UNITED STATES
SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 

 

 

Form 6-K

 

 

 

REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE
13a-16 OR 15d-16 UNDER
THE SECURITIES EXCHANGE ACT OF 1934

 

For the month of October 2021

 

Commission File Number 001-13314

 

 

 

Huaneng Power International, Inc.

(Translation of registrant’s name into English)

 

 

 

Huaneng Power International, Inc.

Huaneng Building,

6 Fuxingmennei Street,

Xicheng District,

Beijing, 100031 PRC

(Address of principal executive office)

 

 

 

Indicate by check mark whether the registrant files or will file annual reports under cover Form 20-F or Form 40-F.  Form 20-F  x Form 40-F  ¨

 

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): ¨

 

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): ¨

 

 

 

 

 

 

This Form 6-K consists of:

 

1.            An announcement regarding issue of super short-term debentures of Huaneng Power International, Inc.(the "Registrant"); and

 

2.            An announcement regarding domestic electricity sold in the first three quarters of 2021 of the Registrant;

 

Each made by the Registrant on October 19, 2021.

 

 

 

 

SIGNATURES

 

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

  HUANENG POWER INTERNATIONAL, INC.

 

  By: /s/ Huang Chaoquan
  Name: Huang Chaoquan
  Title: Company Secretary
   
Date: October 19, 2021  

 

 

 

 

Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement.

 

???????????? ?????? ?????????

?????????????????????

 

OVERSEAS REGULATORY ANNOUNCEMENT ISSUE OF SUPER SHORT-TERM DEBENTURES

 

This announcement is made pursuant to Rule 13.10B of the Rules Governing the Listing of Securities on The Stock Exchange of Hong Kong Limited (the “Listing Rules”).

 

As resolved at the 2020 annual general meeting of Huaneng Power International, Inc. (the “Company”) held on 22 June 2021, the Company has been given a mandate to issue super short-term debentures (in either one or multiple tranches on rolling basis) with a principal amount of up to RMB30 billion (which means that the outstanding principal balance of the super short-term debentures in issue shall not exceed RMB30 billion at any time within the period as prescribed therein) within the period from approval obtained at 2020 annual general meeting to the conclusion of the 2021 annual general meeting.

 

The Company has recently completed the issue of the thirteenth tranche of the Company’s super short- term debentures for 2021 (the “Debentures”). The total issuing amount was RMB1.5 billion with a maturity period of 32 days whereas the unit face value is RMB100 and the interest rate is 2.05%.

 

Hengfeng Bank Co., Ltd. acts as the lead underwriter to form the underwriting syndicate for the Debentures, which were placed through book-building and issued in the domestic bond market among banks. The proceeds from the Debentures will be used to supplement the working capital of the headquarters of the Company, adjust debts structure and repay bank loans and the debt due.

 

The relevant documents in respect of the Debentures are posted on China Money and Shanghai Clearing House at websites of www.chinamoney.com.cn and www.shclearing.com, respectively.

 

1 - 

 

 

The Debentures do not constitute any transaction under Chapter 14 and Chapter 14A of the Listing Rules.

 

  By Order of the Board
  Huaneng Power International, Inc.
  Huang Chaoquan
  Company Secretary

 

As at the date of this announcement, the directors of the Company are:

 

Zhao Keyu (Executive Director) Xu Mengzhou (Independent Non-executive Director)
Zhao Ping (Executive Director) Liu Jizhen (Independent Non-executive Director)
Huang Jian (Non-executive Director) Xu Haifeng (Independent Non-executive Director)
Wang Kui (Non-executive Director) Zhang Xianzhi (Independent Non-executive Director)
Lu Fei (Non-executive Director) Xia Qing (Independent Non-executive Director)
Teng Yu (Non-executive Director)  
Mi Dabin (Non-executive Director)  
Cheng Heng (Non-executive Director)  
Li Haifeng (Non-executive Director)  
Lin Chong (Non-executive Director)  

 

Beijing, the PRC

19 October 2021

 

2 - 

 

 

Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement.

