Gran Colombia Gold Corp. (TSX: GCM, OTCQX: TPRFF) (“Gran Colombia”
or the “Company”) announced today multiple high-grade intercepts
from the latest 62 diamond drill holes, totaling 13,056 meters,
from the 2021 in-mine and near-mine drilling programs and a further
11 diamond drill holes, totaling 3,190 meters, from the 2021
brownfield drilling programs at its Segovia Operations. The Company
also announced the assay results from four additional kick-off
diamond drill holes (2,319 meters) from the ongoing directional
drilling program at the El Silencio Deep Zone.
Significant high-grade intercepts from the
latest drill results include:
In-mine
- Providencia: 211.68 g/t Au and
253.6 g/t Ag over 0.33 meters on the Providencia Vein
(PV-ES-008);
- Sandra K: 147.91 g/t Au and 194.8
g/t Ag over 0.74 meters on the Sandra K Techo Hanging Wall Vein
(SK-IU-175);
- Sandra K: 85.56 g/t Au and 262.1
g/t Ag over 1.32 meters on the Sandra K Techo Vein
(SK-IU-169);
- Chumeca: 187.11 g/t Au and 242.2
g/t Ag over 0.43 meters on the Chumeca Hanging Wall Vein
(CH-IU-030);
- El Silencio: 37.16 g/t Au and 52.5
g/t Ag over 0.55 meters on the 450 Vein (ES-MH08-02);
- El Silencio:
23.25 g/t Au and 117.5 g/t Ag over 1.80 meters on the Manto Vein
(ES-MH08-02);
Brownfield
- Vera: 15.39 g/t Au and 3,496.1 g/t
Ag over 0.70 meters on the Lluvias Vein (VER-ES-010); and,
- Marmajito: 123.65 g/t Au and 172.60
Ag over 0.93 meters on the Marmajito Vein (MAR-EU-003).
Serafino Iacono, Executive Chairman of Gran
Colombia, commented, “Our 2021 in-mine and brownfield drilling
programs are continuing to provide us with outstanding results,
which confirm the prowess of our Segovia Operations as a
world-class high-grade vein system. The Sandra K and El Silencio
results continue to impress both in terms of grades and widths and
will undoubtedly lead to an important resource growth coupled with
a greater flexibility for mining. In addition, a further high-grade
result from Vera and an initial high-grade result from the
Marmajito vein are shaping up our ongoing brownfield drilling
campaign, focused on the other 24 known veins we are not currently
mining, as an exciting opportunity to add resources and
consequently mine life."
The ongoing 2021 in-mine and near-mine infill
and step-out drilling campaigns commenced in early January with
four diamond drill rigs operating from purpose-built underground
drill stations and comprise a total of approximately 40,000 meters,
or about 67% of the total drilling program for this year. In and
near-mine in-fill and step-out drilling is focused on replacing the
2021 mining production and organic growth through resource and
reserve expansion at the Company’s core operating mines. The other
33% of the planned drilling campaign for 2021 is focused on
exploration for new resources in the brownfield exploration targets
encompassing the 24 veins within the Segovia mining title that are
not currently in production. It commenced in late 2020 at the Vera
Project with one diamond drill rig operating from purpose-built
surface drill stations. Approximately 33% of the total in-mine and
near-mine drilling program for 2021 and 16% of the brownfield
exploration drilling program was completed by the end of May.
Gran Colombia currently has seven diamond drill
rigs in operation at Segovia, with three rigs carrying out resource
definition on the Sandra K mine from two purpose-built surface
platforms and one underground drill station within the underground
developments of the Sandra K mine; one rig operating from Level 3
of the Sandra K mine targeting the down-plunge extension of the
south ore-shoot of the El Silencio mine; one rig operating from
surface at Providencia exploring the westernmost end of the
Providencia vein system; one rig operating from the deepest
underground developments of the Providencia mine exploring the
down-dip extension of the Marmajito Vein; and one rig operating
from surface at Carla to follow-up the high-grade intercepts
encountered at depth during the last drilling campaign.
Key Highlights
Providencia
Exploration drilling from underground station
PV4940 and surface platform PV4675, installed off the eastern end
of the mine workings, delimited by a main dextral strike-slip
fault, was completed to test the Providencia Vein close to the
fault. Multiple medium to high gold grades were intersected from 13
drill holes (2,929 meters) on an extensional duplex (horsetail
splay) where the main Providencia Vein splays into a complex
tensional array, with maximum intersection grades of 37.33
g/t Au with 24.2 g/t Ag over 0.55 meters on an interpreted
footwall structure of the Providencia Vein (PV-EU-019).
