African Gold Group, Inc., ("AGG" or the "Company") (TSX VENTURE:AGG) is pleased
to report the analytical results for the first 50 bulk metallurgical test
samples that were comprised of composites of reverse circulation ("RC") drill
intervals that were specifically selected to emulate the Kobada deposit, from
surface down through to fresh bedrock.


Each bulk sample consisted of drill cuttings from one or more RC drill holes,
within a specific horizon or layer of mineralization emanating from drill
intervals that ranged between 30 to 50 meters in length and weighed between 0.8
up to 1.5 metric tonnes.


HIGHLIGHTS



--  Average calculated gold grades of the 50 individual bulk composite
    samples, processed through the gravimetric pilot plant, yielded gold
    grades 65% higher than the average given gold grade, based on 2 kg
    Leachwell analysis, from the identical drill interval. 
    
--  28 of the 50 bulk composite samples were classified as waste, averaging
    0.085 g/t Au, based on 2 kg leachwell analysis, of the drilled
    interval(s). The calculated average grade of the bulk samples processed
    through the gravimetric pilot plant, for the identical drill
    interval(s), averaged 0.299 g/t Au, representing a 252% increase in gold
    content from the identical drill interval(s). 
    
--  Pilot plant test results continue to confirm that increasing "sample
    support" (volume of material) and "aliquot" (the actual amount of
    material analyzed) is highly beneficial for improving the overall grade
    of mineralization of the Kobada deposit, a characteristic of the "nugget
    effect." 
    
--  Pilot plant test results continue to confirm that a Bulk Mining model
    applies to Kobada and that all material contained within the
    (mineralized) structural corridor is envisioned to be processed through
    a gravimetric gold recovery plant - including material that is defined
    as waste, based on drill sample support and Leachwell analysis. 
    



Table 1 Illustrates the analytical results for the calculated gold grade based
on processing the individual composite bulk samples through the onsite Pilot
Plant; the comparative average analytical results from RC drilling for the
identical drill interval(s), based on 2 kg leachwell analysis and the ratio of
the Pilot Plant calculated grade relative to the given grade, based on 2 kg
leachwell analysis, for RC drilling over the identical drill interval.




