Parex Resources Inc. ("Parex" or the "Company") (TSX:PXT) is pleased to announce
the results of its updated reserves assessment as at June 30, 2014, increased
production guidance and an operational update. All amounts are stated in US
dollars the reporting currency of Parex. 


Mid-Year Corporate Reserves Report Highlights:



--  Material increase in all reserve categories driven by a balanced capital
    program and a strategic acquisition: 
    --  Appraisal drilling: LLA-34:Tigana; 
    --  Exploration drilling discoveries: LLA-34:Aruco, LLA-40:Begonia, LLA-
        32:Kananaskis, Calona and Carmentea; 
    --  Strategic acquisition: Increased working interest in blocks LLA-32
        and LLA-34; 
--  Proved plus probable ("2P") reserves growth of 80 percent in six months,
    increasing from 32.0 million barrels of oil equivalent ("MMboe") (net
    company working interest) at December 31, 2013 to 57.6 MMboe (net
    company working interest) at June 30, 2014; 
--  Proved plus probable after tax net present value discounted at 10
    percent of approximately USD$1.33 billion (CAD$1.41 billion at current
    spot exchange rate) at June 30, 2014 compared to USD$832 million at
    December 31, 2013; 
--  Gross undeveloped drilling locations increased to 47, 78 and 99 wells in
    the proved ("1P"), proved plus probable ("2P") and proved plus probable
    plus possible ("3P") cases; 
--  2P reserve life index ("RLI") increases from 5.1 years to 6.7 years; and
--  Underpinned by strong reserves growth, Parex expects Q4 2014 exit rate
    production to exceed approximately 27,000 barrels of oil per day
    ("bopd"), as compared to the Q2 2014 production exit rate of
    approximately 23,500 bopd. 



2014 Mid-Year Reserves Report

Following a successful drilling program during the first half of 2014 and the
strategic acquisition, Parex engaged GLJ Petroleum Consultants Ltd. ("GLJ") to
prepare an independent reserve evaluation of the corporation's reserves.


The following tables summarize information contained in the independent reserves
report prepared by GLJ effective June 30, 2014 ("GLJ Report") with comparatives
to the year ended December 31, 2013. The GLJ Report was prepared in accordance
with definitions, standards and procedures contained in the Canadian Oil and Gas
Evaluation Handbook ("COGE Handbook") and National Instrument 51-101, Standards
of Disclosure for Oil and Gas Activities ("NI 51-101"). Consistent with the
Company's reporting currency, all amounts are in United States dollars unless
otherwise noted.


Discussion of Reserves

Parex' crude oil reserves are located in Colombia's Llanos Basin. Reserve
additions as evaluated by GLJ were primarily generated from a successful 2014
oil exploration and appraisal program and the strategic acquisition. The GLJ
Report did not evaluate and excludes potential natural gas and natural gas
liquids associated from Block LLA-32.


Reserves Volumes



                                                                    Increase
                             December     December     June 30,         over
                             31, 2012     31, 2013         2014      Dec 31,
Reserves Category(1)     (Mbbl)(2)(3) (Mboe)(2)(4)    (Mboe)(2)         2013
----------------------------------------------------------------------------
Proved (1P)                    10,063       17,368       31,908          84%
Proved plus Probable                                                        
 (2P)                          16,100       32,021       57,596          80%
Proved plus Probable                                                        
 plus Possible (3P)            23,131       49,949       90,637          81%
----------------------------------------------------------------------------

1.  Reserves are greater than 98.5% light and medium crude oil. The GLJ
    Report includes 1,596 MMcf of 1P and 4,496 MMcf of 2P gas reserves for
    the La Casona field. The December 31, 2013 GLJ Report included 1,282
    MMcf of 1P and 3,581 MMcf of 2P gas reserves. All reserves are presented
    as Parex working interest before royalties. 
2.  Mbbl is defined as thousand barrels of oil. Mboe is defined as thousand
    barrels of oil equivalent. 
3.  The reserves data at December 31, 2012 are based on an evaluation by GLJ
    and prepared in accordance with the COGE Handbook and NI 51-101. 
4.  The reserves data at December 31, 2013 are based on an evaluation by GLJ
    and prepared in accordance with the COGE Handbook and NI 51-101. 