 

???????????? ?????? ?????????

?????????????????????

 

ANNOUNCEMENT ON DOMESTIC ELECTRICITY SOLD IN THE FIRST THREE QUARTERS OF 2021

 

This announcement is made pursuant to Rule 13.10B of the Rules Governing the Listing of Securities on The Stock Exchange of Hong Kong Limited.

 

According to the preliminary statistics of Huaneng Power International, Inc., (the “Company”), in the third quarter of 2021, the electricity sold by the Company’s operating power plants in China, on consolidated basis, amounted to 115.188 billion kWh, representing an increase of 10.98% compared to the same period last year. For the first three quarters of 2021, the electricity sold by the Company’s operating power plants in China, on consolidated basis, reached a total of 323.115 billion kWh, representing an increase of 17.11% over the same period last year. The average on-grid electricity settlement price for the Company’s operating power plants in China for the first three quarters of 2021 was RMB417.79 per MWh, representing an increase of 1.28% over the same period last year. For the first three quarters of 2021, the Company’s market based electricity sold ratio was 59.99%, representing an increase of 3.05 percentage points over the same period last year.

 

The increase in the Company’s power generation was mainly attributable to the following factors:

 

1. In the first three quarters, the electricity consumption of the whole society maintained a high level of operation, driving the power generation to increase significantly year-on-year. Among them, the power generation of the power plants in the regions of Chongqing, Guangdong, Zhejiang, Shanghai, Fujian, Hunan, and Jiangsu increased significantly year-on-year.

 

2. During the peak summer period, the thermal power load maintained rapid growth, and the Company’s thermal power unit utilization hours increased significantly, which further accelerated the Company’s year-on-year growth in power generation.

 

1 - 

 

 

The electricity sold (in billion kWh) of the Company, by regions, are listed below:

 

    Electricity Sold  
Region   July to September 2021     Change     January to September 2021     Change  
Heilongjiang Province     3.858       14.30 %     10.046       3.52 %
Coal-fired     3.576       13.85 %     9.088       2.76 %
Wind-power     0.252       24.74 %     0.860       13.17 %
PV     0.030       -6.93 %     0.098       -2.89 %
Jilin Province     1.828       -38.76 %     6.547       -17.15 %
Coal-fired     1.501       -43.32 %     5.237       -23.59 %
Wind-power     0.158       -24.98 %     0.825       10.48 %
Hydro-power     0.037       158.62 %     0.054       -3.02 %
PV     0.047       -17.66 %     0.186       108.57 %
Biomass power     0.085       53.85 %     0.244       55.64 %
Liaoning Province     5.751       15.39 %     14.726       17.05 %
Coal-fired     5.647       89.20 %     14.291       17.69 %
Wind-power     0.060       -9.32 %     0.299       7.87 %
Hydro-power     0.009       -53.43 %     0.022       -44.36 %
PV     0.035       -7.14 %     0.115       -5.88 %
Inner Mongolia     0.114       183.10 %     0.355       142.26 %
Wind-power     0.114       183.10 %     0.355       142.26 %
Hebei Province     2.648       -7.98 %     8.024       -1.12 %
Coal-fired     2.550       -8.37 %     7.654       -1.34 %
Wind-power     0.072       -10.15 %     0.32       2.53 %
PV     0.025       82.40 %     0.048       11.29 %
Gansu Province     2.918       38.90 %     10.524       15.79 %
Coal-fired     2.335       57.49 %     8.674       19.50 %
Wind-power     0.583       -5.69 %     1.850       1.06 %
Ningxia     0.007       6.54 %     0.018       -4.69 %
PV     0.007       6.54 %     0.018       -4.69 %
Beijing     2.376       20.91 %     6.466       10.23 %
Coal-fired                 0.648       3.60 %
Combined Cycle     2.376       20.91 %     5.818       11.03 %
Tianjin     1.835       22.02 %     4.716       8.05 %
Coal-fired     1.466       30.25 %     3.699       11.67 %
Combined Cycle     0.366       -0.88 %     1.006       -3.33 %

