Stantec Provides Design Services for Second Project for Trillium Health Partners in Ontario
15 März 2022 - 11:45AM
TSX, NYSE: STN
Stantec, a global leader in sustainable design and engineering,
was selected to provide planning, design, and conformance services
for Trillium Health Partners’ (THP) Mississauga Hospital project.
The new facility is a full replacement of the existing hospital and
a critical part of THP’s plan to build a new kind of healthcare
that serves the growing and diverse community for the decades
ahead.
The new Mississauga Hospital will increase flexibility to
respond to future healthcare challenges, feature modern hospital
facilities and technology, and reflect the latest standards in
infection prevention and control. It will continue to deliver
highly specialized care through regional programs, such as the
regional centre for advanced cardiac surgery and neurosurgery
services among others.
At approximately 2.8 million square feet (260,000 square metres)
and rising 24 storeys, the new hospital will nearly triple THP’s
care capacity, becoming the largest hospital in Canada. To meet the
needs of the growing Mississauga community, the replacement
facility will offer more than 950 beds. The number of operating
rooms will increase to 23, up from the current 14.
THP’s emergency department, one of the busiest in Canada, will
significantly expand to improve patient experience and reduce wait
times. Also housed in the new hospital will be advanced diagnostic
imaging facilities and a new pharmacy and clinical laboratory.
“Critical health infrastructure, like Trillium Health Partners’
Mississauga site, are essential to advance quality healthcare in
Ontario and keep our diverse communities healthy,” said Suzanne
Crysdale, principal for Stantec. “We are exceptionally proud to
design a place which enhances community cohesion and where patients
feel welcomed, safe, and comforted while receiving advanced
care.”
Designing for care across OntarioStantec’s work
for THP includes two of several major healthcare projects the firm
has designed in Ontario in recent years, including Cortellucci
Vaughan Hospital’s new 1.2 million-square-foot facility, Cambridge
Memorial Hospital’s new patient care wing, Brockville General
Hospital’s Phase 2 Complex Continuing Care, Mental Health, and
Rehabilitation project, and Centre for Addiction and Mental
Health’s Phase 1C Redevelopment. Through the power of design,
Stantec is advancing health and wellness worldwide and increasing
access to critical health services for everyone in the province.
Learn more about Stantec’s healthcare work here.
About StantecCommunities are fundamental.
Whether around the corner or across the globe, they provide a
foundation, a sense of place and of belonging. That's why at
Stantec, we always design with community in
mind.
We care about the communities we serve—because they're our
communities too. This allows us to assess what's needed and connect
our expertise, to appreciate nuances and envision what's never been
considered, to bring together diverse perspectives so we can
collaborate toward a shared success.
We're designers, engineers, scientists, and project managers,
innovating together at the intersection of community, creativity,
and client relationships. Balancing these priorities results in
projects that advance the quality of life in communities across the
globe.
Stantec trades on the TSX and the NYSE under the symbol STN.
Visit us at stantec.com or find us on social media.
Cautionary Note Regarding Forward-Looking
StatementsThis news release contains forward-looking
statements regarding the project described above. Forward-looking
statements also include any other statements that do not refer to
historical facts. By their nature, forward-looking statements are
based on assumptions and subject to inherent risks and
uncertainties. There is a risk that the project described above may
be delayed, cancelled, suspended or terminated. This could cause
future results to differ materially from the forward-looking
statements made in this news release. Except as may be required by
law, Stantec undertakes no obligation to publicly update or revise
any forward-looking statements. Forward-looking statements are
provided herein for the purpose of giving information about the
project referred to above and its expected impact. Readers are
cautioned that such information may not be appropriate for other
purposes.
Media Contact
Danny CraigStantec Media Relations
Ph (949)
632-6319danny.craig@stantec.com
Investor Relations ContactTom McMillanStantec
Investor RelationsPh (780) 917-8159tom.mcmillan@stantec.com
To subscribe to Stantec’s email news alerts, please fill out the
subscription form, which is available on the Contact Information
page of the Investors section at Stantec.com.
Stantec (TSX:STN)
Historical Stock Chart
Von Mär 2024 bis Apr 2024
Stantec (TSX:STN)
Historical Stock Chart
Von Apr 2023 bis Apr 2024