Five Year Crude Oil Price Forecast - GLJ Report (June 30, 2014)



                                2014      2015      2016      2017      2018
----------------------------------------------------------------------------
ICE Brent (USD$/bbl)         $110.59   $107.50   $105.00   $102.50   $102.50
----------------------------------------------------------------------------



Reserves Net Present Value After Tax Summary in USD(1)



                                      December                              
                                      31, 2013  June 30, 2014  Increase over
Reserves Category                   ($000s)(4)  ($000s)(2)(3)   Dec 31, 2013
----------------------------------------------------------------------------
Proved                                $502,822       $812,376            62%
Proved plus Probable                  $832,378     $1,326,335            59%
Proved plus Probable plus                                                   
 Possible                           $1,213,913     $1,938,626            60%
----------------------------------------------------------------------------

1.  Net present values are stated in USD and are discounted at 10 percent.
    For reference CAD spot rate was 1.064 on July 9, 2014. 
2.  Includes future development capital (FDC) of $269 million for 1P and
    $423 million for 2P; at Dec 31, 2013 FDC was $147 million for 1P and
    $232 million for 2P. 
3.  The forecast prices used in the calculation of the present value of
    future net revenue are based on the GLJ June 30, 2014 price forecast. 
4.  The reserves data at December 31, 2013 are based on an evaluation by GLJ
    and prepared in accordance with the COGE Handbook and NI 51-101. 



Reserve Life Index ("RLI")



                                        Dec. 31, 2013(1)    June 30, 2014(2)
----------------------------------------------------------------------------
Proved Plus Probable (2P)                      5.1 years           6.7 years
----------------------------------------------------------------------------

1.  Calculated using average fourth quarter (Q4) production of 17,287 bopd
    annualized. 
2.  Calculated using estimated second quarter (Q2) exit rate production of
    23,500 bopd annualized. 



2014 Production Guidance Increased: 2014 Exit Rate to Exceed 27,000 bopd

Supported by the Company's exploration and appraisal drilling to date in 2014
and its recent acquisition, Parex is increasing its 2014 full year production
guidance to approximately 22,250 bopd, which is 40% higher than the prior year,
and expects the 2014 exit production rate to be greater than 27,000 bopd.
Furthermore, we believe that our revised production guidance could be achieved
without further exploration success during the remainder of 2014.


Revised 2014 Production Guidance



----------------------------------------------------------------------------
Three months                                                                
 ended         Q4'13  Q1'14 Q2'14F        Q3'14F        Q4'14F        FY'14F
----------------------------------------------------------------------------
Average daily                                                               
 production                                                                 
 (bopd)       17,287 18,425 19,872 24,500-25,000 25,500-26,500 22,100-22,500
----------------------------------------------------------------------------
Increase from                                                               
 prior                                                                      
 quarter          7%     7%     8%       23%-26%         4%-6%              
----------------------------------------------------------------------------



2014 production growth is primarily driven by the Akira, Tigana and Tua fields,
plus LLA-32 exploration success. The Company forecasts that the increased 2014
production guidance can be achieved with a capital expenditure budget of $365
million, excluding the corporate acquisition costs, and forecast to be funded
entirely from cash flow. The increase in forecast capital expenditures from the
original $280 million budget is primarily driven from working interest increases
on blocks LLA-32, LLA-34, and Cerrero block and the El Porton block farm-ins.