TABLE 1                                                                     
                                                                            
----------------------------------------------------------------------------
                         Given Grade:     Calculated Grade:           Ratio:
                     Lab Results From              Based On      Pilot Plant
                 RC Drilling Based On       Processing Bulk      Analysis/RC
Bulk Sample            2 KG Leachwell    Samples Thru Pilot         Drilling
Composite ID        Analysis (g/t Au)        Plant (g/t Au)         Analysis
----------------------------------------------------------------------------
KBPP12-081                      0.026                 0.085              3.3
----------------------------------------------------------------------------
KBPP12-079                       0.01                 0.071              7.1
----------------------------------------------------------------------------
KBPP12-112                      0.028                 0.082              2.9
----------------------------------------------------------------------------
KBPP12-103                      0.439                 5.090             11.6
----------------------------------------------------------------------------
KBPP12-111                      0.496                 0.873              1.8
----------------------------------------------------------------------------
KBPP12-091                      0.223                 0.896              4.0
----------------------------------------------------------------------------
KBPP12-063                      0.032                 0.122              3.8
----------------------------------------------------------------------------
KBPP12-008                      1.103                 1.375              1.2
----------------------------------------------------------------------------
KBPP12-047                      0.451                 1.326              2.9
----------------------------------------------------------------------------
KBPP12-044                       0.54                 0.493              0.9
----------------------------------------------------------------------------
KBPP12-048                      1.431                 2.348              1.6
----------------------------------------------------------------------------
KBPP12-037                      0.012                 0.196             16.3
----------------------------------------------------------------------------
KBPP12-045                      0.156                 0.681              4.4
----------------------------------------------------------------------------
KBPP12-014                       0.04                 0.080              2.0
----------------------------------------------------------------------------
KBPP12-046                      0.101                 0.214              2.1
----------------------------------------------------------------------------
KBPP12-069                      0.488                 0.684              1.4
----------------------------------------------------------------------------
KBPP12-108                      0.038                 0.124              3.3
----------------------------------------------------------------------------
KBPP12-086                      0.212                 0.228              1.1
----------------------------------------------------------------------------
KBPP12-061                      0.018                 0.298             16.5
----------------------------------------------------------------------------
KBPP12-109 (1)                  0.096                 0.360              3.7
----------------------------------------------------------------------------
KBPP12-121                      0.782                 0.220              0.3
----------------------------------------------------------------------------
KBPP12-089                      0.378                 0.406              1.1
----------------------------------------------------------------------------
KBPP12-092                      0.798                 0.532              0.7
----------------------------------------------------------------------------
KBPP12-095                      0.488                 0.746              1.5
----------------------------------------------------------------------------
KBPP12-059                      0.017                 0.446             26.3
----------------------------------------------------------------------------
KBPP12-065                      0.361                 0.416              1.2
----------------------------------------------------------------------------
KBPP12-094                      0.624                 0.754              1.2
----------------------------------------------------------------------------
KBPP12-072                      3.314                 0.873              0.3
----------------------------------------------------------------------------
KBPP12-090                      0.144                 0.243              1.7
----------------------------------------------------------------------------
KBPP12-006                      0.967                 0.465              0.5
----------------------------------------------------------------------------
KBPP12-027                      0.388                 0.615              1.6
----------------------------------------------------------------------------
KBPP12-023                      0.187                 0.737              3.9
----------------------------------------------------------------------------
KBPP12-085                      0.436                 0.390              0.9
----------------------------------------------------------------------------
KBPP12-106                      0.113                 0.631              5.6
----------------------------------------------------------------------------
KBPP12-018                      0.096                 0.065              0.7
----------------------------------------------------------------------------
KBPP12-028                      0.039                 0.311              8.0
----------------------------------------------------------------------------
KBPP12-062                      0.026                 0.541             20.8
----------------------------------------------------------------------------
KBPP12-002                      0.134                 0.288              2.1
----------------------------------------------------------------------------
KBPP12-142                      0.504                 0.581              1.2
----------------------------------------------------------------------------
KBPP12-146                      0.022                 0.072              3.3
----------------------------------------------------------------------------
KBPP12-124                      0.637                 0.699              1.1
----------------------------------------------------------------------------
KBPP12-128                      0.036                 0.069              1.9
----------------------------------------------------------------------------
KBPP12-138                       0.19                 0.355              1.9
----------------------------------------------------------------------------
KBPP12-153                      0.072                 0.159              2.2
----------------------------------------------------------------------------
KBPP12-104                      0.091                 0.155              1.7
----------------------------------------------------------------------------
KBPP12-154                      0.051                 0.564             11.1
----------------------------------------------------------------------------
KBPP12-152                      0.171                 0.296              1.7
----------------------------------------------------------------------------
KBPP12-113                      0.384                 0.510              1.3
----------------------------------------------------------------------------
KBPP12-125                      0.364                 0.991              2.7
----------------------------------------------------------------------------
KBPP12-126                       0.57                 1.635              2.9
----------------------------------------------------------------------------



Figure 1 represents a graphic depiction of the results contained in Table 1
above. To view Figure 1, please visit the following link:
http://media3.marketwire.com/docs/agg_figure_01_feb11.pdf


"We are extremely pleased with the test results from this first batch of 50 bulk
composite samples. Essentially, these test results exceeded our expectations by
generating a 65% increase in reported gold grade from the identical drill
interval(s). These results re-confirm that increasing sample support and aliquot
size is highly beneficial for demonstrating the potential of improving the
overall grade of mineralization of the Kobada deposit. All of which validates
our investment in our onsite gravimetric pilot plant and the viability of our
proposed Bulk Mining model for Kobada. In light of these highly positive
results, AGG plans the initiation of another round of pilot plant tests, to
commence in April. These tests will concentrate our efforts on near surface
material, more specifically, the first 30 vertical meters from surface, which is
comprised of a nearly equal proportion of lateritic hardpan overlying saprolite.
Interestingly, we observe lab analysis of drill intervals from within this
hardpan zone average less than the 0.3 g/t Au cut-off of AGG's 2013 resources
update, while at the same time, this very same material has proven to be the
preferred material for artisanal or local miners. We hypothesize that this first
10 meters of the Kobada deposit, containing the lateritic hardpan, is
potentially significantly understated, based on 2 kg lab analysis of drill
intervals. Our goal is to determine that much larger bulk samples, up to 10
tonnes in weight, could produce much higher gold grades, within the hardpan
zone, relative to results derived from 2 kg leachwell of drill intervals,"
states AGG Director, Pierre Lalande, P.Geo.


