Stantec selected to support Toronto’s Gardiner Expressway Rehabilitation Section 4
12 Dezember 2024 - 12:45PM
TSX, NYSE:STN
Stantec, a global leader in sustainable design and engineering,
has been selected by the City of Toronto for Owner’s
Engineer/Technical Advisory Services (OETA) for the delivery of the
F.G. Gardiner Expressway Rehabilitation Project Section 4. Stantec
will provide multidisciplinary engineering consulting services
through planning and preliminary design, procurement, design-build,
and post construction. Early in 2024, Stantec announced its
acquisition of Morrison Hershfield, which doubled its
transportation staff in Ontario and strengthened its presence in
the Greater Toronto Area.
Complex infrastructure rehabilitation in the heart of
TorontoThe Gardiner Expressway is one of Canada’s busiest
corridors, with 140,000 vehicles traveling it daily. Age, heavy
use, weather, and salt have necessitated a multiyear rehabilitation
to extend its life. The expressway runs along established
neighborhoods and the city’s downtown core, making it an extremely
complex project.
“The Gardiner Expressway is a critical corridor for the city,”
said Susan Walter, executive vice president of Infrastructure at
Stantec. “We have been working with the City of Toronto’s on its
multiyear Strategic Rehabilitation Plan to support the safe
operation and increase the life of this 60-year-old expressway
since 2019.”
Section 4 of the rehabilitation will replace 2.2 kilometers of
elevated roadway from Grand Magazine Street to York Street. It is
in the heart of the City of Toronto and includes 91 bridge spans
and 5 on- and off-ramps. The rehabilitation strategy will include
structural modifications, deck replacement, structural steel girder
repairs or replacement, and substructure rehabilitation and
associated works. Stantec’s contract on Section 4 is valued at C$24
million.
Longstanding relationship with the City of
TorontoStantec has previously completed significant work
for the City of Toronto on the Gardiner Expressway Rehabilitation
Plan, including of the ongoing Section 2 deck replacement from
Dufferin Street to Strachan Avenue, contract administration for
Section 1 from Jarvis Street to Cherry Street, and preliminary
design for Section 5 from Cherry Street to the Don Valley
Parkway.
“Since 1979, we have completed extensive work for the City of
Toronto on the Gardiner Expressway,” said Jim Weir, transportation
regional growth leader for Canada at Stantec. “We will be working
closely with the City to safely upgrade Section 4 from the earliest
stages until construction completion.”
Stantec has helped deliver several major transportation projects
around the Greater Toronto Area. The projects include the Toronto
Subway Program, Ontario Line, Hazel McCallion Line, Waterfront East
Light Rail Transit Extension, Highway 401/409 Rail Tunnel, and the
rehabilitation and reconstruction of 63 bridges across the
city.
Learn more about Transportation at Stantec.
About Stantec
Stantec empowers clients, people, and communities to rise to the
world’s greatest challenges at a time when the world faces more
unprecedented concerns than ever before.
We are a global leader in sustainable architecture, engineering,
and environmental consulting. Our professionals deliver the
expertise, technology, and innovation communities need to manage
aging infrastructure, demographic and population changes, the
energy transition, and more.
Today’s communities transcend geographic borders. At Stantec,
community means everyone with an interest in the work that we
do—from our project teams and industry colleagues to our clients
and the people our work impacts. The diverse perspectives of our
partners and interested parties drive us to think beyond what’s
previously been done on critical issues like climate change,
digital transformation, and future-proofing our cities and
infrastructure.
We are designers, engineers, scientists, project managers, and
strategic advisors. We innovate at the intersection of community,
creativity, and client relationships to advance communities
everywhere, so that together we can redefine what’s possible.
Stantec trades on the TSX and the NYSE under the symbol STN.
Visit us at stantec.com or find us on social media.
Cautionary Note Regarding Forward-Looking StatementsThis news
release contains forward-looking statements regarding the
initiatives and projects described above. Forward-looking
statements also include any other statements that do not refer to
historical facts. By their nature, forward-looking statements are
based on assumptions and subject to inherent risks and
uncertainties. There is a risk that the initiatives and projects
described above may be delayed, cancelled, suspended or terminated.
This could cause future results to differ materially from the
forward-looking statements made in this news release. Except as may
be required by law, Stantec undertakes no obligation to publicly
update or revise any forward-looking statements. Forward-looking
statements are provided herein for the purpose of giving
information about the initiatives and projects referred to above
and their expected impact. Readers are cautioned that such
information may not be appropriate for other purposes.
Media ContactColin NekolaichukStantec Media
RelationsPh: (437)
225-6384colin.nekolaichuk@stantec.com
|
Investor ContactJess NieukerkStantec Investor
RelationsPh: (403) 569-5389
ir@stantec.com |
Stantec (TSX:STN)
Historical Stock Chart
Von Nov 2024 bis Dez 2024
Stantec (TSX:STN)
Historical Stock Chart
Von Dez 2023 bis Dez 2024