Exploration drilling from surface platform
PV6545, aimed at testing the Providencia Vein west of the F Fault,
was successfully completed. Multiple high gold grades were
intersected in 5 drill holes (2,364 meters) on the main vein system
with maximum intersection grades of 211.68 g/t Au with
253.6 g/t Ag over 0.33 meters on the Providencia Vein
(PV-ES-008). As a result, Gran Colombia will carry out in-fill
drilling in 2021 from a purpose-built underground drill station to
better delineate the sparse high-grade intercepts encountered
during this initial phase of drilling.
Sandra K
In-mine infill drilling from underground station
SK5290, installed off Level 4, has further extend down-plunge, to
approximately future Level 9, an ore-shoot outlined by previous
drilling, which occurs in a block of the Sandra K vein system
delimited by a set of faults striking NE and steeply dipping to the
north. This orebody remains open at depth. Multiple high gold
grades were intersected from 12 drill holes (1,905 meters) on the
main vein system with maximum intersection grades of 147.91
g/t Au with 194.8 g/t Ag over 0.74 meters on the Sandra K
Techo Hanging-wall Vein (SK-IU-175). This new orebody offers the
potential for another phase of resource growth and the high-grade
gold mineralized intercepts encountered so far confirm the
higher-grade mineralization at depth.
The ongoing exploration drilling from surface
platform SK5050, located in the south fault block of the vein
system, is aimed to extend some narrow ore-shoots outlined by
previous surface drilling. Drill hole SK-ES-001 returned
8.88 g/t Au with 4.4 g/t Ag over 0.58 meters on
the Sandra K Techo Vein.
El Silencio Deep Zone
The ongoing directional drilling program on the
El Silencio Deep Zone is targeted to better delineate the southern
ore-shoot down-plunge below Level 40, the deepest level of
historical mining on the Manto Vein by Frontino Gold Mines (“FGM”).
Drilling on the southern ore-shoot continues to be successful in
confirming the high-grade nature of the 450 Vein and the
down-plunge continuity of the two distinct high-grade domains,
previously combined, on the Manto Vein. The 450 Vein, interpreted
as a low angle vein or manto, occurs in the hanging-wall of the
Nacional Vein, some 40 meters vertically above. Multiple high gold
grades were intersected from 4 kick-off holes (2,319 meters) with
maximum intersection grades of 37.16 g/t Au with 52.5 g/t
Ag over 0.55 meters on the 450 Vein (ES-MH08-02) and
70.56 g/t Au with 289.5 g/t Ag over 0.57 meters on
the Manto Vein (ES-MH08-03).
Chumeca
In-mine infill drilling from underground station
CH5110, installed off Level 2, aimed to extend a cluster of
potential ore-shoots outlined by mining within the upper levels of
the past operation, was completed. Multiple medium to high gold
grades were intersected from 20 drill holes (2,041 meters) on the
main vein system, which identified two distinct structures named as
the Chumeca hanging-wall and footwall veins interpreted as a split
of the main Chumeca Vein, with maximum intersection grades of
187.11 g/t Au with 242.2 g/t Ag over 0.43 meters
on the hangingwall structure (CH-IU-030) and 15.90 g/t Au
with 20.5 g/t Ag over 0.56 meters on the footwall
structure (CH-IU-032).
Vera
Exploration drilling from surface station
VER5340 confirmed the continuity of the high-grade gold and silver
mineralization in the upthrown fault block, below the deepest level
of the historical mine. A bonanza silver grade coupled with a high
gold grade was intersected in drill hole VER-ES-010, one of the
latest 7 drill holes (2,140 meters) completed on the main vein
system, with maximum intersection grades of 31.78 g/t Au
with 8,150.00 g/t Ag over 0.30 meters on the Lluvias
Vein.
Marmajito
The ongoing brownfield exploration drilling
program commenced in February 2021 with one diamond drill rig
operating from the underground drill station PV5630, installed off
Level 16 of the Providencia mine. This drilling program is aimed at
exploring the down-dip extension of the historical Marmajito Vein
that was operated by FGM until 2000. FGM developed the mine on 18
levels, the longest (Level 4) being approximately 800 meters.
