Capstone Mining Corp. (“Capstone” or the “Company”) (TSX:CS) is
pleased to announce that it has entered into an 18-month access
agreement to conduct drill and metallurgical test work at BHP
Copper Inc.’s (“BHP”) Copper Cities project (“Copper Cities”)
located 10 km east of the Pinto Valley Mine (“Pinto Valley”).
This press release features multimedia. View
the full release here:
https://www.businesswire.com/news/home/20220120005417/en/
Figure 1 – Pinto Valley District Map,
Pinto Valley and Carlota are the only producing mines in the
District (Photo: Business Wire)
Darren Pylot, Capstone’s CEO commented, “I am excited that we
have started test work on a property neighbouring our flagship
Pinto Valley operation.” Mr. Pylot added, “Historic drill data from
over 300 holes suggest a shallow copper target and a potentially
low strip ratio pointing to a significant development
opportunity.”
Brad Mercer, Capstone’s SVP Strategic Projects and Exploration
said, “We believe Copper Cities is geologically a mirror image of
Pinto Valley with the same host rocks and age. Our plan currently
underway calls for a $6.7 million two phase drill program aimed at
twinning historical drill holes and to select a portion of these
for metallurgical testing. Discussions between Capstone and BHP are
at an early stage.”
About Copper Cities Project
Copper Cities was developed in the 1950s as a part of America’s
national effort to increase copper production to support the war
effort in Korea. The operations included open pit mining,
concentrating and leaching of copper ores. The mining and milling
concluded in 1978 while leaching continued until 1982 when the site
closed. Over the mine life according to USGS records, a total of
68.7 million tonnes of ore was milled at an estimated feed grade of
approximately 0.66% with production of 895 million pounds of copper
including 75 million pounds of copper cathode.
ABOUT CAPSTONE MINING CORP.
On November 30, 2021, Capstone Mining and Mantos Copper
announced that they have entered into a definitive agreement to
combine pursuant to a plan of arrangement under the Business
Corporations Act (British Columbia). Upon completion of the
Transaction, the new Company would be renamed Capstone Copper Corp.
(Capstone Copper).
Capstone Mining Corp. is a Canadian base metals mining company,
focused on copper. We are committed to the responsible development
of our assets and the environments in which we operate. Our two
producing mines are the Pinto Valley copper mine located in
Arizona, US and the Cozamin copper-silver mine in Zacatecas State,
Mexico. In addition, Capstone owns 100% of Santo Domingo, a large
scale, fully permitted, copper-iron-gold project in Region III,
Chile, as well as a portfolio of exploration properties. Capstone's
strategy is to focus on the optimization of operations and assets
in politically stable, mining-friendly regions, centred in the
Americas. Our headquarters are in Vancouver, Canada and we are
listed on the Toronto Stock Exchange (TSX) under the symbol CS.
Further information is available at www.capstonemining.com.
CAUTIONARY NOTE REGARDING FORWARD-LOOKING INFORMATION
This document may contain “forward-looking information” within
the meaning of Canadian securities legislation and “forward-looking
statements” within the meaning of the United States Private
Securities Litigation Reform Act of 1995 (collectively,
“forward-looking statements”). These forward-looking statements are
made as of the date of this document and the Company does not
intend, and does not assume any obligation, to update these
forward-looking statements, except as required under applicable
securities legislation.
Forward-looking statements relate to future events or future
performance and reflect our expectations or beliefs regarding
future events and the impacts of the ongoing and evolving COVID-19
pandemic. Forward-looking statements include, but are not limited
to, statements with respect to the estimation of Mineral Resources
and Mineral Reserves, the timing and success of our use of the
Jetti Technology, the expected timing of a purchase agreement and
43-101 report for Copper Cities, the anticipated low strip ratio,
the development potential of Copper Cities including the expected
geological make-up, the timing and success of exploration under the
Copper Cities Access Agreement, the timing and amount of estimated
future production, costs of production and capital expenditures and
reclamation, the success of our mining operations, the success of
mineral exploration, the estimations for potential quantities and
grade of inferred resources and exploration targets, Capstone’s
ability to fund future exploration activities, Capstone’s ability
to finance the Santo Domingo project, Capstone's ability to find a
strategic partner, environmental risks, unanticipated reclamation
expenses and title disputes. The potential effects of the COVID-19
pandemic on our business and operations are unknown at this time,
including Capstone’s ability to manage challenges and restrictions
arising from COVID-19 in the communities in which Capstone operates
and our ability to continue to safely operate and to safely return
our business to normal operations. The impact of COVID-19 to
Capstone is dependent on a number of factors outside of our control
and knowledge, including the effectiveness of the measures taken by
public health and governmental authorities to combat the spread of
the disease, global economic uncertainties and outlook due to the
disease, and the evolving restrictions relating to mining
activities and to travel in certain jurisdictions in which we
operate.