 

2 - 

 

 

    Electricity Sold  
Region   July to September 2021     Change     January to September 2021     Change  
PV     0.004       -60.94 %     0.011       -2.57 %
Shanxi Province     2.430       -11.13 %     6.953       -1.14 %
Coal-fired     2.159       -15.20 %     4.938       -9.18 %
Combined Cycle     0.012       532.35 %     1.187       -1.23 %
Wind-power     0.052             0.192        
PV     0.207       10.81 %     0.637       61.40 %
Shandong Province     21.956       4.07 %     59.848       10.90 %
Coal-fired     21.536       3.19 %     58.282       9.82 %
Wind-power     0.219       138.66 %     0.975       96.72 %
PV     0.129       -4.84 %     0.400       -0.50 %
Biomass power     0.073             0.192        
Henan Province     6.012       5.40 %     16.719       13.41 %
Coal-fired     5.181       -2.19 %     13.908       2.95 %
Combined Cycle     0.120       -31.39 %     0.210       -62.58 %
Wind-power     0.704       213.29 %     2.582       296.17 %
PV     0.006       -9.33 %     0.019       -0.30 %
Jiangsu Province     11.370       9.01 %     31.781       19.74 %
Coal-fired     8.683       0.94 %     24.022       10.61 %
Combined Cycle     1.654       29.73 %     4.606       53.33 %
Wind-power     0.964       96.07 %     2.951       73.43 %
PV     0.069       12.45 %     0.202       70.89 %
Shanghai     5.236       21.33 %     15.055       26.97 %
Coal-fired     4.810       24.94 %     14.000       30.72 %
Combined Cycle     0.418       -9.12 %     1.031       -9.59 %
PV     0.008       37.00 %     0.023       279.26 %
Chongqing     3.028       44.40 %     9.533       53.42 %
Coal-fired     2.501       59.62 %     7.535       51.66 %
Combined Cycle     0.443       -0.25 %     1.787       69.71 %
Hydro-power     0.084       -2.40 %     0.211       9.82 %
Zhejiang Province     9.450       35.35 %     24.289       33.08 %
Coal-fired     9.096       35.96 %     23.366       32.02 %
Combined Cycle     0.339       22.53 %     0.880       72.95 %
PV     0.016       -0.53 %     0.042       -3.28 %

 

3 - 

 

 

    Electricity Sold  
Region   July to September 2021     Change     January to September 2021     Change  
Hubei Province     3.780       11.17 %     12.146       17.81 %
Coal-fired     3.511       11.24 %     11.405       18.54 %
Wind-power     0.148       33.52 %     0.479       16.10 %
Hydro-power     0.114       -9.61 %     0.245       -4.96 %
PV     0.006       1.37 %     0.017       -2.56 %
Hunan Province     3.547       41.09 %     8.553       24.42 %
Coal-fired     3.340       44.39 %     7.828       28.00 %
Wind-power     0.139       6.96 %     0.481       5.71 %
Hydro-power     0.052       -8.73 %     0.207       -23.03 %
PV     0.016       13.40 %     0.037       5.81 %
Jiangxi Province     6.104       1.64 %     16.290       11.48 %
Coal-fired     5.763       0.34 %     15.336       10.69 %
Wind-power     0.202       6.27 %     0.635       2.54 %
PV     0.139       93.44 %     0.319       130.92 %
Anhui Province     1.463       23.27 %     4.240       18.21 %
Coal-fired     1.231       20.25 %     3.515       7.84 %
Wind-power     0.179       96.21 %     0.603       152.42 %
PV     0.053       -26.61 %     0.122       37.93 %
Fujian Province     6.637       10.57 %     15.531       26.53 %
Coal-fired     6.633       10.57 %     15.521       26.54 %
PV     0.004       15.03 %     0.010       6.72 %
Guangdong Province     8.078       11.18 %     24.449       44.81 %
Coal-fired     7.050       7.91 %     21.275       32.04 %
Combined Cycle     1.021       40.66 %     3.155       319.07 %
PV     0.007       8.86 %     0.019       8.68 %
Guangxi Province     0.162       -10.62 %     0.545       18.52 %
Combined Cycle     0.113       -12.44 %     0.326       6.38 %
Wind-power     0.049       -6.09 %     0.219       42.71 %
Yunnan Province     0.897       -2.21 %     6.223       20.18 %
Coal-fired     0.804       1.62 %     5.860       24.11 %
Wind-power     0.070       -33.11 %     0.339       -21.57 %
Hydro-power     0.022       7.51 %     0.024       -1.14 %