Historical records of FGM report reserves of 232,000 t grading 18
g/t Au. A qualified person has not done sufficient work to classify
the historical estimate as current mineral resources or mineral
reserves and the Company is not treating the historical estimate as
current mineral resources or mineral reserves. Gold mineralization
at Marmajito is contained predominantly within a N40-50°W trending
massive white quartz vein dipping moderately (35-45°) to the north,
averaging 0.33 m in width, hosted by granodiorite. The Marmajito
Vein occurs in the hanging-wall of the Providencia Vein, some
100-150 meters vertically above The style of mineralization is
characterized by narrow veins hosting two main stages of
mineralization: “Stage 1” is represented by milky quartz,
disseminated pyrite and sphalerite, while “Stage 2” is
characterized by grey quartz and banded pyrite intergrown with
galena. A total of 4 drill holes totaling 1,050 meters) have been
completed so far at Marmajito, with maximum intersection grades of
123.65 g/t Au with 172.6 g/t Ag over 0.93 meters
on the Marmajito Vein.
The table below lists the key intercepts from
the ongoing 2021 in-mine, near mine and brownfield drilling
campaigns since the press release issued on December 21, 2021:
In-Mine and Near-Mine Drill Program |
Hole |
From (m) |
To (m) |
Width (m) |
Au (g/t) |
Ag (g/t) |
Vein |
PROVIDENCIA MINE |
U-G Drilling station PV4940 |
PV-EU-017* |
102.25 |
103.00 |
0.75 |
7.95 |
8.3 |
PRO-FW |
including |
102.61 |
103.00 |
0.39 |
12.00 |
12.6 |
PRO-FW |
PV-EU-019* |
145.95 |
146.50 |
0.55 |
37.33 |
24.2 |
SNO |
PV-EU-019* |
149.25 |
151.70 |
2.45 |
8.30 |
4.9 |
PRO-FW |
including |
149.25 |
150.25 |
1.00 |
12.85 |
2.4 |
PRO-FW |
PV-EU-020* |
99.90 |
100.22 |
0.32 |
18.67 |
15.6 |
PRO-FW |
PV-EU-023* |
93.23 |
94.45 |
1.22 |
6.42 |
5.0 |
PRO-FW |
including |
94.08 |
94.45 |
0.37 |
10.53 |
15.2 |
PRO-FW |
Surface Drilling station PV4675 |
PV-ES-001 |
329.47 |
330.01 |
0.54 |
7.12 |
35.3 |
SNO |
PV-ES-001 |
336.79 |
337.33 |
0.54 |
6.28 |
11.3 |
4320 |
PV-ES-002A |
299.00 |
299.50 |
0.50 |
6.75 |
5.4 |
PRO |
PV-ES-002A |
397.31 |
397.67 |
0.36 |
8.06 |
21.9 |
SNO |
Surface Drilling station PV6545 |
PV-ES-005 |
7.70 |
8.08 |
0.38 |
9.54 |
1.2 |
SNO |
PV-ES-005 |
318.75 |
319.10 |
0.35 |
24.01 |
29.9 |
SNO |
PV-ES-008 |
42.63 |
43.04 |
0.41 |
24.88 |
6.6 |
SNO |
PV-ES-008 |
148.97 |
149.30 |
0.33 |
7.88 |
3.1 |
SNO |
PV-ES-008 |
485.13 |
485.46 |
0.33 |
211.68 |
253.6 |
PRO |
PV-ES-009 |
402.04 |
402.48 |
0.44 |
7.41 |
10.5 |
SNO |
U-G Drilling station PV6190 |
MAR-EU-002* |
34.75 |
35.20 |
0.45 |
6.84 |
14.5 |
2860 |
MAR-EU-002* |
125.70 |
126.01 |
0.31 |
26.65 |
139.5 |
SNO |
SANDRA K MINE |
Surface Drilling station SK5050 |
SK-ES-001 |
337.09 |
338.61 |
1.52 |
3.57 |
4.5 |
SKT |
including |
337.09 |
337.67 |
0.58 |
8.88 |
4.4 |
SKT |
U-G Drilling station SK5675 |