Updated 2014 Drilling Program Forcast (Wells Gross Number)



                                        H1' 14         H2' 14        FY 2014
----------------------------------------------------------------------------
Development/Appraisal                       10             15             25
Exploration                                 13              7             20
----------------------------------------------------------------------------
Total 2014 Wells Drilled                    23             22             45
----------------------------------------------------------------------------
----------------------------------------------------------------------------



Parex expects to drill up to a total of 45 wells in 2014. During the second half
of 2014, development and appraisal drilling will be focused on blocks LLA-32,
LLA-34 and Cabrestero.


July Operations Update

For the reminder of the year, Parex expects to have 2 operated drilling rigs and
1 non-operated drilling rig in service.


Akira (Operated, Cabrestero Block, WI 100%): The oil treatment plant was
commissioned on schedule. During Q3 2014 we expect Akira-7 and Akira-8 to begin
producing and we plan to drill Akira-9 and Akira-10 in 2014.


Arlequin (Operated, Cebucan Block, WI 100%): The Arlequin-1 exploration well
reached its planned total depth at 15,300 feet and was cased. We plan to test
this well during Q3 2014.


Block LLA-32 (Operated, WI 70%): The Kananaskis-1 well is producing from the
Mirador Formation at an average gross rate of approximately 5,000 bopd. The
Kananaskis-2 well was drilled to appraise the Une Formation where natural gas
and natural gas liquids where produced in the Kananaskis-1 test. Kananaskis-2
was cased and will be tested in Q3 2014. Parex expects to drill one additional
development well and one appraisal well on the structure. Kananaskis-3 is
currently drilling as a Mirador appraisal well.


The Carmentea-1 is currently undergoing testing operations in the Mirador
Formation. Carmentea-2 was drilled and will be used for water disposal.


Block LLA-57 (Operated, WI 100%): Parex drilled 2 exploratory wells to fulfill
the initial exploration phase block work commitments. Neither well recovered
hydrocarbons and both wells will be abandoned.


Katmandu Norte (Operated, Cerrero Block, WI 65%): The Katmandu Norte-1
exploration well reached its planned total depth at 13,530 feet and was cased.
We plan to test during Q3 2014 along with the Cebucan Block Arlequin-1 well.


Las Maracas (Operated, Los Ocarros Block, WI 50%): The Las Maracas-15 well was
drilled, targeting by-pass oil pay. The well is being cased and will be tested
for oil production. Parex is currently preparing drilling operations for Las
Maracas-16 which is being drilled as a water disposal well.


Tigana (Non-Operated, Block LLA-34, WI 55%): Tigana-1, Tigana-2, Tigana-3 and
Tigana Sur-1 are currently producing approximately 8,500 (gross) bopd in
aggregate. We expect Tigana Norte-1, which was drilled approximately 1,300
meters northeast of the Tigana-1 discovery well, to begin production during Q3
2014. Tigana Sur Oeste-1 successfully delineated the Tigana structure along
trend approximately 2.4 kilometers from Tigana Sur-1, and this result was
included in the GLJ Report for June 30, 2014.


Parex and its partner expect to drill additional Tigana field appraisal wells
during 2014 and after constructing additional drilling pads in early 2015, we
expect to continue appraising the pool in the north and south directions
followed by a multi-year development plan.


Tua (Non-Operated, Block LLA-34, WI 55%): Tua-7 and Tua-8 have been approved by
partners as the next delineation wells to be drilled in the Tua field during Q3
2014.


This news release does not constitute an offer to sell securities, nor is it a
solicitation of an offer to buy securities, in any jurisdiction.


Reserve Advisory

The recovery and reserve estimates of crude oil reserves provided in this news
release are estimates only, and there is no guarantee that the estimated
reserves will be recovered. Actual crude oil reserves may eventually prove to be
greater than, or less than, the estimates provided herein. All June 30, 2014
reserves presented are based on GLJ's forecast pricing effective July 1, 2014,
all December 31, 2013 reserves presented are based on GLJ's forecast pricing
effective January 1, 2014 and all December 31, 2012 reserves presented are based
on GLJ's forecast pricing effective January 1, 2013.