In certain cases, forward-looking statements can be identified
by the use of words such as “anticipates”, “approximately”,
“believes”, “budget”, “estimates”, expects”, “forecasts”,
“guidance”, intends”, “plans”, “scheduled”, “target”, or variations
of such words and phrases, or statements that certain actions,
events or results “be achieved”, “could”, “may”, “might”, “occur”,
“should”, “will be taken” or “would” or the negative of these terms
or comparable terminology. In this document certain forward-looking
statements are identified by words including “anticipated”,
“expected”, “guidance” and “plan”. By their very nature,
forward-looking statements involve known and unknown risks,
uncertainties and other factors that may cause our actual results,
performance or achievements to be materially different from any
future results, performance or achievements expressed or implied by
the forward-looking statements. Such factors include, amongst
others, risks related to inherent hazards associated with mining
operations and closure of mining projects, future prices of copper
and other metals, compliance with financial covenants, surety
bonding, our ability to raise capital, Capstone’s ability to
acquire properties for growth, counterparty risks associated with
sales of our metals, use of financial derivative instruments and
associated counterparty risks, foreign currency exchange rate
fluctuations, market access restrictions or tariffs, changes in
general economic conditions, availability of water, accuracy of
Mineral Resource and Mineral Reserve estimates, operating in
foreign jurisdictions with risk of changes to governmental
regulation, compliance with governmental regulations, compliance
with environmental laws and regulations, reliance on approvals,
licenses and permits from governmental authorities and potential
legal challenges to permit applications, contractual risks
including but not limited to, our ability to meet the completion
test requirements under the Cozamin Silver Stream Agreement with
Wheaton Precious Metals, our ability to meet certain closing
conditions under the Santo Domingo Gold Stream Agreement with
Wheaton Precious Metals, acting as Indemnitor for Minto Exploration
Ltd.’s surety bond obligations post divestiture, impact of climate
change and changes to climatic conditions at our Pinto Valley and
Cozamin operations and Santo Domingo project, changes in regulatory
requirements and policy related to climate change and greenhouse
gas ("GHG") emissions, land reclamation and mine closure
obligations, risks relating to widespread epidemics or pandemic
outbreak including the COVID-19 pandemic; the impact of COVID-19 on
our workforce, suppliers and other essential resources and what
effect those impacts, if they occur, would have on our business,
including our ability to access goods and supplies, the ability to
transport our products and impacts on employee productivity, the
risks in connection with the operations, cash flow and results of
Capstone relating to the unknown duration and impact of the
COVID-19 pandemic, uncertainties and risks related to the potential
development of the Santo Domingo project, increased operating and
capital costs, increased cost of reclamation, challenges to title
to our mineral properties, increased taxes in jurisdictions the
Company operates or is subject to tax, changes in tax regimes we
are subject to and any changes in law or interpretation of law may
be difficult to react to in an efficient manner, maintaining
ongoing social license to operate, dependence on key management
personnel, potential conflicts of interest involving our directors
and officers, corruption and bribery, limitations inherent in our
insurance coverage, labour relations, increasing energy prices,
competition in the mining industry including but not limited to
competition for skilled labour, risks associated with joint venture
partners, our ability to integrate new acquisitions and new
technology into our operations, cybersecurity threats, legal
proceedings, the volatility of the price of the Common Shares, the
uncertainty of maintaining a liquid trading market for the Common
Shares, risks related to dilution to existing shareholders if stock
options or other convertible securities are exercised, the history
of Capstone with respect to not paying dividends and anticipation
of not paying dividends in the foreseeable future, and sales of
Common Shares by existing shareholders can reduce trading prices,
and other risks of the mining industry as well as those factors
detailed from time to time in the Company’s interim and annual
financial statements and MD&A of those statements and Annual
Information Form, all of which are filed and available for review
under the Company’s profile on SEDAR at www.sedar.com. Although the
Company has attempted to identify important factors that could
cause our actual results, performance or achievements to differ
materially from those described in our forward-looking statements,
there may be other factors that cause our results, performance or
achievements not to be as anticipated, estimated or intended. There
can be no assurance that our forward-looking statements will prove
to be accurate, as our actual results, performance or achievements
could differ materially from those anticipated in such statements.
Accordingly, readers should not place undue reliance on our
forward-looking statements.