SK-IU-163* |
60.18 |
60.55 |
0.37 |
10.56 |
208.4 |
SNO |
U-G Drilling station SK5290 |
SK-IU-169* |
128.11 |
129.43 |
1.32 |
85.55 |
262.1 |
SKT-HW |
SK-IU-170* |
131.51 |
132.89 |
1.38 |
17.32 |
60.6 |
SKT |
including |
131.51 |
132.15 |
0.64 |
35.27 |
128.1 |
SKT |
SK-IU-171* |
178.88 |
182.53 |
3.65 |
7.43 |
35.0 |
SKT-FW |
including |
181.05 |
181.57 |
0.52 |
46.65 |
214.6 |
SKT-FW |
SK-IU-172* |
93.75 |
94.61 |
0.86 |
8.97 |
26.1 |
SKT-HW |
SK-IU-172* |
98.30 |
100.12 |
1.82 |
20.21 |
77.9 |
SKT |
including |
98.30 |
99.30 |
1.00 |
35.68 |
112.0 |
SKT |
SK-IU-172* |
111.90 |
112.27 |
0.37 |
8.08 |
42.3 |
SKT-FW |
SK-IU-173* |
129.70 |
130.06 |
0.36 |
12.93 |
103.7 |
SKT-HW |
SK-IU-173* |
138.42 |
139.46 |
1.04 |
23.49 |
626.2 |
SKT |
including |
139.00 |
139.46 |
0.46 |
51.64 |
1,412.0 |
SKT |
SK-IU-175* |
155.75 |
157.77 |
2.02 |
54.48 |
99.7 |
SKT-HW |
including |
155.75 |
156.49 |
0.74 |
147.91 |
194.8 |
SKT-HW |
U-G Drilling station SK5480 |
SK-IU-177* |
114.63 |
115.05 |
0.42 |
7.59 |
30.0 |
SKT-FW |
SK-IU-178* |
112.24 |
113.19 |
0.95 |
9.22 |
79.1 |
6640 |
including |
112.81 |
113.19 |
0.38 |
11.70 |
130.0 |
6640 |
SANDRA K MINE – CHUMECA VEIN |
U-G Drilling station CH5110 |
CH-IU-027* |
65.98 |
66.37 |
0.39 |
8.40 |
254.5 |
CHU-FW |
CH-IU-030* |
62.57 |
63.00 |
0.43 |
187.11 |
242.2 |
CHU-HW |
CH-IU-031* |
50.21 |
50.60 |
0.39 |
6.74 |
11.7 |
CHU-HW |
CH-IU-032* |
92.65 |
94.89 |
2.24 |
7.58 |
13.7 |
CHU-FW |
including |
94.33 |
94.89 |
0.56 |
15.90 |
20.5 |
CHU-FW |
El SILENCIO DEEP - DIRECTIONAL DRILLING |
U-G Drilling station ES5690 |
ES-MH07-07** |
884.90 |
885.40 |
0.50 |
15.60 |
9.1 |
450 |
ES-MH07-07** |
953.50 |
954.26 |
0.76 |
16.60 |
29.6 |
NAL-HW |
ES-MH08-01** |
849.31 |
849.89 |
0.58 |
19.54 |
8.5 |
450 |
ES-MH08-01** |
1036.55 |
1037.35 |
0.80 |
15.93 |
0.2 |
VEM |
ES-MH08-02** |
864.37 |
864.92 |
0.55 |
37.16 |
52.5 |
450 |
ES-MH08-02** |
1032.00 |
1033.80 |
1.80 |
23.25 |
117.5 |
VEM |
Including |
1032.76 |
1033.28 |
0.52 |
40.72 |
184.7 |
VEM |
ES-MH08-03** |
881.68 |
884.03 |
2.35 |
5.52 |
9.6 |
450 |
Including |
881.68 |
882.22 |
0.54 |
18.53 |
24.8 |
450 |
ES-MH08-03** |
1025.85 |
1027.86 |
2.01 |
3.18 |
5.1 |
NAL |
Including |
1026.66 |
1027.20 |
0.54 |
7.03 |
11.5 |
NAL |
ES-MH08-03** |
1048.14 |
1051.86 |
3.72 |
20.91 |
71.6 |
VEM |
including |
1050.46 |
1051.03 |
0.57 |
70.56 |
289.5 |
VEM |
Brownfield Drill Program |
MARMAJITO VEIN |
U-G Drilling station PV5630 |
MAR-EU-003* |
268.87 |
269.80 |
0.93 |
123.65 |
172.6 |
MAR |
VERA VEIN |
Surface Drilling station VER5000 |
VER-ES-010 |
187.90 |
188.60 |
0.70 |
15.39 |
3,496.1 |
LLV |
including |
187.90 |
188.20 |
0.30 |
31.78 |
8,150.0 |
LLV* |
* Denotes underground drill holes. The
underground infill holes were drilled at 30 to -90 degrees from the
horizontal. Sample interval grades over 6.0 g/t Au are reported.