"Proved" reserves are those reserves that can be estimated with a high degree of
certainty to be recoverable. It is likely that the actual remaining quantities
recovered will exceed the estimated proved reserves.


"Probable" reserves are those additional reserves that are less certain to be
recovered than proved reserves. It is equally likely that the actual remaining
quantities recovered will be greater or less than the sum of the estimated
proved plus probable reserves.


"Possible" reserves are those additional reserves that are less certain to be
recovered than probable reserves. There is a 10 percent probability that the
quantities actually recovered will equal or exceed the sum of proved plus
probable plus possible reserves. It is unlikely that the actual remaining
quantities recovered will exceed the sum of the estimated proved plus probable
plus possible reserves.


All evaluations and reviews of future net cash flow are stated prior to any
provision for interest costs or general and administrative costs and after the
deduction of estimated future capital expenditures for wells to which reserves
have been assigned. It should not be assumed that the estimated future net cash
flow shown below is representative of the fair market value of the Company's
properties. There is no assurance that such price and cost assumptions will be
attained, and variances could be material. The recovery and reserve estimates of
crude oil reserves provided are estimates only, and there is no guarantee that
the estimated reserves will be recovered. Actual crude oil reserves may be
greater than or less than the estimates provided.


The term "Boe" means a barrel of oil equivalent on the basis of 6 Mcf of natural
gas to 1 barrel of oil ("bbl"). Boe's may be misleading, particularly if used in
isolation. A boe conversation ratio of 6 Mcf: 1 Bbl is based on an energy
equivalency conversion method primarily applicable at the burner tip and does
not represent a value equivalency at the wellhead. Given the value ratio based
on the current price of crude oil as compared to natural gas is significantly
different from the energy equivalency of 6 Mcf: 1Bbl, utilizing a conversion
ratio at 6 Mcf: 1 Bbl may be misleading as an indication of value.


Advisory on Forward Looking Statements

Certain information regarding Parex set forth in this document contains
forward-looking statements that involve substantial known and unknown risks and
uncertainties. The use of any of the words "plan", "expect", "prospective",
"project", "intend", "believe", "should", "anticipate", "estimate" or other
similar words, or statements that certain events or conditions "may" or "will"
occur are intended to identify forward-looking statements. Such statements
represent Parex' internal projections, estimates or beliefs concerning, among
other things, future growth, results of operations, production, future capital
and other expenditures (including the amount, nature and sources of funding
thereof), competitive advantages, plans for and results of drilling activity,
environmental matters, business prospects and opportunities. These statements
are only predictions and actual events or results may differ materially.
Although the Company's management believes that the expectations reflected in
the forward-looking statements are reasonable, it cannot guarantee future
results, levels of activity, performance or achievement since such expectations
are inherently subject to significant business, economic, competitive, political
and social uncertainties and contingencies. Many factors could cause Parex'
actual results to differ materially from those expressed or implied in any
forward-looking statements made by, or on behalf of, Parex.


In particular, forward-looking statements contained in this document include,
but are not limited to, statements with respect to the performance
characteristics of the Company's oil properties; supply and demand for oil;
financial and business prospects and financial outlook; results of drilling and
testing, results of operations; drilling, testing and appraisal plans;
activities to be undertaken in various areas; capital plans in Colombia and exit
rate production; anticipated full year production rate and average daily
production; our belief that the Company's revised production guidance could be
achieved without further exploration success for the remainder of 2014; plans to
acquire and process 3D seismic; timing of drilling and completion; and planned
capital expenditures and the timing thereof. In addition, statements relating to
"reserves" are by their nature forward-looking statements, as they involve the
implied assessment, based on certain estimates and assumptions that the reserves
described can be profitably produced in the future. The recovery and reserve
estimates of Parex' reserves provided herein are estimates only and there is no
guarantee that the estimated reserves will be recovered.