CAUTIONARY NOTE TO UNITED STATES INVESTORS REGARDING
PRESENTATION OF MINERAL RESERVE AND MINERAL RESOURCE
ESTIMATES
As a British Columbia corporation and a “reporting issuer” under
Canadian securities laws, we are required to provide disclosure
regarding our mineral properties in accordance with Canadian
National Instrument 43-101 – Standards of Disclosure for Mineral
Projects (“NI 43-101”). NI 43-101 is a rule developed by the
Canadian Securities Administrators that establishes standards for
all public disclosure an issuer makes of scientific and technical
information concerning mineral projects. In accordance with NI
43-101, we use the terms mineral reserves and resources as they are
defined in accordance with the CIM Definition Standards on mineral
reserves and resources (the “CIM Definition Standards”) adopted by
the Canadian Institute of Mining, Metallurgy and Petroleum. In
particular, the terms “mineral reserve”, “proven mineral reserve”,
“probable mineral reserve”, “mineral resource”, “measured mineral
resource”, “indicated mineral resource” and “inferred mineral
resource” used in this news release and the documents incorporated
by reference herein and therein, are Canadian mining terms defined
in accordance with CIM Definition Standards. These definitions
differ from the definitions in the disclosure requirements
promulgated by the SEC. Accordingly, information contained in this
news release and the documents incorporated by reference herein may
not be comparable to similar information made public by U.S.
companies reporting pursuant to SEC disclosure requirements.
United States investors are also cautioned that while the SEC
will now recognize “measured mineral resources”, “indicated mineral
resources” and “inferred mineral resources”, investors should not
assume that any part or all of the mineralization in these
categories will ever be converted into a higher category of mineral
resources or into mineral reserves. Mineralization described using
these terms has a greater amount of uncertainty as to their
existence and feasibility than mineralization that has been
characterized as reserves. Accordingly, investors are cautioned not
to assume that any “measured mineral resources”, “indicated mineral
resources”, or “inferred mineral resources” that we report are or
will be economically or legally mineable. Further, “inferred
resources” have a greater amount of uncertainty as to their
existence and as to whether they can be mined legally or
economically. Therefore, United States investors are also cautioned
not to assume that all or any part of the inferred resources exist.
In accordance with Canadian rules, estimates of “inferred mineral
resources” cannot form the basis of feasibility or other economic
studies, except in limited circumstances where permitted under NI
43-101.
NATIONAL INSTRUMENT 43-101 COMPLIANCE
Unless otherwise indicated, Capstone has prepared the technical
information in this news release (“Technical Information”) based on
information contained in the technical reports, Annual Information
Form and news releases (collectively the “Disclosure Documents”)
available under Capstone Mining Corp.’s company profile on SEDAR at
www.sedar.com. Each Disclosure Document was prepared by or under
the supervision of a qualified person (a “Qualified Person”) as
defined in National Instrument 43-101 – Standards of Disclosure for
Mineral Projects of the Canadian Securities Administrators (“NI
43-101”). Readers are encouraged to review the full text of the
Disclosure Documents which qualifies the Technical Information.
Readers are advised that Mineral Resources that are not Mineral
Reserves do not have demonstrated economic viability. The
Disclosure Documents are each intended to be read as a whole, and
sections should not be read or relied upon out of context. The
Technical Information is subject to the assumptions and
qualifications contained in the Disclosure Documents.
Disclosure Documents include the National Instrument 43-101
compliant technical reports titled "NI 43-101 Technical Report on
the Cozamin Mine, Zacatecas, Mexico" effective October 23, 2020,
“NI 43-101 Technical Report on the Pinto Valley Mine, Arizona, USA”
effective March 31, 2021 and “Santo Domingo Project, Region III,
Chile, NI 43-101 Technical Report” effective February 19, 2020.
The disclosure of Scientific and Technical Information in this
news release was reviewed and approved by Brad Mercer, P. Geol.,
SVP Strategic Projects and Exploration (technical information
related to mineral exploration activities and to Mineral Resources
at Cozamin), Clay Craig, P.Eng, Manager, Mining & Evaluations
(technical information related to Mineral Reserves and Mineral
Resources at Pinto Valley), Tucker Jensen, Superintendent Mine
Operations, P.Eng (technical information related to Mineral
Reserves at Cozamin) and Albert Garcia III, PE, Vice President,
Projects (technical information related to project updates at Santo
Domingo) all Qualified Persons under NI 43-101.
View source
version on businesswire.com: https://www.businesswire.com/news/home/20220120005417/en/
Jerrold Annett, SVP, Strategy and Capital Markets 647-273-7351
jannett@capstonemining.com
Kettina Cordero, Director, Investor Relations and Communications
604-262-9794 kcordero@capstonemining.com
Capstone Copper (TSX:CS)
Historical Stock Chart
Von Dez 2024 bis Jan 2025
Capstone Copper (TSX:CS)
Historical Stock Chart
Von Jan 2024 bis Jan 2025