Cartier Resources Inc. (TSX VENTURE:ECR) ("Cartier") announces drill results
from two of the five-hole program aimed at evaluating the gold-bearing potential
below the Pusticamica Gold Deposit, on the Benoist property. The first drill
hole returned an intersection of 10.3 g/t Au over 5.0 meters. 


"These drill results reward our perseverance", commented Philippe Cloutier,
President and CEO, "to date all of the holes have intersected the targeted
mineralization-alteration zone below the deposit". The holes three and four are
completed and samples were sent to the lab for assaying. The final hole of the
program is presently in progress.




Table of Drill Results                                                      
----------------------------------------------------------------------------
Drill Hole      From        To  Length(i)  Gold (Au) Silver (Ag) Copper (Cu)
          ------------------------------------------------------------------
                 (m)       (m)        (m)      (g/t)       (g/t)         (%)
----------------------------------------------------------------------------
----------------------------------------------------------------------------
PU-14-09       334.0     387.0       53.0        2.4     Pending     Pending
----------------------------------------------------------------------------
including      334.0     338.0        4.0        3.3     Pending     Pending
----------------------------------------------------------------------------
including      345.0     350.0        5.0       10.3     Pending     Pending
----------------------------------------------------------------------------
including      347.0     350.0        3.0       14.2     Pending     Pending
----------------------------------------------------------------------------
including      365.0     372.0        7.0        3.3     Pending     Pending
----------------------------------------------------------------------------
including      381.0     386.0        5.0        2.8     Pending     Pending
----------------------------------------------------------------------------
----------------------------------------------------------------------------
PU-14-10       430.0     458.0       28.0        0.3     Pending     Pending
----------------------------------------------------------------------------
(i) Reported intersections are measured along the hole. Additional drilling 
required to determine the true thickness of the zones.                      



The Benoist property is 65 km northeast of the town of Lebel-sur-Quevillon, 25
km south-east of the Bachelor mine and 25 km north-west of the Langlois mine.


About Cartier

The company's objective is to develop and maintain a balanced portfolio of
mining projects ranging from exploration to resource definition, development and
production. Its VISION is to develop the company's current and future assets
into mineral production within a timeframe that is consistent with its human and
financial resources while respecting sustainable development practices.


Quality Assurance / Quality Control

The scientific and/or technical information presented in this press release has
been reviewed and approved by Mr. Gaetan Lavalliere, P. Geo., and Vice President
for Cartier. Mr. Lavalliere is a qualified person as defined by National
Instrument 43-101.


Neither the TSX Venture Exchange nor its regulatory services provider accepts
responsibility for the adequacy or accuracy of this press release.


FOR FURTHER INFORMATION PLEASE CONTACT: 
Philippe Cloutier
President and CEO
Cartier Resources Inc.
819 856-0512
info@ressourcescartier.com
www.ressourcescartier.com

Cartier Resources (TSXV:ECR)
Historical Stock Chart
Von Mai 2024 bis Jun 2024 Click Here for more Cartier Resources Charts.
Cartier Resources (TSXV:ECR)
Historical Stock Chart
Von Jun 2023 bis Jun 2024 Click Here for more Cartier Resources Charts.