These forward-looking statements are subject to numerous risks and
uncertainties, including but not limited to, the impact of general economic
conditions in Canada, Colombia; industry conditions including changes in laws
and regulations including adoption of new environmental laws and regulations,
and changes in how they are interpreted and enforced, in Canada, Colombia and
Trinidad & Tobago; competition; lack of availability of qualified personnel; the
results of exploration and development drilling and related activities;
obtaining required approvals of regulatory authorities, in Canada and Colombia;
risks associated with negotiating with foreign governments as well as country
risk associated with conducting international activities; volatility in market
prices for oil; fluctuations in foreign exchange or interest rates;
environmental risks; changes in income tax laws or changes in tax laws and
incentive programs relating to the oil industry; ability to access sufficient
capital from internal and external sources; risks related to the lawsuit brought
in Texas against Parex and certain foreign subsidiaries; failure of
counterparties to perform under the terms of their contracts; and other factors,
many of which are beyond the control of the Company. Readers are cautioned that
the foregoing list of factors is not exhaustive. Additional information on these
and other factors that could affect Parex' operations and financial results are
included in reports on file with Canadian securities regulatory authorities and
may be accessed through the SEDAR website (www.sedar.com).


Although the forward-looking statements contained in this document are based
upon assumptions which Management believes to be reasonable, the Company cannot
assure investors that actual results will be consistent with these
forward-looking statements. With respect to forward-looking statements contained
in this document, Parex has made assumptions regarding: current commodity prices
and royalty regimes; availability of skilled labour; timing and amount of
capital expenditures; future exchange rates; the price of oil; the impact of
increasing competition; conditions in general economic and financial markets;
availability of drilling and related equipment; effects of regulation by
governmental agencies; royalty rates; future operating costs; effects of
regulation by governmental agencies; uninterrupted access to areas of Parex'
operations and infrastructure; recoverability of reserves and future production
rates; the status of litigation; timing of drilling and completion of wells;
that Parex will have sufficient cash flow, debt or equity sources or other
financial resources required to fund its capital and operating expenditures and
requirements as needed; that Parex' conduct and results of operations will be
consistent with its expectations; that Parex will have the ability to develop
its oil and gas properties in the manner currently contemplated; current or,
where applicable, proposed industry conditions, laws and regulations will
continue in effect or as anticipated as described herein; that the estimates of
Parex' reserves volumes and the assumptions related thereto (including commodity
prices and development costs) are accurate in all material respects; that Parex
will be able to obtain contract extensions or fulfill the contractual
obligations required to retain its rights to explore, develop and exploit any of
its undeveloped properties; and other matters.


Management has included the above summary of assumptions and risks related to
forward-looking information provided in this document in order to provide
shareholders with a more complete perspective on Parex' current and future
operations and such information may not be appropriate for other purposes.
Parex' actual results, performance or achievement could differ materially from
those expressed in, or implied by, these forward-looking statements and,
accordingly, no assurance can be given that any of the events anticipated by the
forward-looking statements will transpire or occur, or if any of them do, what
benefits Parex will derive. These forward-looking statements are made as of the
date of this document and Parex disclaims any intent or obligation to update
publicly any forward-looking statements, whether as a result of new information,
future events or results or otherwise, other than as required by applicable
securities laws.


Neither the TSX nor its Regulation Services Provider (as that term is defined in
the policies of the TSX) accepts responsibility for the adequacy or accuracy of
this release.


FOR FURTHER INFORMATION PLEASE CONTACT: 
Mike Kruchten
Vice President, Investor Relations
Parex Resources Inc.
Phone: (403) 517-1733
Investor.relations@parexresources.com

Parex Resources (TSX:PXT)
Historical Stock Chart
Von Mai 2024 bis Jun 2024 Click Here for more Parex Resources Charts.
Parex Resources (TSX:PXT)
Historical Stock Chart
Von Jun 2023 bis Jun 2024 Click Here for more Parex Resources Charts.