The Nugget Effect

"On a technical note, a characteristic of the Kobada deposit is the significant
amount of coarse gold that is contained within the deposit and surrounding
environment. When one considers the extent of artisanal gold diggings,
throughout Kobada, plus our preliminary metallurgical studies and the
comparative results derived from our QA/QC programs, that form part of our drill
campaigns dating back to 2005, one can conclude the collective evidence
highlights the large statistical "nugget effect". It is important to increase
both the "sample support" (volume of material) and "aliquot" (amount of material
actually analyzed) to counteract the "nugget effect" at Kobada. Since 2009, AGG
commenced both a higher grid density of drilling with larger diameter holes and
employed analytical procedures using larger amounts of material subjected to
analysis (Leachwell on 2,000 g versus Fire Assay on 50 g). Our 2012 Feasibility
Study drill program increased drill density to 25 meter centers from the 50
meter centers (reported in 2011). All drill analysis was based on 2,000 g
Leachwell and it is this protocol combination that has resulted in AGG reporting
a 10% increase in gold grade, relative to our 2011 resource estimate," states
AGG President, Michael A. Nikiforuk.


The analytical test results for the remaining balance of the composite bulk
samples will be reported upon receipt of lab analytical results.


Sampling Protocol

Representative samples of the feed material, plant screen oversize and tails and
entire concentrates were sent for analysis to Activation Laboratories by
100-mesh metallics screened fire assay on 1000-g aliquot. One sample in 20 was
further analyzed by Leachwell on 2,000-g aliquot as part of the QA/QC program.


Qualified Persons

The bulk metallurgical testing program was executed under the supervision of Mr.
Florent Baril, P. Eng., Metallurgical Engineer. Mr. Baril is the CEO of Bumigeme
Inc., a consulting engineering group, located in Montreal, Canada. Mr. Baril is
a Qualified Persons under National Instrument 43-101 and has approved the
technical information contained in this release.


Updated Resource Estimate Highlights (June 18, 2013)



--  2,306,000 Oz Au Measured and Indicated resources (contained within 80.61
    million tonnes at 0.87 g/t Au using a 0.3 g/t Au cutoff) derived from
    drilling on 25m x 25m centers over a total of 3,200 meters of strike
    length between sections 600S and 3,800S, representing an 88% increase in
    infill drilled strike length relative to the 1,700 meters of strike
    length reported in the 2011 Inferred resource estimate. 
    
--  542,000 Oz Au Inferred Resource (contained within 17.88 million tonnes
    at 0.94 g/t Au, using a 0.3 g/t Au cutoff), predominantly contained from
    within the Sulphide portion of Zone 1. Included, 186,000 Inferred ounces
    reported for the Foroko North Deposit (5.16 million tonnes at 1.13 g/t
    Au at a 0.3 g/t Au cutoff). Foroko North is a satellite deposit situated
    on a separate and distinct structure from Zone 1. It represents one of
    seven airborne geophysical targets generated by the 2010 airborne
    survey. 
    
--  Average grade of 0.87 g/t Au reported in the updated resources estimate
    represents a 10% increase in grade as compared to the average grade of
    0.79 g/t Au reported in the 2011 resource estimate that formed part of
    AGG's PEA.  
    
--  Further potential remains to significantly increase both the oxide and
    sulphide resources along strike and at depth for both Kobada, Zone 1 and
    Foroko North deposits and elsewhere on the 215 sq km concession where
    airborne geophysical and geochemical anomalies coincide with extensive
    areas of gold diggings. 
    



Please activate the link to view the complete press release detailing AGG's
updated resource estimate, published June 18, 2013:

http://www.africangoldgroup.com/index.php?option=com_content&view=article&id=311:african-gold-group-inc-updated-resources-estimate-for-kobada-gold-project-surges-to-23-million-oz-au-measured-a-indicated-a-540000-oz-au-inferred-gold-grade-increases-10-to-087-gt-au&catid=66:2013&Itemid=189



African Gold Group, Inc., based in Toronto, Canada, is focused on putting its
Kobada, Mali gold project into production. 


Additional Information is available on the Company's website at
www.africangoldgroup.com and on www.sedar.com and through the Company's offices
at: Sun Life Financial Tower, Suite 2518, 150 King St. West, Toronto, Canada M5H
1J9.


On Behalf of the Board: 

Michael A. J. Nikiforuk, President, Director

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that
term is defined in the policies of the TSX Venture Exchange) accepts
responsibility for the adequacy or accuracy of this release.


FOR FURTHER INFORMATION PLEASE CONTACT: 
African Gold Group, Inc.
Michael A. J. Nikiforuk
(647) 288-0453
majn@africangoldgroup.com
www.africangoldgroup.com

African Gold (TSXV:AGG)
Historical Stock Chart
Von Mai 2024 bis Jun 2024 Click Here for more African Gold Charts.
African Gold (TSXV:AGG)
Historical Stock Chart
Von Jun 2023 bis Jun 2024 Click Here for more African Gold Charts.