Grades are for quartz vein intersections and are length-weighted
composites. The width is the sample length and is not necessarily
the true width of the vein. All gold and silver grades are uncut
and are not diluted to a minimum mining width.
** Denotes directional drilling mother and
kick-off holes. The directional drilling kick-off holes were
drilled at -51 to -57 degrees from the horizontal. Sample interval
grades over 6.0 g/t Au are reported.
Vein name abbreviations: PRO-FW: Providencia
Footwall Vein. 4320: 4320 Vein. 2860: 2860 Vein. SKT: Sandra K
Techo Vein. SKT-HW: Sandra K Techo Hanging-wall. SKT-FW: Sandra K
Techo Footwall. 6640: 6640 Vein. CHU-FW: Chumeca Footwall. 450: 450
Vein. NAL: Nacional Vein.NAL-HW: Nacional Hanging Wall. VEM: Manto
Vein. MAR: Marmajito Vein. LLV: Lluvia Vein. SNO: unnamed
veins.
Results from in-mine drilling are reported for
46 holes (6,337 m) including: 11 holes (1,957 m) at Providencia
(PV-EU-017 to PV-EU-024, MAR-EU-002, 004 and PV-HYDRO-003), 15
holes (2,339 m) at Sandra K (SK-IU-163 to SK-IU-178), except for
hole SK-IU-174 whose results are still pending, and 20 holes (2,041
m) at Chumeca (CH-IU-015 to CH-IU-033 and CH-IU-028A), of which one
was lost. There are no results above cut-off grade for 6 holes at
Providencia, 6 holes at Sandra K and 16 holes at Chumeca and so
these holes are not listed in the table.
Results from near-mine surface exploration
drilling are reported for 16 holes (6,719 m) including: 11 holes
(4,724 m) at Providencia (PV-ES-001 to PV-ES-010) of which one was
lost, and 5 holes (1,995 m) at Sandra K (SK-ES-001 to SK-ES-005).
There are no results above cut-off grade for 6 holes at Providencia
and 4 holes at Sandra K and these holes are not listed in the
table.
Results from brownfield exploration drilling are
reported for 11 holes (3,190 m) including: 7 holes (2,140 m) at
Vera (VER-ES-009 to VER-ES-015) and 4 holes (1,050 m) at Marmajito
(MAR-EU-001, 003, 005 and 006). There are no results above cut-off
grade for 6 holes at Vera and 3 holes at Marmajito and these are
not listed in the table.
Results from directional drilling from one
purpose-built station at El Silencio are reported from 4 kick-off
holes (ES-MH07-07 and ES-MH08-01 to ES-MH08-03), totaling 2,319 m,
all drilled on the southern ore-shoot. In addition, 527 meters were
drilled in one mother hole (ES-MH-008).
Please refer also to the attached illustrative
maps showing the Providencia, Sandra K, Chumeca, El Silencio, Vera
and Marmajito drilling programs and the Segovia Exploration Update
presentation on the Company’s website at
www.grancolombiagold.com.
Qualified Person
Dr. Stewart D. Redwood, PhD, FIMMM, FGS, Senior
Consulting Geologist to the Company, is a qualified person as
defined by National Instrument 43-101 – Standards of Disclosure or
Mineral Projects and prepared or reviewed the preparation of the
scientific and technical information in this press release.
Verification included a review of the quality assurance and quality
control samples, and review of the applicable assay databases and
assay certificates.
Quality Assurance and Quality
Control
The Segovia samples were prepared and assayed by
SGS Laboratories Ltd (ISO 9001:2008) at their laboratory in
Medellin. Gold was assayed by 30 g fire assay with atomic
absorption spectrophotometer (“AAS”) finish. Samples above the
upper detection limit of 10.0 g/t gold were re-assayed by 30 g fire
assay with gravimetric finish. Silver was assayed by aqua regia
digestion and AAS finish. Silver samples above 500 g/t were
re-assayed by nitric and hydrochloric acid digestion with AAS
finish for ore grades and the highest in grade double-checked by
SGS Laboratories Ltd. in Lima, Peru. Blank, standard and duplicate
samples were routinely inserted and monitored for quality assurance
and quality control.
About Gran Colombia Gold
Corp.