 

4 - 

 

 

    Electricity Sold  
Region   July to September 2021     Change     January to September 2021     Change  
Guizhou Province     0.219       196.23 %     0.397       71.85 %
Wind-power     0.038       -17.49 %     0.140       -21.37 %
PV     0.182       536.67 %     0.258       380.45 %
Hainan Province     3.484       14.47 %     9.140       0.30 %
Coal-fired     3.312       14.55 %     8.572       -1.92 %
Combined Cycle     0.115       9.62 %     0.368       76.14 %
Wind-power     0.009       4.71 %     0.048       -13.63 %
Hydro-power     0.018       121.91 %     0.067       163.77 %
PV     0.030       -1.48 %     0.085       2.56 %
Total     115.188       10.98 %     323.115       17.11 %

 

For the third quarter of 2021, the power generation of Tuas Power Limited in Singapore, which is wholly-owned by the Company, accounted for a market share of 18.7% in Singapore, representing a decrease of 2.9 percentage points compared to the same period last year. In the first three quarters of 2021, the accumulated power generation accounted for a market share of 19.9%, representing a decrease of 1.6 percentage points compared to the same period last year.

 

In the third quarter of 2021, the new generation units put into operation were as follows:

 

    (Unit: MW)  
Type of Generation Unit   Controlled installed capacity     Equity-based installed capacity  
Wind-power     583.6       583.6  
PV     278       278  
Total     861.6       861.6  

 

Meanwhile, the installed capacity of certain power plants invested by the Company changed in the third quarter of 2021.

 

5 - 

 

 

Based on the above, as of 30 September 2021, the Company had a controlled installed capacity of 115,014MW and an equity-based installed capacity of 101,388MW.

 

  By order of the Board
  Huaneng Power International, Inc.
  Huang Chaoquan
  Company Secretary

 

As of the date of the announcement, the directors of the Company are:

 

Zhao Keyu (Executive Director) Xu Mengzhou (Independent Non-executive Director)
Zhao Ping (Executive Director) Liu Jizhen (Independent Non-executive Director)
Huang Jian (Non-executive Director) Xu Haifeng (Independent Non-executive Director)
Wang Kui (Non-executive Director) Zhang Xianzhi (Independent Non-executive Director)
Lu Fei (Non-executive Director) Xia Qing (Independent Non-executive Director)
Teng Yu (Non-executive Director)  
Mi Dabin (Non-executive Director)  
Cheng Heng (Non-executive Director)  
Li Haifeng (Non-executive Director)  
Lin Chong (Non-executive Director)  

 

Beijing, the PRC

19 October 2021

 

6 - 

 

Huaneng Power (NYSE:HNP)
Historical Stock Chart
Von Dez 2024 bis Jan 2025 Click Here for more Huaneng Power Charts.
Huaneng Power (NYSE:HNP)
Historical Stock Chart
Von Jan 2024 bis Jan 2025 Click Here for more Huaneng Power Charts.