14 May 2024
BWA
Group PLC
("BWA",
the "Group",
or the "Company")
(AQSE: BWAP)
Granting
of Additional Claims at the Winterhouse Project
Kings
of the North ("KOTN"), Quebec,
Canada
BWA Group
Plc [AQSE: BWAP], which has mineral exploration licences in both
Cameroon and Canada and is quoted on London's AQSE Growth Market, provides an
update on its 27 new claims, largely contiguous to the prospective
Winterhouse gold project, part of the wholly owned KOTN licence
group, Quebec, Canada
("Winterhouse"
or the "Winterhouse
Project").
The
Winterhouse gold property can be found at the eastern edge of the
Archean Opatica Geological Sub-Province, located in the
northeastern region of Quebec,
Canada. The property itself, is situated around 95 km west
of Fermont (Figure 1) and 385 km
north of Baie-Comeau. The
Winterhouse licence group now consists of 90 claims totalling 4,703
hectares (47 km2)
(Figures 1 and 2).
The
licence area is highly prospective for Archean greenstone-hosted
gold and base metals, with several gold anomalies within, and
high-grade occurrences and good drill intersections from Stelmine's
Courcy project, contiguously to the south and west of the property
(Figures 2, 3 and 4).
A full
illustrated version of this announcement, including maps and
figures can be accessed via the PDF link below.
Summary
KOTN have
increased their landholding across prospective terrains at their
Winterhouse licence group by the recent granting of 27 new claims
for an additional 14 km2.
The mixture of contiguous and non-contiguous claims now totals 90
claims for 47 km2
and
surrounds the existing landholding. Furthermore, they are between
and adjacent to Stelmine's Courcy project claims, which border the
Winterhouse property (Figure 2).
Significant
historic gold values have been reported at Winterhouse and these
vary from 0.1 to 1.7 g/t Au from 12 rock samples taken on two main
gold areas located each on different large geophysical anomalies,
located in the northern half part of the property (Figure 3). The
adjacent Stelmine property has numerous rock samples with a high of
24.8 g/t Au and 1.2% Cu (2017) taken on a similar N-S trending 2.5
km2
mineralised
zone (Figures 3 and 4).
BWA look
forward to incorporating these additional claims in preparation for
the regional exploration programmes for the Winterhouse licence
group, planned for the 2024 field season.
James Butterfield, Managing Director of BWA,
commented:
"We
are pleased to announce that we have been granted 27 additional
claims, which will enable us to explore new areas in the
prospective Opatica Subprovince. We are delighted with the ongoing
support and confidence shown in BWA by the Quebec Mines department,
and we eagerly anticipate exploring the new opportunities that
these claims will provide us with."
Geology
and Geological Interpretation
The
property is within the Archean Superior Province and the eastern
part of volcano-plutonic rocks of the Opatica geological
sub-province and located around 8 km south of the metasedimentary
rocks of the Opinaca sub-province which hosted Newmont's Eleonore
gold mine in La Grande Rivière region of James Bay (3.8 million ounces Au) and 11 km
north of the front of Proterozoic Grenville province.
The
Opatica sub-province has hosted several past-producing gold mines
such as Lac Troilus (produced 67.8 mt @ 1.06 g/t Au) and
Eastmain mine (produced 0.94 mt @
9.99 g/t Au) within volcano-plutonic rocks, as well as numerous
gold occurrences, published online at the Sigeom website (Natural
Energy and Resources of Québec).
Within the
Winterhouse licence area, three geological formations have been
previously observed: 1) pillowed metabasalt and banded metachert of
the Soulard formation; 2) andesitic metavolcanic and
metapyroclastic rocks, as well as felsic rocks such as rhyolite
flows and meta exhalite with silicate and sulphide facies of the
banded iron formation intruded by gabbro-diorite sills of the
Courcy formation; (3) hornblende-biotite-bearing leucotonalite,
locally pegmatitic, of the Atticoupi formation. Other geological
units are recognised in the area, such as biotite-garnet-bearing
paragneiss, metasandstone, conglomerate, peridotite and pyroxenite
intrusions.
Competent
Person's Statement
The
information in this report, which relates to the KOTN (BWA)
Winterhouse Project is based upon, and fairly represents
information collected and compiled by Mr Lewis Harvey, MSc., Principal Consulting
Geologist for Addison Mining Services, who is a Member of the
Australian Institute of Geoscientists.
The
results were reviewed by Mr J.N.
Hogg, MSc. MAIG, Principal Geologist and CEO for Addison
Mining Services and Non-executive Director of KOTN.
Mr
Harvey and Mr Hogg have sufficient experience relevant to the style
of mineralisation, the type of deposit under consideration and to
the activity undertaken to qualify as a Competent Person as defined
in the JORC Code 2012 edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore
Reserves.
Mr
Harvey and Mr Hogg have reviewed and verified the technical
information that forms the basis of and has been used in the
preparation of this announcement, including all sampling and
analytical data, and analytical techniques where applicable. Mr
Harvey and Mr Hogg consent to the inclusion in this announcement of
the matters based on the information, in the form and context in
which it appears.
Forward-Looking
Statement
This
announcement contains forward-looking statements which involve a
number of risks and uncertainties. These forward-looking statements
are expressed in good faith and believed to have a reasonable
basis. These statements reflect current expectations, intentions or
strategies regarding the future and assumptions based on currently
available information. Should one or more of the risks or
uncertainties materialise, or should underlying assumptions prove
incorrect, actual results may vary from the expectations,
intentions and strategies described in this
announcement.
No
obligation is assumed to update forward-looking statements if these
beliefs, opinions and estimates should change or to reflect other
future developments.
or
contact:
BWA
Group PLC
James
Butterfield
Managing
Director
|
+44
(0)7770 225253
enquiries@bwagroupplc.com
|
Jonathan
Wearing
Chairman
|
|
Allenby
Capital Limited
Corporate
Adviser
Nick
Harris/Lauren Wright
|
+44 (0)20
3328 5656
|