
Dip
|
Planned
(m)
|
Actual
(m)
|
LME23-032
|
150
|
-45
|
500
|
513
|
LME23-033
|
115
|
-45
|
350
|
342
|
LME23-034
|
115
|
-60
|
500
|
465
|
LME23-035
|
90
|
-45
|
350
|
354
|
LME23-036
|
90
|
-60
|
475
|
480
|
TOTAL
|
2,175
|
2,154
|
Sampling and QA/QC
Protocols
All core was transported and stored inside the core facility
located in Beardmore.
LAURION employs an industry standard system of external
standards, blanks and duplicates for all of its sampling, in
addition to the QA/QC protocol employed by the
laboratory.
After logging, core samples were identified and then cut in half
along core axis in the same building, and then zip tied
individually in plastic sample bags with a bar code. Approximately
five or six of these individual bags were then stacked into a
"rice" white material bag and stored on a skid for final shipment
to the laboratory.
All core samples were shipped to the ALS facility in
Thunder Bay, which were then
prepared by ALS Global Geochemistry in Thunder Bay, and analyzed by ALS Global
Analytical Lab in North Vancouver,
British Columbia.
Samples are processed by 4-acid digestion and analyzed by fire
assay on 50 g pulps and ICP-AES (Inductively-Coupled-Plasma –
Atomic-Element-Spectroscopy). Over limit analyses are reprocessed
with gravimetric finish. A total of 5% blanks and 5% standard are
inserted randomly within all samples. 5% of the best assay result
pulps were sent for re-assays. A total of 8.7% blanks and 9.5%
standard were randomly inserted during the pXRF analyse of the soil
sampling. 2.8% we re-analyzed. All QAQC were verified, and no
contamination or bias have been observed.
The remaining half of the core, as well as the unsampled core,
were stacked on a skid outside in Beardmore and then transferred to the Sturgeon
Mine site core farm for final storage.
Qualified Person
The technical contents of this release were reviewed and
approved by Jean-Philippe Paiement,
PGeo, MSc, a consultant to LAURION, and a qualified person as
defined by National Instrument 43-101 – Standards of Disclosure for
Mineral Projects.
About LAURION Mineral Exploration
Inc.
The Corporation is a junior mineral exploration and development
company listed on the TSXV under the symbol LME and on the OTC
under the symbol LMEFF. LAURION now has 263,346,102 outstanding
shares of which approximately 72% are owned and controlled by
Insiders who are eligible investors under the "Friends and Family"
categories.
LAURION's emphasis is on the exploration and development of its
flagship project, the 100% owned mid-stage 57.43 km2 Ishkoday
Project, and its gold-rich polymetallic mineralization.
Caution Regarding Forward-Looking
Information
This press release contains forward-looking statements, which
reflect the Corporation's current expectations regarding future
events, including with respect to LAURION's business, operations
and condition, management's objectives, strategies, beliefs and
intentions, the Corporation's ability to advance the Ishkoday
Project, the drill results and highlights described in this press
release and the interpretation and expected impact of these results
and highlights, the nature, timing and potential results of the
Corporation's future exploration efforts and drill programs,
including its planned activities for the Ishkoday Project in 2024.
The forward-looking statements involve risks and uncertainties.
Actual events and future results, performance or achievements
expressed or implied by such forward-looking statements could
differ materially from those projected herein including as a result
of a change in the trading price of the common shares of LAURION,
the interpretation and actual results of current exploration
activities, changes in project parameters as plans continue to be
refined, future prices of gold and/or other metals, possible
variations in grade or recovery rates, failure of equipment or
processes to operate as anticipated, the failure of contracted
parties to perform, labor disputes and other risks of the mining
industry, delays in obtaining governmental approvals or financing
or in the completion of exploration, as well as those factors
disclosed in the Corporation's publicly filed documents. Investors
should consult the Corporation's ongoing quarterly and annual
filings, as well as any other additional documentation comprising
the Corporation's public disclosure record, for additional
information on risks and uncertainties relating to these
forward-looking statements. The reader is cautioned not to rely on
these forward-looking statements. Subject to applicable law, the
Corporation disclaims any obligation to update these
forward-looking statements.
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICE
PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX
VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR
ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.
SOURCE Laurion Mineral Exploration Inc.