Gran Colombia is a mid-tier gold producer with a
proven track record of mine building and operating in Latin
America. In Colombia, the Company is currently the largest
underground gold and silver producer with several mines in
operation at its high-grade Segovia Operations. In Guyana, the
Company is advancing the Toroparu Project, one of the largest
undeveloped gold projects in the Americas. Gran Colombia also owns
approximately 44% of Aris Gold Corporation (TSX: ARIS) (Colombia –
Marmato), an approximately 27% equity interest in Denarius Silver
Corp. (TSX-V: DSLV) (Spain – Lomero-Poyatos; Colombia – Guia
Antigua and Zancudo) and an approximately 26% equity interest in
Western Atlas Resources Inc. (TSX-V: WA) (Nunavut –
Meadowbank).
Additional information on Gran Colombia can be
found on its website at www.grancolombiagold.com and by reviewing
its profile on SEDAR at www.sedar.com.
Cautionary Statement on Forward-Looking
Information
This news release contains "forward-looking
information", which may include, but is not limited to, statements
with respect to anticipated business plans or strategies, including
exploration programs and mineral resources and reserves. Often, but
not always, forward-looking statements can be identified by the use
of words such as "plans", "expects", "is expected", "budget",
"scheduled", "estimates", "forecasts", "intends", "anticipates", or
"believes" or variations (including negative variations) of such
words and phrases, or state that certain actions, events or results
"may", "could", "would", "might" or "will" be taken, occur or be
achieved. Forward-looking statements involve known and unknown
risks, uncertainties and other factors which may cause the actual
results, performance or achievements of Gran Colombia to be
materially different from any future results, performance or
achievements expressed or implied by the forward-looking
statements. Factors that could cause actual results to differ
materially from those anticipated in these forward-looking
statements are described under the caption "Risk Factors" in the
Company's Annual Information Form dated as of March 31, 2021 which
is available for view on SEDAR at www.sedar.com. Forward-looking
statements contained herein are made as of the date of this press
release and Gran Colombia disclaims, other than as required by law,
any obligation to update any forward-looking statements whether as
a result of new information, results, future events, circumstances,
or if management's estimates or opinions should change, or
otherwise. There can be no assurance that forward-looking
statements will prove to be accurate, as actual results and future
events could differ materially from those anticipated in such
statements. Accordingly, the reader is cautioned not to place undue
reliance on forward-looking statements.
For Further Information,
Contact:Mike DaviesChief Financial Officer(416)
360-4653investorrelations@grancolombiagold.com
Attachment 1 – Providencia Mine Drilling
Grade Intercepts is available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/26069901-76ef-45c9-ae44-40fdc131fae7
Attachment 2 – Cross section of the
Providencia Mine vein system is available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/a9651627-85cc-4937-9b4e-d1aefa7577c4
Attachment 3 – Sandra K Mine In-fill
Drilling Grade Intercepts is available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/dbebb9e1-6eb2-4572-9dd2-27cfbe1bf95d
Attachment 4 – Cross section of the
Sandra K vein system is available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/9d3a0914-516f-4d4f-a556-030dfb728d4a
Attachment 5 – Chumeca Project Drilling
Grade Intercepts is available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/0ffa9a79-6dee-411f-a799-b54dc27e0ddf
Attachment 6 – El Silencio Deep vein
system In-fill Drilling Grade Intercepts is available
at
https://www.globenewswire.com/NewsRoom/AttachmentNg/b2905335-a4c5-4bad-9b23-db6db9dc7541
Attachment 7 – Cross section of the El
Silencio Deep vein system is available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/8cf752dd-892e-4180-aa6d-d7b66403ae9d
Attachment 8 – Vera Project Drilling
Grade Intercepts is available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/b85aff43-ecc6-4936-b5bd-e2ef1b708ec9
Attachment 9 – Cross section of the Vera
vein system is available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/2a5fec60-ebce-4c81-adf3-40763eaa3ceb
Attachment 10 – Marmajito Project
Drilling Grade Intercepts is available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/c296a691-b88c-4ff6-b4fd-2382024539b9
Attachment 11 – Cross section of the
Marmajito vein system is available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/ddb5dda0-6e02-4d96-a451-3672bcd1d2b0
GCM Mining (TSX:GCM)
Historical Stock Chart
Von Mär 2024 bis Apr 2024
GCM Mining (TSX:GCM)
Historical Stock Chart
Von Apr 2023 bis Apr 2024